Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Flexible Flow Shop Scheduling Method with Public Buffer

View through CrossRef
Actual manufacturing enterprises usually solve the production blockage problem by increasing the public buffer. However, the increase of the public buffer makes the flexible flow shop scheduling rather challenging. In order to solve the flexible flow shop scheduling problem with public buffer (FFSP–PB), this study proposes a novel method combining the simulated annealing algorithm-based Hopfield neural network algorithm (SAA–HNN) and local scheduling rules. The SAA–HNN algorithm is used as the global optimization method, and constructs the energy function of FFSP–PB to apply its asymptotically stable characteristic. Due to the limitations, such as small search range and high probability of falling into local extremum, this algorithm introduces the simulated annealing algorithm idea such that the algorithm is able to accept poor fitness solution and further expand its search scope during asymptotic convergence. In the process of local scheduling, considering the transferring time of workpieces moving into and out of public buffer and the manufacturing state of workpieces in the production process, this study designed serval local scheduling rules to control the moving process of the workpieces between the public buffer and the limited buffer between the stages. These local scheduling rules can also be used to reduce the production blockage and improve the efficiency of the workpiece transfer. Evaluated by the groups of simulation schemes with the actual production data of one bus manufacturing enterprise, the proposed method outperforms other methods in terms of searching efficiency and optimization target.
Title: Flexible Flow Shop Scheduling Method with Public Buffer
Description:
Actual manufacturing enterprises usually solve the production blockage problem by increasing the public buffer.
However, the increase of the public buffer makes the flexible flow shop scheduling rather challenging.
In order to solve the flexible flow shop scheduling problem with public buffer (FFSP–PB), this study proposes a novel method combining the simulated annealing algorithm-based Hopfield neural network algorithm (SAA–HNN) and local scheduling rules.
The SAA–HNN algorithm is used as the global optimization method, and constructs the energy function of FFSP–PB to apply its asymptotically stable characteristic.
Due to the limitations, such as small search range and high probability of falling into local extremum, this algorithm introduces the simulated annealing algorithm idea such that the algorithm is able to accept poor fitness solution and further expand its search scope during asymptotic convergence.
In the process of local scheduling, considering the transferring time of workpieces moving into and out of public buffer and the manufacturing state of workpieces in the production process, this study designed serval local scheduling rules to control the moving process of the workpieces between the public buffer and the limited buffer between the stages.
These local scheduling rules can also be used to reduce the production blockage and improve the efficiency of the workpiece transfer.
Evaluated by the groups of simulation schemes with the actual production data of one bus manufacturing enterprise, the proposed method outperforms other methods in terms of searching efficiency and optimization target.

Related Results

Menelisik Pajak Penghasilan Atas Bisnis Online Shop
Menelisik Pajak Penghasilan Atas Bisnis Online Shop
<p>This research is motivated by the large number of online shops these days which make question about the entrepreneur of online shop’s obedience onto their tax obligation. ...
Visual versus Tabular Scheduling Programs
Visual versus Tabular Scheduling Programs
Effective scheduling in construction is crucial for ensuring timely project completion and maintaining budget control. Scheduling programs play an important role in this process by...
Real time scheduling system (RTSS)
Real time scheduling system (RTSS)
Traditional research in Job Shop Scheduling (JSS) is largely based on combinatorial analysis. Unfortunately, the NP-complete nature of the problem forces many assumptions into exis...
Pressure Analysis of DST Flow Period Or Slug Flow For Horizontal Wells In Homogeneous Reservoir
Pressure Analysis of DST Flow Period Or Slug Flow For Horizontal Wells In Homogeneous Reservoir
Abstract By the transient pressure for horizontal well with constant flow rate and Duhamel's principle, this paper presents the method to calculate the transient ...
Procedure for Western blot v1
Procedure for Western blot v1
Goal: This document has the objective of standardizing the protocol for Western blot. This technique allows the detection of specific proteins separated on polyacrylamide gel and t...
Multiphase Flow Metering:An Evaluation of Discharge Coefficients
Multiphase Flow Metering:An Evaluation of Discharge Coefficients
Abstract The orifice discharge coefficient (CD) is the constant required to correct theoretical flow rate to actual flow rate. It is known that single phase orifi...
Analysis of Workshop Production Scheduling Considering Risk Factors
Analysis of Workshop Production Scheduling Considering Risk Factors
In the process of workshop production scheduling, many risk factors can affect the reliability of production. The factors influencing the production scheduling include time, qualit...

Back to Top