Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Incorporation of Fukushima Lessons Learned Into Small Modular Light Water Reactor Functional Requirements

View through CrossRef
This paper describes the EPRI (Electric Power Research Institute) project to enable the incorporation of Fukushima Lessons Learned into new Advanced Light Water Reactor (ALWR) nuclear plant designs and projects. This includes large scale plants and Small Modular Reactors (SMR). EPRI, working with the bulk of the US nuclear industry, compiled the Utility Requirements Document (URD) for new passive and evolutionary ALWRs. The ∼3,400 pages of functional design and project requirements in the URD became one of the bases documents for the current AP1000, ESBWR and EPR designs. The URD was and is a declaration of requirements of Owners/Operators for any new nuclear plant they might purchase. The 2013 revision 12 of the URD incorporated specific design and project requirements that are directly linked to industry summary conclusions and recommendations concerning the Fukushima event. During 2013 and 2014, EPRI, with assistance from the Department of Energy (DOE), is developing the URD requirements for selected SMRs.
American Society of Mechanical Engineers
Title: Incorporation of Fukushima Lessons Learned Into Small Modular Light Water Reactor Functional Requirements
Description:
This paper describes the EPRI (Electric Power Research Institute) project to enable the incorporation of Fukushima Lessons Learned into new Advanced Light Water Reactor (ALWR) nuclear plant designs and projects.
This includes large scale plants and Small Modular Reactors (SMR).
EPRI, working with the bulk of the US nuclear industry, compiled the Utility Requirements Document (URD) for new passive and evolutionary ALWRs.
The ∼3,400 pages of functional design and project requirements in the URD became one of the bases documents for the current AP1000, ESBWR and EPR designs.
The URD was and is a declaration of requirements of Owners/Operators for any new nuclear plant they might purchase.
The 2013 revision 12 of the URD incorporated specific design and project requirements that are directly linked to industry summary conclusions and recommendations concerning the Fukushima event.
During 2013 and 2014, EPRI, with assistance from the Department of Energy (DOE), is developing the URD requirements for selected SMRs.

Related Results

ANALISIS PENGATURAN POSISI CONTROL RODS PADA KONSEP REAKTOR DAYA EKSPERIMENTAL INDONESIA PASCA REACTOR SCRAM
ANALISIS PENGATURAN POSISI CONTROL RODS PADA KONSEP REAKTOR DAYA EKSPERIMENTAL INDONESIA PASCA REACTOR SCRAM
ANALISISPENGATURAN POSISI CONTROL RODS PADA KONSEP REAKTOR DAYA EKSPERIMENTAL INDONESIA PASCA REACTOR SCRAM POST REACTOR SCRAM CONTROL RODS POSITION ADJUSTMENT ANALYSIS FOR THE IN...
INVESTIGASI KARAKTERISTIK TERMOHIDROLIKA TERAS REAKTOR DAYA KECIL DENGAN PENDINGINAN SIRKULASI ALAM MENGGUNAKAN RELAP5
INVESTIGASI KARAKTERISTIK TERMOHIDROLIKA TERAS REAKTOR DAYA KECIL DENGAN PENDINGINAN SIRKULASI ALAM MENGGUNAKAN RELAP5
ABSTRAK INVESTIGASI KARAKTERISTIK TERMOHIDROLIKA TERAS REAKTOR DAYA KECIL DENGAN PENDINGINAN SIRKULASI ALAM MENGGUNAKAN RELAP5. Reaktor modular daya-kecil (small modular reactor, S...
Safety Assurance for Boiling Water Reactors (BWRs) Beyond Design Basis
Safety Assurance for Boiling Water Reactors (BWRs) Beyond Design Basis
Safety assurance of nuclear power plants cannot be achieved with highly inaccurate design bases coupled with extended operation beyond them as was the case at Fukushima Daiichi Uni...
Book 2. POWER CONTROL FOR AN ELECTRICALLY POWERED WATER TREATMENT APPARATUS
Book 2. POWER CONTROL FOR AN ELECTRICALLY POWERED WATER TREATMENT APPARATUS
Detailed Description of How the Power Control of the Present Invention Synchronizes the Power Supply to a W2W Electrochemical Reactor The overall, general fundamental "patentable" ...
High Temperature Intrinsically Safe Nuclear Reactor
High Temperature Intrinsically Safe Nuclear Reactor
Small Modular Reactor (SMR) technologies have been recently included by the DOE as clean energy, a low carbondioxide emitting “alternative energy” source. The objective of this pap...
Integrated hydrological modelling for sustainable water allocation planning : Mkomazi Basin, South Africa case study
Integrated hydrological modelling for sustainable water allocation planning : Mkomazi Basin, South Africa case study
Allocation of freshwater resources between societal needs and natural ecological systems is of great concern for water managers. This development has challenged decision-makers reg...

Back to Top