Extension of some project scheduling heuristics and their comparison at low and high levels of resource requirement

View through CrossRef
Some of the most frequently used scheduling heuristics for resource constrained projects are Activity Time (ACTIM), Activity Resource (ACTRES) and Resource Over Time (ROT) which are based on Brook's Algorithm (BAG). These heuristics assign resources based upon the priority values of the activities that can be scheduled. In the first part of this study, these heuristics have been modified such that when more than two activities are allowed to be assigned, depending upon the priority rule, that activity is assigned first overriding the priority rule, which, if assigned, will result in minimum resource idle time (MRIT). MRIT is found to improve the performance of these existing heuristics. The second part of the study investigates the performance of these heuristics at high and low levels of resource requirement by each activity. ACTIM was found to perform better than other heuristics at the low level. At the high level, all the heuristics performed equally well.
Ryerson University Library and Archives
Title: Extension of some project scheduling heuristics and their comparison at low and high levels of resource requirement
Description:
Some of the most frequently used scheduling heuristics for resource constrained projects are Activity Time (ACTIM), Activity Resource (ACTRES) and Resource Over Time (ROT) which are based on Brook's Algorithm (BAG).
These heuristics assign resources based upon the priority values of the activities that can be scheduled.
In the first part of this study, these heuristics have been modified such that when more than two activities are allowed to be assigned, depending upon the priority rule, that activity is assigned first overriding the priority rule, which, if assigned, will result in minimum resource idle time (MRIT).
MRIT is found to improve the performance of these existing heuristics.
The second part of the study investigates the performance of these heuristics at high and low levels of resource requirement by each activity.
ACTIM was found to perform better than other heuristics at the low level.
At the high level, all the heuristics performed equally well.

Related Results

Extension of some project scheduling heuristics and their comparison at low and high levels of resource requirement
Extension of some project scheduling heuristics and their comparison at low and high levels of resource requirement
Some of the most frequently used scheduling heuristics for resource constrained projects are Activity Time (ACTIM), Activity Resource (ACTRES) and Resource Over Time (ROT) which ar...
Leveraging Design Heuristics for Multi-Objective Metamaterial Design Optimization
Leveraging Design Heuristics for Multi-Objective Metamaterial Design Optimization
Abstract Design optimization of metamaterials and other complex systems often relies on the use of computationally expensive models. This makes it challenging to use...
Optimal irrigation scheduling combining water content sensors and remote sensing data
Optimal irrigation scheduling combining water content sensors and remote sensing data
By 2025, the Food and Agriculture Organization of the United Nations predicts that two-thirds of the world population will experience water stress conditions. In addition, it is ex...
Visual versus Tabular Scheduling Programs
Visual versus Tabular Scheduling Programs
Effective scheduling in construction is crucial for ensuring timely project completion and maintaining budget control. Scheduling programs play an important role in this process by...
Heuristics for Efficient Resource Allocation in Cloud Computing
Heuristics for Efficient Resource Allocation in Cloud Computing
The resource allocation in cloud computing determines the allocation of computer and network resources of service providers to service requests of users for meeting user service re...
A Seminar Title On the History and Evolution of Agricultural Extension in the Ethiopia Country
A Seminar Title On the History and Evolution of Agricultural Extension in the Ethiopia Country
Agricultural extension service began work in Ethiopia since 1931, during the establishment of Ambo Agricultural School. But a formal Agricultural extension started since Alemaya Im...
A study on Multi-objective Flexible Job-shop Dynamic Scheduling Based on Control Window
A study on Multi-objective Flexible Job-shop Dynamic Scheduling Based on Control Window
Abstract It is of great practical significance to study the dynamic scheduling of production in flexible job-shop. In the flexible job-shop scheduling, process, cost...

Back to Top