Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Field Specific KPI - An Innovative Approach to Drilling Performance Management

View through CrossRef
Abstract The importance of improving the efficiency of drilling operations in the E&P industry cannot be overemphasized, since it directly impacts the overall cost of constructing oil and gas wells. The key performance indicator (KPI) for measuring drilling efficiency is feet per day (ft/d). In Saudi Aramco, a high level target KPI is normally generated separately for new development oil wells and gas wells, using a benchmark (BM) method based on actual and projected performance. The drilling teams found it difficult to relate individual well performance to the high level KPI target and were unable to properly strategize to improve performance. A new method, the field specific KPI, was developed to complement the BM method and provide a more user-friendly platform to manage performance. Notable impacts of the new method include; improved planning, accurate monitoring of performance for prompt corrective action; and enhanced accountability and variance analysis from individual wells to fields, departments and the high level. These were demonstrated to be the prime drivers to improve performance. This paper presents the process of generating the drilling performance efficiency KPIs using the existing BM method and the new field specific method. The scope, strengths, benefits and weaknesses of both methods are also addressed.
Title: Field Specific KPI - An Innovative Approach to Drilling Performance Management
Description:
Abstract The importance of improving the efficiency of drilling operations in the E&P industry cannot be overemphasized, since it directly impacts the overall cost of constructing oil and gas wells.
The key performance indicator (KPI) for measuring drilling efficiency is feet per day (ft/d).
In Saudi Aramco, a high level target KPI is normally generated separately for new development oil wells and gas wells, using a benchmark (BM) method based on actual and projected performance.
The drilling teams found it difficult to relate individual well performance to the high level KPI target and were unable to properly strategize to improve performance.
A new method, the field specific KPI, was developed to complement the BM method and provide a more user-friendly platform to manage performance.
Notable impacts of the new method include; improved planning, accurate monitoring of performance for prompt corrective action; and enhanced accountability and variance analysis from individual wells to fields, departments and the high level.
These were demonstrated to be the prime drivers to improve performance.
This paper presents the process of generating the drilling performance efficiency KPIs using the existing BM method and the new field specific method.
The scope, strengths, benefits and weaknesses of both methods are also addressed.

Related Results

Planning Drilling Fluid Programs in Southeast Asia
Planning Drilling Fluid Programs in Southeast Asia
Planning the drilling fluids program is one of the most important steps in Planning the drilling fluids program is one of the most important steps in preparation for the drilling o...
Pit Less Drilling Significantly Reduces Wells Environmental Footprint
Pit Less Drilling Significantly Reduces Wells Environmental Footprint
Abstract Pit less Drilling technology is a technology that eliminates the requirement for earthen pits or sumps to capture waste fluid. In this paper we will examine...
Application of Innovative High Temperature Deep Pyrolysis Technology to Treat Drilling Cuttings Harmlessly in Tarim Basim
Application of Innovative High Temperature Deep Pyrolysis Technology to Treat Drilling Cuttings Harmlessly in Tarim Basim
Abstract Due to high temperature, high pressure, and gypsum-salt formations in the Tian Mountain Front Block in Tarim Basin, the stability and rheology of traditiona...
Application of Multiphase Flow Methods to Horizontal Underbalanced Drilling
Application of Multiphase Flow Methods to Horizontal Underbalanced Drilling
Abstract Multiphase flow can be present in all aspects of underbalanced drilling. This paper outlines the ways in which multiphase flow pressure loss calculations...
Pengukuran Kinerja Sumber Daya Manusia menggunakan Metode Human Resources Scorecard
Pengukuran Kinerja Sumber Daya Manusia menggunakan Metode Human Resources Scorecard
Abstract. Human Resource Scorecard is a Human Resources performance measurement system that links people, strategy and company performance to form a competitive and superior compan...
New Engineering Approach to Avoid Twist Off Using High Frequency Drilling Dynamic Data
New Engineering Approach to Avoid Twist Off Using High Frequency Drilling Dynamic Data
Abstract Most recently, the oil industry has focused on drilling dynamics management as a critical process to maximize drilling system energy for an optimum rate of ...
Horizontal Re-entry Drilling With Coiled Tubing: A Viable Technology
Horizontal Re-entry Drilling With Coiled Tubing: A Viable Technology
Abstract Horizontal drilling technology has been the fastest growing segment of the oil and gas industry over the last few years. With the diversity of reservoirs...

Back to Top