Shop Testing of Major Turbomachinery in Oil & Gas EPC Projects - Cost Savings & Schedule Impact
View through CrossRef
Abstract
Turbomachinery for oil and gas EPC projects are shop tested to minimize the plant start-up risks and assure a trouble-free operation. However the extent of testing of turbomachinery vary with each project, though the minimum requirements dictated by the international codes and standards shall be met. In fact testing activities for turbomachinery are expensive, and specifying additional tests on top of the minimum requirements; which are narrated in this paper for major turbomachinery, need to be technically and commercially justified. Defining the extent of testing depends on several key factors which are listed and illustrated in this article. The Owner; in collaboration with the Contractor, is responsible to approve the required tests for a certain equipment based on critical analysis and a trade-off between risk, cost and schedule. However manufacturers' testing capacities do not always meet the testing requirements, this needs to be considered when specifying tests, else a test bed upgrade is necessary if the Owner is ready to contribute to the cost. This article surfs through the topic of shop testing for turbomachinery presenting best practices and lessons learnt from recent oil & gas EPC projects.
Title: Shop Testing of Major Turbomachinery in Oil & Gas EPC Projects - Cost Savings & Schedule Impact
Description:
Abstract
Turbomachinery for oil and gas EPC projects are shop tested to minimize the plant start-up risks and assure a trouble-free operation.
However the extent of testing of turbomachinery vary with each project, though the minimum requirements dictated by the international codes and standards shall be met.
In fact testing activities for turbomachinery are expensive, and specifying additional tests on top of the minimum requirements; which are narrated in this paper for major turbomachinery, need to be technically and commercially justified.
Defining the extent of testing depends on several key factors which are listed and illustrated in this article.
The Owner; in collaboration with the Contractor, is responsible to approve the required tests for a certain equipment based on critical analysis and a trade-off between risk, cost and schedule.
However manufacturers' testing capacities do not always meet the testing requirements, this needs to be considered when specifying tests, else a test bed upgrade is necessary if the Owner is ready to contribute to the cost.
This article surfs through the topic of shop testing for turbomachinery presenting best practices and lessons learnt from recent oil & gas EPC projects.
Related Results
L᾽«unilinguisme» officiel de Constantinople byzantine (VIIe-XIIe s.)
L᾽«unilinguisme» officiel de Constantinople byzantine (VIIe-XIIe s.)
<p>Νίκος Οικονομίδης</...
Cometary Physics Laboratory: spectrophotometric experiments
Cometary Physics Laboratory: spectrophotometric experiments
<p><strong><span dir="ltr" role="presentation">1. Introduction</span></strong&...
North Syrian Mortaria and Other Late Roman Personal and Utility Objects Bearing Inscriptions of Good Luck
North Syrian Mortaria and Other Late Roman Personal and Utility Objects Bearing Inscriptions of Good Luck
<span style="font-size: 11pt; color: black; font-family: 'Times New Roman','serif'">ΠΗΛΙΝΑ ΙΓ&Delta...
Morphometry of an hexagonal pit crater in Pavonis Mons, Mars
Morphometry of an hexagonal pit crater in Pavonis Mons, Mars
<p><strong>Introduction:</strong></p>
<p>Pit craters are peculiar depressions found in almost every terrestria...
Un manoscritto equivocato del copista santo Theophilos († 1548)
Un manoscritto equivocato del copista santo Theophilos († 1548)
<p><font size="3"><span class="A1"><span style="font-family: 'Times New Roman','serif'">ΕΝΑ ΛΑΝ&...
Ballistic landslides on comet 67P/Churyumov–Gerasimenko
Ballistic landslides on comet 67P/Churyumov–Gerasimenko
<p><strong>Introduction:</strong></p><p>The slow ejecta (i.e., with velocity lower than escape velocity) and l...
Stress transfer process in doublet events studied by numerical TREMOL simulations: Study case Ometepec 1982 Doublet.
Stress transfer process in doublet events studied by numerical TREMOL simulations: Study case Ometepec 1982 Doublet.
<pre class="western"><span><span lang="en-US">Earthquake doublets are a characteristic rupture <...
Effects of a new land surface parametrization scheme on thermal extremes in a Regional Climate Model
Effects of a new land surface parametrization scheme on thermal extremes in a Regional Climate Model
<p><span>The </span><span>EFRE project Big Data@Geo aims at providing high resolution </span><span&...