Javascript must be enabled to continue!
Performance Demonstration Programs for Steam Generator Tubing Analysts in Korea
View through CrossRef
The Korea Electric Power Research Institute established performance demonstration programs for non-destructive examination personnel who analyze eddy current data for steam generator tubing in the nuclear power plant. The purpose of these performance demonstration programs is to ensure a uniform knowledge and skill level of data analysts and contribute to safely operate the nuclear power plant. In Korea, there have been many changes in non-destructive examination of steam generator tubing such as inspection scope, plugging criteria and qualification requirements. According to the Notice 2008-23 revised by the Ministry of Education, Science and Technology, the analyst for steam generator tubing shall be qualified as the qualified data analyst, and the site specific performance demonstration program shall be implemented for them. KEPRI developed these performance demonstration programs and they are being successfully implemented. The analyst's performance is expected to be improved by the implementation of these programs.
Title: Performance Demonstration Programs for Steam Generator Tubing Analysts in Korea
Description:
The Korea Electric Power Research Institute established performance demonstration programs for non-destructive examination personnel who analyze eddy current data for steam generator tubing in the nuclear power plant.
The purpose of these performance demonstration programs is to ensure a uniform knowledge and skill level of data analysts and contribute to safely operate the nuclear power plant.
In Korea, there have been many changes in non-destructive examination of steam generator tubing such as inspection scope, plugging criteria and qualification requirements.
According to the Notice 2008-23 revised by the Ministry of Education, Science and Technology, the analyst for steam generator tubing shall be qualified as the qualified data analyst, and the site specific performance demonstration program shall be implemented for them.
KEPRI developed these performance demonstration programs and they are being successfully implemented.
The analyst's performance is expected to be improved by the implementation of these programs.
Related Results
The Hot Test of Primary Separation Equipment of Steam Generator for CAP1400 Nuclear Power Plant
The Hot Test of Primary Separation Equipment of Steam Generator for CAP1400 Nuclear Power Plant
A new type of Steam separator for CAP1400 Steam Generator is introduced. The result of characteristic experiment, the variables of which contain steam load, saturated water flow an...
TINBOP Cyclic Steam Injection Enhances Oil Recovery in Mature Steamfloods
TINBOP Cyclic Steam Injection Enhances Oil Recovery in Mature Steamfloods
Abstract
In a previous paper (SPE/PS-CIM/CHOA 97850), we presented our findings on a novel cyclic steam injection method that we developed. The Top-Injection Bott...
DESIGN CHARACTERISTICS OF THE HORIZONTAL STEAM GENERATOR PGV-1000
DESIGN CHARACTERISTICS OF THE HORIZONTAL STEAM GENERATOR PGV-1000
The materials of the article consider the design characteristics of horizontal steam generators PGV-1000 for WWER NPPs. The NPP steam generator, in particular the PGV-1000 steam ge...
STUDI ANALISIS EFISIENSI STEAM TURBINE GENERATOR PADA BAGIAN ASAM SULFAT DAN UTILITAS DEPARTEMEN PRODUKSI IIIB PT PETROKIMIA GRESIK
STUDI ANALISIS EFISIENSI STEAM TURBINE GENERATOR PADA BAGIAN ASAM SULFAT DAN UTILITAS DEPARTEMEN PRODUKSI IIIB PT PETROKIMIA GRESIK
Sejumlah energi penggerak peralatan proses sangat diperlukan dalam proses produksi di seluruh pabrik yang ada pada PT Petrokimia Gresik. Departemen Produksi IIIB memiliki unit util...
Steam-CO Recovery Processes For Bottom Water Oil Reservoirs
Steam-CO Recovery Processes For Bottom Water Oil Reservoirs
Abstract
Based on Pujol and Boberg's scaling criteria, a series of experiments on steam-CO2 injection strategies was conducted in a high temperature, high pressur...
Jointed Tubing Injector Snubbing on Extended Reach Wells
Jointed Tubing Injector Snubbing on Extended Reach Wells
Abstract
OBJECTIVE / SCOPE
An injector has been developed that is able to continuously move conventional jointed tubing in and o...
Pressure Transient Analysis in SAGD
Pressure Transient Analysis in SAGD
Abstract
Steam-Assisted Gravity Drainage (SAGD) is an in-situ thermal recovery technique used at Petro-Canada's MacKay River Project. SAGD utilizes pairs of horiz...
Prebending Coiled Tubing and Its Fatigue Life Prediction
Prebending Coiled Tubing and Its Fatigue Life Prediction
Coiled tubing is widely used in oil drilling and production operations. However, extreme high stress variation of coiled tubing during the processes of pulling out, rolling in the ...