Javascript must be enabled to continue!
HOV access location analysis at Erin Mills Parkway and Highway 403
View through CrossRef
High Occupancy Vehicle (HOV) lanes are one [of] the most commonly used methods to reduce the number of vehicles on the road network. HOV provides a faster and reliable option to single occupancy vehicles, thus inducing more people to car pool. The success of HOV lanes depends on the reduction of travel time and increased trip reliability. Therefore, in order to reduce travel time and improve trip reliability this study emphasizes on the HOV access location relative to an access ramp. In this case we have chosen the interchange at Erin Mills Parkway and Highway 403 as a subject of our study. The study was divided into 2 parts, namely the field review and simulation of different options in order to optimize the HOV access location. During the field review it was found that 75% of the vehicles are in a position to enter the HOV lane 200m upstream of the exiting access location. Also, approximately 35% of vehicles were jumping the buffer before the start of the access location. In the second part of the study a total of 6 options were explored using VISSIM micro simulation software. The results of the simulation showed that the access location 200m downstream of the Speed Change Lane with a total access length of 600m is the best option. In addition, it was found that buffer separated HOV lane operate better then HOV lane without a buffer zone. This can be attributed to the increase of HOV lane for short trips, which increases the traffic volume on the HOV lane.
Title: HOV access location analysis at Erin Mills Parkway and Highway 403
Description:
High Occupancy Vehicle (HOV) lanes are one [of] the most commonly used methods to reduce the number of vehicles on the road network.
HOV provides a faster and reliable option to single occupancy vehicles, thus inducing more people to car pool.
The success of HOV lanes depends on the reduction of travel time and increased trip reliability.
Therefore, in order to reduce travel time and improve trip reliability this study emphasizes on the HOV access location relative to an access ramp.
In this case we have chosen the interchange at Erin Mills Parkway and Highway 403 as a subject of our study.
The study was divided into 2 parts, namely the field review and simulation of different options in order to optimize the HOV access location.
During the field review it was found that 75% of the vehicles are in a position to enter the HOV lane 200m upstream of the exiting access location.
Also, approximately 35% of vehicles were jumping the buffer before the start of the access location.
In the second part of the study a total of 6 options were explored using VISSIM micro simulation software.
The results of the simulation showed that the access location 200m downstream of the Speed Change Lane with a total access length of 600m is the best option.
In addition, it was found that buffer separated HOV lane operate better then HOV lane without a buffer zone.
This can be attributed to the increase of HOV lane for short trips, which increases the traffic volume on the HOV lane.
Related Results
HOV access location analysis at Erin Mills Parkway and Highway 403
HOV access location analysis at Erin Mills Parkway and Highway 403
High Occupancy Vehicle (HOV) lanes are one [of] the most commonly used methods to reduce the number of vehicles on the road network. HOV provides a faster and reliable option to si...
Research on HOV Space Motion Mathematical Model
Research on HOV Space Motion Mathematical Model
Human Occupied Vehicle(HOV) is a typical system which is characterized by high nonlinearities,couplings,uncertainties and multi-stance 3D movement.It requires quite exact descripti...
A New Method for Calculating Highway Blocking due to High Impact Weather Conditions
A New Method for Calculating Highway Blocking due to High Impact Weather Conditions
 Fog, rain, snow, and icing are the high-impact weather events often lead to the highway blockings, which in turn causes serious economic and human losses. At present, the...
A Study on Comprehensive Evaluation of Deep-Sea HOV Cockpit Console Based on Fuzzy Gravity Center
A Study on Comprehensive Evaluation of Deep-Sea HOV Cockpit Console Based on Fuzzy Gravity Center
The cockpit console is an important part in the deep-sea human occupied vehicle (HOV). The comprehensive evaluation of HOV cockpit console is a multi-target and multi-hierarchical ...
Prerequisite for Converting High Occupancy Vehicle (HOV) Lanes to High-Occupancy/Toll (HOT) Lanes
Prerequisite for Converting High Occupancy Vehicle (HOV) Lanes to High-Occupancy/Toll (HOT) Lanes
High-occupancy/toll (HOT) lanes have emerged as an increasingly popular form of lane management strategy. A realistic cellular automaton model is constructed to analyze the prerequ...
Research on Classification of Highway Service Areas Based on Multifactor Clustering
Research on Classification of Highway Service Areas Based on Multifactor Clustering
Abstract
The current classification of highway service areas is primarily based on qualitative analysis, which lacks consistent standards and fails to meet the requirements...
Design of highway pavement earthquake damage prediction method considering horizontal earthquake force
Design of highway pavement earthquake damage prediction method considering horizontal earthquake force
Due to the influence of geographical environment and horizontal seismic force, it is difficult to predict the seismic damage of urban highway pavement. In addition, poor engineerin...
Reflections on the evolution of a long-term study of airline cultures: an interview with Albert J. Mills and Jean Helms Mills
Reflections on the evolution of a long-term study of airline cultures: an interview with Albert J. Mills and Jean Helms Mills
PurposeThe aim of this paper is to provide insights on Albert J. Mills' and Jean Helms Mills' lifelong methodological journey in the airline culture. The interview offers a retrosp...

