Qualification and Assessment of Subsea Insulation Systems
View through CrossRef
As offshore oil and gas production continues to push into deeper waters, subsea production systems are challenged to manage the inherently higher operating temperatures and pressures. As a consequence of their direct exposure to seawater, subsea “wet” insulation systems on subsea trees, manifolds, and jumpers are amongst the most affected by this progression. Due to the significant thermal gradient between the production stream and subsea environment, subsea insulation systems are constantly trying to inhibit the natural heat transfer. In an effort preserve the operational integrity of the production system, the subsea insulation system maintains the production stream temperature above the hydrate formation and wax deposition temperatures. Thus, any failures such as cracks, disbondment, or hydrolysis, substantially influence the subsea system’s operational philosophy. As a result of ExxonMobil’s observed performance challenges with wet insulation systems, a thorough qualification program was initiated in 2007 to validate the performance of a wet insulation system under simulated service conditions. The qualification consisted of 3 test phases, including basic material property tests, simulated service tests, and an extended service test, for multiple insulation systems. This paper presents an overview of select subsea insulation failures, the qualification program, and subsequent assessment of key material properties, such as tensile strength/elongation, density, and hardness.
American Society of Mechanical Engineers
Title: Qualification and Assessment of Subsea Insulation Systems
Description:
As offshore oil and gas production continues to push into deeper waters, subsea production systems are challenged to manage the inherently higher operating temperatures and pressures.
As a consequence of their direct exposure to seawater, subsea “wet” insulation systems on subsea trees, manifolds, and jumpers are amongst the most affected by this progression.
Due to the significant thermal gradient between the production stream and subsea environment, subsea insulation systems are constantly trying to inhibit the natural heat transfer.
In an effort preserve the operational integrity of the production system, the subsea insulation system maintains the production stream temperature above the hydrate formation and wax deposition temperatures.
Thus, any failures such as cracks, disbondment, or hydrolysis, substantially influence the subsea system’s operational philosophy.
As a result of ExxonMobil’s observed performance challenges with wet insulation systems, a thorough qualification program was initiated in 2007 to validate the performance of a wet insulation system under simulated service conditions.
The qualification consisted of 3 test phases, including basic material property tests, simulated service tests, and an extended service test, for multiple insulation systems.
This paper presents an overview of select subsea insulation failures, the qualification program, and subsequent assessment of key material properties, such as tensile strength/elongation, density, and hardness.
Related Results
Subsea Factory–Standardization of the Brownfield Factory
Subsea Factory–Standardization of the Brownfield Factory
Abstract
As part of the corporate technology strategy Statoil has launched a technology plan for the Subsea Factory concept. The plan describes how to combine subsea...
Ormen Lange Subsea Production System
Ormen Lange Subsea Production System
Abstract
This paper presents the concept and the technical solutions developed and applied to the Ormen Lange subsea production system. First, the key technical c...
Subsea Facilities
Subsea Facilities
Abstract
This paper presents the system design and concept solutions selected for the Ormen Lange subsea facilities.
The field is located in a r...
Subsea Production Controls-The Trend Toward Simplification
Subsea Production Controls-The Trend Toward Simplification
Abstract
Control of subsea wellheads has evolved from the earliest diver operated wellheads to systems involving sophisticated electro-hydraulic techniques. With ...
Design, Installation, And Connection Of Subsea Lines On East Frigg Field
Design, Installation, And Connection Of Subsea Lines On East Frigg Field
ABSTRACT
This paper describes the subsea network which interconnects the three subsea templates at EAST FRIGG field, and connects this field to the FRIGG field, 1...
Subsea Separation and Reinjection of Produced Water
Subsea Separation and Reinjection of Produced Water
Abstract
Some of the most significant recent development in subsea design has been within subsea processing, in particular the removal of produced water from the ...
Subsea Concept Alternatives for Brazilian Pre-Salt Fields
Subsea Concept Alternatives for Brazilian Pre-Salt Fields
The objective is to identify and compare subsea development concept alternatives for typical Brazilian pre-salt deep water applications, based on generic system functional requirem...
Persistent Unmanned Surface Vehicles for Subsea Support
Persistent Unmanned Surface Vehicles for Subsea Support
Abstract
This paper discusses the role of unmanned systems in subsea support. Recent developments in mobile unmanned vehicle networks are reviewed, demonstrating ...