Javascript must be enabled to continue!
Ekofisk II - Planning for Low Operating Costs Through Lifetime
View through CrossRef
Abstract
The age of the existing Ekofisk platforms, together with the fact that they are sinking due to subsidence caused by compaction of the reservoir formation, has made the Ekofisk II redevelopment to extend the economic life of the gigantic North Sea Ekofisk field necessary. The redevelopment of the existing Ekofisk Center comprising ten platforms with two new platforms, 2/4X and 2/45, brought about the challenge to drastically reduce the operating costs to support the extension of the economic life well into the next century. The new Ekofisk II facilities including pipelines have a design life to year 2028, extending the field life from the original production license end date of year 2011. The design accommodates 20 meters of total subsidence. The new platforms are based on the best available proven technology. The design is based on life cycle cost effectiveness. Equipment supplier involvement and functional specifications have been implemented. Operations and maintenance expertise have been an integral part of the project team to ensure that the design is geared toward cost effective maintenance. Planning for low operating costs through lifetime have included measures from the very start of the project through all phases of the project. At the heart of these measures has been a systematic approach to through lifetime cost considerations as well as extensive involvement of operations personnel from day one. The new fit for purpose facilities with reduced staffing requirements have provided the basis for achieving a cost effective operation of Ekofisk.
Introduction
The Ekofisk Area fields (Production License 018) comprise eight fields in the southern part of the Norwegian Sector of the North Sea, Figure 1. The Ekofisk Field development has since the discovery in 1969 followed by a pilot production start in 1971, progressed through several phases the last being the implementation of full field waterflood. Figure 2 shows the historic and forecasted Ekofisk Field BOE production profile. The first Ekofisk Field permanent development installations which became operational in 1974, consisted of three drilling and production platforms (2/4A, 2/4B and 2/4C), a field terminal platform (2/4FTP), a concrete gravity base crude oil storage tank (2/4T) and quarters platform (2/4Q). Crude oil export was through offshore buoy loading and gas was either injected or flared. A subsequent phase included the installation of export pipelines for oil and gas and further facilities for processing (2/4T), export of crude oil (2/4P) and export of gas (2/4R). Export of crude oil commenced in 1975 and gas in 1977. Parallel activities included the development of most other fields in the Production License 018 area all which were tied into the central processing and transportation facilities at the Ekofisk Field. The West Ekofisk and Cod Fields came on stream in 1997, the Tor Field in 1978, the Albuskjell, Eldfisk and Edda Fields in 1979 and the Embla Field in 1993. Several third party fields have also been tied into the central facilities at Ekofisk for processing and/or transportation. This includes the Ula and Gyda Fields operated by BP, the Tommeliten Field operated by Statoil, the Valhall and Hod Fields operated by Amoco and Norsk Hydro's Mime Field (now shut down).
Title: Ekofisk II - Planning for Low Operating Costs Through Lifetime
Description:
Abstract
The age of the existing Ekofisk platforms, together with the fact that they are sinking due to subsidence caused by compaction of the reservoir formation, has made the Ekofisk II redevelopment to extend the economic life of the gigantic North Sea Ekofisk field necessary.
The redevelopment of the existing Ekofisk Center comprising ten platforms with two new platforms, 2/4X and 2/45, brought about the challenge to drastically reduce the operating costs to support the extension of the economic life well into the next century.
The new Ekofisk II facilities including pipelines have a design life to year 2028, extending the field life from the original production license end date of year 2011.
The design accommodates 20 meters of total subsidence.
The new platforms are based on the best available proven technology.
The design is based on life cycle cost effectiveness.
Equipment supplier involvement and functional specifications have been implemented.
Operations and maintenance expertise have been an integral part of the project team to ensure that the design is geared toward cost effective maintenance.
Planning for low operating costs through lifetime have included measures from the very start of the project through all phases of the project.
At the heart of these measures has been a systematic approach to through lifetime cost considerations as well as extensive involvement of operations personnel from day one.
The new fit for purpose facilities with reduced staffing requirements have provided the basis for achieving a cost effective operation of Ekofisk.
Introduction
The Ekofisk Area fields (Production License 018) comprise eight fields in the southern part of the Norwegian Sector of the North Sea, Figure 1.
The Ekofisk Field development has since the discovery in 1969 followed by a pilot production start in 1971, progressed through several phases the last being the implementation of full field waterflood.
Figure 2 shows the historic and forecasted Ekofisk Field BOE production profile.
The first Ekofisk Field permanent development installations which became operational in 1974, consisted of three drilling and production platforms (2/4A, 2/4B and 2/4C), a field terminal platform (2/4FTP), a concrete gravity base crude oil storage tank (2/4T) and quarters platform (2/4Q).
Crude oil export was through offshore buoy loading and gas was either injected or flared.
A subsequent phase included the installation of export pipelines for oil and gas and further facilities for processing (2/4T), export of crude oil (2/4P) and export of gas (2/4R).
Export of crude oil commenced in 1975 and gas in 1977.
Parallel activities included the development of most other fields in the Production License 018 area all which were tied into the central processing and transportation facilities at the Ekofisk Field.
The West Ekofisk and Cod Fields came on stream in 1997, the Tor Field in 1978, the Albuskjell, Eldfisk and Edda Fields in 1979 and the Embla Field in 1993.
Several third party fields have also been tied into the central facilities at Ekofisk for processing and/or transportation.
This includes the Ula and Gyda Fields operated by BP, the Tommeliten Field operated by Statoil, the Valhall and Hod Fields operated by Amoco and Norsk Hydro's Mime Field (now shut down).
Related Results
Reservoir Aspects Of Ekofisk Subsidence
Reservoir Aspects Of Ekofisk Subsidence
ABSTRACT
In November 1984 Phillips Petroleum Company discovered subsidence of the seabed overlying the Ekofisk oil reservoirs offshore Norway. This phenomenon is ...
The Development History Of Greater Ekofisk
The Development History Of Greater Ekofisk
Abstract
The Ekofisk Field, discovered in 1969, at a time when exploratory interest in the hostile North Sea was beginning to wane, marked the beginning of a new ...
Healthcare Utilization and Imputed Costs of Acute Myeloid Leukemia Patients By FLT3 Status and Early Midostaurin Use at a Comprehensive Cancer Center
Healthcare Utilization and Imputed Costs of Acute Myeloid Leukemia Patients By FLT3 Status and Early Midostaurin Use at a Comprehensive Cancer Center
Abstract
INTRODUCTION: Mutation of FLT3, a tyrosine kinase receptor, is one of the most common molecular alterations in AML. In 2017, the FDA approved midostaurin fo...
Research on fluorescence lifetime dynamics of quantum dot by single photons modulation spectrum
Research on fluorescence lifetime dynamics of quantum dot by single photons modulation spectrum
Fluorescence lifetime is an important characteristic parameter of quantum dot, which plays an important role in studying the optical properties of quantum dot. As a common method t...
Ekofisk Field Overburden Modelling
Ekofisk Field Overburden Modelling
Abstract
In weak formations, significant pressure depletion may lead to compaction. Transmission of compaction through the rock layers overlying the depleted form...
On the lifetime of wireless sensor networks
On the lifetime of wireless sensor networks
Network lifetime has become the key characteristic for evaluating sensor networks in an application-specific way. Especially the availability of nodes, the sensor coverage, and the...
Influence of Metal Impurities on Lifetime
Influence of Metal Impurities on Lifetime
Influence of Fe, Ni and Cu contamination on lifetime in Si wafers was studied by microwave photoconductive decay (μ -PCD), surface photovoltage (SPV) and MOS C-t methods. Lifetime ...
The North Sea Andrea storm and numerical simulations
The North Sea Andrea storm and numerical simulations
Abstract. A coupling of a spectral wave model with a nonlinear phase-resolving model is used to reconstruct the evolution of wave statistics during a storm crossing the North Sea o...