Javascript must be enabled to continue!
Analisis Dampak Lalulintas Exit Tol Jatikarya Terhadap Jalan Transyogi Cibubur Jawa Barat (Tol Cimanggis-Cibitung)
View through CrossRef
Transyogi Road is the main road used by transportation originating from the Depok city, Bogor district, Bekasi city and Bekasi district. The Transyogi Road and the networks connected to it have experienced a significant increase in traffic density each year, this fact is based on the indicator level of the VC ratio on the Transyogi and surrounding road segments which have reached 0.8 at busy times. With the increase in trips generated from Bekasi Regency and an increase in residential density in Depok and Bogor, it has the potential to increase generation and the traffic attraction from and to the area is affecting by the construction of the Cimanggis - Cibitung toll road. This Traffic Impact Analysis aims to predict the impact of the construction of the Cimanggis - Cibitung Toll Road on the Jatikarya exit, and determine the form of improvement needed, harmonize the decisions regarding land use with traffic conditions, the number and location of access, and alternative improvements . This study method uses 4 (four) transportation modeling, analysis of road capacity, vehicle speed .. From the results of this study, it was concluded that before the toll road the Transyogi road had a performance with a V / C ratio of 0.8 and an average speed of 20 km / hour (if do nothing), while after the exit of the jatikarya toll was operated the V / C ratio was 0.7 and the average speed is 23 km / h (do nothing). While the performance of Transyogi road in the design year 2025 without performing geometric improvements (do nothing) has a road performance with a V / C ratio of 0.98 and an average speed of 12-13 km / hr. While if performance changes are made with capacity building traffic management arrangements, predictive traffic conditions in 2025 traffic performance will be obtained with a v / c ratio of an average of 0.7 with an average speed of 26 km / hour (do something).
Title: Analisis Dampak Lalulintas Exit Tol Jatikarya Terhadap Jalan Transyogi Cibubur Jawa Barat (Tol Cimanggis-Cibitung)
Description:
Transyogi Road is the main road used by transportation originating from the Depok city, Bogor district, Bekasi city and Bekasi district.
The Transyogi Road and the networks connected to it have experienced a significant increase in traffic density each year, this fact is based on the indicator level of the VC ratio on the Transyogi and surrounding road segments which have reached 0.
8 at busy times.
With the increase in trips generated from Bekasi Regency and an increase in residential density in Depok and Bogor, it has the potential to increase generation and the traffic attraction from and to the area is affecting by the construction of the Cimanggis - Cibitung toll road.
This Traffic Impact Analysis aims to predict the impact of the construction of the Cimanggis - Cibitung Toll Road on the Jatikarya exit, and determine the form of improvement needed, harmonize the decisions regarding land use with traffic conditions, the number and location of access, and alternative improvements .
This study method uses 4 (four) transportation modeling, analysis of road capacity, vehicle speed .
From the results of this study, it was concluded that before the toll road the Transyogi road had a performance with a V / C ratio of 0.
8 and an average speed of 20 km / hour (if do nothing), while after the exit of the jatikarya toll was operated the V / C ratio was 0.
7 and the average speed is 23 km / h (do nothing).
While the performance of Transyogi road in the design year 2025 without performing geometric improvements (do nothing) has a road performance with a V / C ratio of 0.
98 and an average speed of 12-13 km / hr.
While if performance changes are made with capacity building traffic management arrangements, predictive traffic conditions in 2025 traffic performance will be obtained with a v / c ratio of an average of 0.
7 with an average speed of 26 km / hour (do something).
Related Results
Persepsi Pengguna Jalan Tol Terhadap Penyesuaian Tarif Tol Secara Berkala Untuk Mendorong Investasi Jalan Tol
Persepsi Pengguna Jalan Tol Terhadap Penyesuaian Tarif Tol Secara Berkala Untuk Mendorong Investasi Jalan Tol
Besaran tarif tol ideal adalah tarif yang memperhatikan kelayakan investasi yakni pengembalian investasi dan keuntungan yang wajar bagi investor dan juga memperhatikan kemampuan - ...
Pengaruh Geometrik dan Lingkungan Jalan Pada Kecelakaan Lalulintas di Jalan perkotaan
Pengaruh Geometrik dan Lingkungan Jalan Pada Kecelakaan Lalulintas di Jalan perkotaan
Jalan perkotaan merupakan prasarana yang sangat penting dalam menunjang aktivitas sosial dan ekonomi penduduk perkotaan. Karena itu perlu diciptakan suatu sistem transportasi jalan...
TINJAUAN METODE PEMBAYARAN KARTU TOL ELEKTRONIK (LOKASI DI GERBANG TOL BANYUMANIK, JALAN TOL SEMARANG-SOLO)
TINJAUAN METODE PEMBAYARAN KARTU TOL ELEKTRONIK (LOKASI DI GERBANG TOL BANYUMANIK, JALAN TOL SEMARANG-SOLO)
Jalan tol saat ini memiliki peran yang penting dalam mengefisienkan waktu tempuh perjalanan kendaraan roda 4 (empat) atau lebih dari satu tempat ke tempat yang lain. Sistem pembaya...
TRANSYOGI CIBUBUR PEDESTRIAN PATH: CONNECTING CITY AND NATURE
TRANSYOGI CIBUBUR PEDESTRIAN PATH: CONNECTING CITY AND NATURE
Metropolitan cities like Cibubur are increasingly facing complex mobility challenges. In this context, it is important to consider pedestrian routes as an important element in a su...
Abstract 1071: Efficacy of targeted osmotic lysis using pulsed electric field stimulation compared to paclitaxel for treating murine, triple-negative breast carcinoma
Abstract 1071: Efficacy of targeted osmotic lysis using pulsed electric field stimulation compared to paclitaxel for treating murine, triple-negative breast carcinoma
Abstract
Targeted osmotic lysis (TOL), the concurrent stimulation of voltage-gated sodium channels (VGSCs) and blockade of Na+ pumps, kills up to 100% of highly mali...
ANALISIS KINERJA RUAS JALAN DI WILAYAH PUSAT KOTA STUDI KASUS ( RUAS JALANANDI DJEMMA EX. JALAN JENDERAL SUDIRMAN KOTA PALOPO
ANALISIS KINERJA RUAS JALAN DI WILAYAH PUSAT KOTA STUDI KASUS ( RUAS JALANANDI DJEMMA EX. JALAN JENDERAL SUDIRMAN KOTA PALOPO
Dalam menentukan kinerja lalulintas pada ruas jalan Andi Djemma ex. Jalan Jenderal Sudirman Kota Palopo dapat digunakan beberapa populasi variabel utama, yaitu volume, kecepatan, k...
Implementation and analysis of an adaptive multilevel Monte Carlo algorithm
Implementation and analysis of an adaptive multilevel Monte Carlo algorithm
Abstract.
We present an adaptive multilevel Monte Carlo (MLMC) method for
weak approximations of solutions to Itô stochastic
differential equations (SDE). The work [...
IDENTIFIKASI KARAKTERISTIK 4 SEGMEN KORIDOR JALAN UTAMA KOTA TANGERANG SELATAN (JL. PAHLAWAN SERIBU, JL. KAPTEN SOEBIANTO DJOJOHADIKUSUMO, JL. RAYA RAWABUNTU, DAN JL. BUARAN)
IDENTIFIKASI KARAKTERISTIK 4 SEGMEN KORIDOR JALAN UTAMA KOTA TANGERANG SELATAN (JL. PAHLAWAN SERIBU, JL. KAPTEN SOEBIANTO DJOJOHADIKUSUMO, JL. RAYA RAWABUNTU, DAN JL. BUARAN)
A good road corridor is one that pays attention to functionality, quality, and aesthetics, all optimized to meet road corridor planning standards. The profile of physical condition...

