Javascript must be enabled to continue!
Fusion power
View through CrossRef
Fusion, which powers the sun and stars, is potentially an environmentally responsible and intrinsically safe source of essentially limitless energy on earth. The potential of fusion has been recognized for over 65 years, but mastering fusion on earth has proved to be an enormous scientific and technical challenge. It involves heating a large volume of dilute gas, containing equal parts of deuterium and tritium, to over 100M°C (M°C=one million degrees celsius) while preventing it from being cooled by touching the walls, from which it must be isolated using a ‘magnetic bottle’. This has now been done, and the Joint European Torus (JET) – which is the world's leading fusion research facility – has produced 16 MW of fusion power. The next step, which is to build a power station sized device called ITER, will be taken by a global collaboration. ITER will be twice as big as JET in linear dimensions, and will integrate all the technologies needed in a fusion power station. ITER should produce at least 500 MW of fusion power, ten times more than needed to heat the gas, and confirm that it is possible to build a fusion power station. Time is, however, needed to further develop the technology in order to ensure that it would be reliable and economical, and to test in power station conditions the materials that will be used in its construction, which will have to stand up to intense bombardment by the neutrons that carry the energy out of the magnetic bottle. Up to now, fusion has not been developed with any sense of urgency: since devices called tokamaks emerged in 1969 as the best candidates for bottling hot gases, at least 15 years have been lost due to delays in decision making and inadequate funding. In view of the urgent need for new, large-scale, emission-free sources of energy, and given the fact that – assuming it can be made to work reliably – the economics of fusion power look reasonable, the time has come to develop fusion on the so-called Fast Track. This involves: building ITER and the essential International Fusion Materials Irradiation Facility in parallel, which will take ten years; using the results to finalize the design of a prototype fusion power station (generally called DEMO for Demonstrator); and then constructing DEMO, which will take another ten years. Assuming adequate funding, and that there are no major surprises, DEMO could be putting electricity into the grid within 30 years.
Title: Fusion power
Description:
Fusion, which powers the sun and stars, is potentially an environmentally responsible and intrinsically safe source of essentially limitless energy on earth.
The potential of fusion has been recognized for over 65 years, but mastering fusion on earth has proved to be an enormous scientific and technical challenge.
It involves heating a large volume of dilute gas, containing equal parts of deuterium and tritium, to over 100M°C (M°C=one million degrees celsius) while preventing it from being cooled by touching the walls, from which it must be isolated using a ‘magnetic bottle’.
This has now been done, and the Joint European Torus (JET) – which is the world's leading fusion research facility – has produced 16 MW of fusion power.
The next step, which is to build a power station sized device called ITER, will be taken by a global collaboration.
ITER will be twice as big as JET in linear dimensions, and will integrate all the technologies needed in a fusion power station.
ITER should produce at least 500 MW of fusion power, ten times more than needed to heat the gas, and confirm that it is possible to build a fusion power station.
Time is, however, needed to further develop the technology in order to ensure that it would be reliable and economical, and to test in power station conditions the materials that will be used in its construction, which will have to stand up to intense bombardment by the neutrons that carry the energy out of the magnetic bottle.
Up to now, fusion has not been developed with any sense of urgency: since devices called tokamaks emerged in 1969 as the best candidates for bottling hot gases, at least 15 years have been lost due to delays in decision making and inadequate funding.
In view of the urgent need for new, large-scale, emission-free sources of energy, and given the fact that – assuming it can be made to work reliably – the economics of fusion power look reasonable, the time has come to develop fusion on the so-called Fast Track.
This involves: building ITER and the essential International Fusion Materials Irradiation Facility in parallel, which will take ten years; using the results to finalize the design of a prototype fusion power station (generally called DEMO for Demonstrator); and then constructing DEMO, which will take another ten years.
Assuming adequate funding, and that there are no major surprises, DEMO could be putting electricity into the grid within 30 years.
Related Results
The Nuclear Fusion Award
The Nuclear Fusion Award
The Nuclear Fusion Award ceremony for 2009 and 2010 award winners was held during the 23rd IAEA Fusion Energy Conference in Daejeon. This time, both 2009 and 2010 award winners w...
Determinants of lateral fusion in single-level oblique lateral lumbar interbody fusion: a retrospective analysis of fusion patterns and clinical outcomes
Determinants of lateral fusion in single-level oblique lateral lumbar interbody fusion: a retrospective analysis of fusion patterns and clinical outcomes
Study Design: Retrospective cohort study.Purpose: This study aimed to (1) determine the incidence of lateral fusion following single-level oblique lateral interbody fusion (OLIF); ...
Fusión de Datos: Imputación y Validación
Fusión de Datos: Imputación y Validación
Las actitudes, el conocimiento y las acciones generalmente se basan en muestras. Algunos basan sus conclusiones en muestras pequeñas y pocas veces toman en cuenta la magnitud de lo...
Nonproliferation and fusion power plants
Nonproliferation and fusion power plants
Abstract
The world now appears to be on the brink of realizing commercial fusion. As fusion energy progresses towards near-term commercial deployment, the question arises a...
Validation of D–T fusion power prediction capability against 2021 JET D–T experiments
Validation of D–T fusion power prediction capability against 2021 JET D–T experiments
AbstractJET experiments using the fuel mixture envisaged for fusion power plants, deuterium and tritium (D–T), provide a unique opportunity to validate existing D–T fusion power pr...
The Diverse Landscape of Fusion Transcripts in 25 Different Hematological Entities
The Diverse Landscape of Fusion Transcripts in 25 Different Hematological Entities
Background: Genomic alterations are a hallmark of hematological malignancies and comprise small nucleotide variants, copy number alterations and structural variants (SV). SV lead t...
RNA Sequencing Based Whole Transcriptome Analysis Detected Precisely All Fusion Transcripts in Leukemias
RNA Sequencing Based Whole Transcriptome Analysis Detected Precisely All Fusion Transcripts in Leukemias
Abstract
Introduction: Fusion transcript is a chimeric RNA encoded by a fusion gene or by two different genes by subsequent trans-splicing. Detection of fusion trans...
Fusion rate: a time-to-event phenomenon
Fusion rate: a time-to-event phenomenon
Object.The term “fusion rate” is generally denoted in the literature as the percentage of patients with successful fusion over a specific range of follow up. Because the time to fu...

