The Kediri Airport development project encountered challenges related to underground ducting work. The design of Kediri Airport adheres to international standards, which led to the use of materials not readily available in Indonesia, specifically pipes and duct spacers. Duct spacers are tools used to arrange ducting pipes according to their formation and prevent them from floating during concrete pouring due to buoyancy. The SKEP/114/VI/2002 serves as a reference for underground cable installation, involving direct burial of cables at a depth of 70 cm, covered with a 5 cm layer of sand above the cable surface. These two approaches significantly differ, necessitating problem-solving solutions. To address this issue, research was conducted to find suitable duct spacers in Indonesia. Two alternative materials were considered: PVC and lightweight hollow steel. The study compared costs and time associated with these materials. PVC duct spacers would be imported and be fabricated in Indonesia, while hollow steel duct spacers would be fabricated on-site. The research focused on three aspects: ducting work methods, duct spacer design, and cost-time analysis. Given tight installation spaces and busy schedules, duct spacers needed to be compact, simple, and adaptable to various pipe formations. The design for hollow steel duct spacers aimed for simplicity to reduce on-site construction work. However, care was taken to avoid potential injuries from exposed bolts on the hollow steel frame. The PVC duct spacer design utilized Polytam PF 1000 material, with a nominal shear strength of 399 kg and a nominal moment of 266 kg·cm—sufficient to withstand saturated soil loads up to 162 cm but not vehicular loads. Analyzing procurement time, PVC duct spacers from Indonesian manufacturers were the quickest, taking only 56 days due to no port clearance delays. The fastest completion time for the project was achieved using PVC duct spacers, taking 122 seconds—three times faster than hollow steel duct spacers. While lightweight steel was the most cost-effective option for on-site procurement, combining cost and time analysis favored PVC duct spacers. The minimal cost difference allowed for accelerated production, minimizing the risk of delays
Asosiasi Riset Ilmu Manajemen dan Bisnis Indonesia
Title: Analisis Perbandingan Biaya dan Waktu pada Penggunaan Duct Spacer dengan Prefabricated dan Hollow Baja Ringan Untuk Pekerjaan Underground Ducting
Description:
The Kediri Airport development project encountered challenges related to underground ducting work.
The design of Kediri Airport adheres to international standards, which led to the use of materials not readily available in Indonesia, specifically pipes and duct spacers.
Duct spacers are tools used to arrange ducting pipes according to their formation and prevent them from floating during concrete pouring due to buoyancy.
The SKEP/114/VI/2002 serves as a reference for underground cable installation, involving direct burial of cables at a depth of 70 cm, covered with a 5 cm layer of sand above the cable surface.
These two approaches significantly differ, necessitating problem-solving solutions.
To address this issue, research was conducted to find suitable duct spacers in Indonesia.
Two alternative materials were considered: PVC and lightweight hollow steel.
The study compared costs and time associated with these materials.
PVC duct spacers would be imported and be fabricated in Indonesia, while hollow steel duct spacers would be fabricated on-site.
The research focused on three aspects: ducting work methods, duct spacer design, and cost-time analysis.
Given tight installation spaces and busy schedules, duct spacers needed to be compact, simple, and adaptable to various pipe formations.
The design for hollow steel duct spacers aimed for simplicity to reduce on-site construction work.
However, care was taken to avoid potential injuries from exposed bolts on the hollow steel frame.
The PVC duct spacer design utilized Polytam PF 1000 material, with a nominal shear strength of 399 kg and a nominal moment of 266 kg·cm—sufficient to withstand saturated soil loads up to 162 cm but not vehicular loads.
Analyzing procurement time, PVC duct spacers from Indonesian manufacturers were the quickest, taking only 56 days due to no port clearance delays.
The fastest completion time for the project was achieved using PVC duct spacers, taking 122 seconds—three times faster than hollow steel duct spacers.
While lightweight steel was the most cost-effective option for on-site procurement, combining cost and time analysis favored PVC duct spacers.
The minimal cost difference allowed for accelerated production, minimizing the risk of delays
.
Related Results
Blunt Chest Trauma and Chylothorax: A Systematic Review
Blunt Chest Trauma and Chylothorax: A Systematic Review
Abstract
Introduction: Although traumatic chylothorax is predominantly associated with penetrating injuries, instances following blunt trauma, as a rare and challenging condition, ...
Analisa Perbandingan Biaya Pada Kuda Kuda Baja Ringan Dengan Kuda-Kuda Kayu (Gedung Dengan Desain Atap Pelana Dan Luas Atap 554 M2)
Analisa Perbandingan Biaya Pada Kuda Kuda Baja Ringan Dengan Kuda-Kuda Kayu (Gedung Dengan Desain Atap Pelana Dan Luas Atap 554 M2)
Atap adalah salah satu bagian yang penting pada suatu bangunan. Salah satu bagian dari konstruksi atap adalah kuda-kuda. Material kuda-kuda yang paling sering dijumpai di kalangan ...
Analisa Biaya Dan Waktu Pelaksanaan Kuda-Kuda Baja Ringan Dengan Kuda-Kuda Kayu Pembangunan Puskesmas Pintu Padang
Analisa Biaya Dan Waktu Pelaksanaan Kuda-Kuda Baja Ringan Dengan Kuda-Kuda Kayu Pembangunan Puskesmas Pintu Padang
: Material kuda-kuda yang paling sering dijumpai di kalangan masyarakat adalah kayu. Seiring dengan berkembangnya teknologi di bidang teknik sipil dan pesatnya pertumbuhan hunian y...
Presentation and Management of Cervical Thoracic Duct Cyst: A Systematic Review of the Literature
Presentation and Management of Cervical Thoracic Duct Cyst: A Systematic Review of the Literature
Abstract
Introduction
Thoracic duct cysts are an uncommon phenomenon, especially within the cervical region. Due to its limited reported cases, very little is known about its etiol...
EVALUASI KINERJA WAKTU DAN BIAYA PADA PROYEK GEDUNG X MENGGUNAKAN METODE EARNED VALUE ANALYSIS - MRK
EVALUASI KINERJA WAKTU DAN BIAYA PADA PROYEK GEDUNG X MENGGUNAKAN METODE EARNED VALUE ANALYSIS - MRK
Pembangunan Proyek Gedung X dijadwalkan selesai dalam waktu 16 bulan atau 70 minggu. Namun proyek ini mengalami penambahan waktu pelaksanaan menjadi 27 bulan atau 118 minggu dengan...
Analisis Perbandingan Biaya Dan Waktu Pelaksanaan Kusen Aluminium Dengan Kusen Kayu Pada Gedung Kantor Kejaksaan Kab. Padang Lawas Utara
Analisis Perbandingan Biaya Dan Waktu Pelaksanaan Kusen Aluminium Dengan Kusen Kayu Pada Gedung Kantor Kejaksaan Kab. Padang Lawas Utara
Pekerjaan konstruksi memiliki berbagai macam metode dan bahan dasar yang berbeda-beda. Salah satu contohnya pada pekerjaan pemasangan kusen, umumnya yang dipakai adalah kusen berba...
DAMPAK TEKNOLOGI TERHADAP PROSES BELAJAR MENGAJAR
DAMPAK TEKNOLOGI TERHADAP PROSES BELAJAR MENGAJAR
DAFTAR PUSTAKAAditama, M. H. R., & Selfiardy, S. (2022). Kehidupan Mahasiswa Kuliah Sambil Bekerja di Masa Pandemi Covid-19. Kidspedia: Jurnal Pendidikan Anak Usia Dini, 3(...
Produktivitas Tenaga Kerja Pada Pekerjaan Rangka Atap Baja Ringan Daerah Surabaya
Produktivitas Tenaga Kerja Pada Pekerjaan Rangka Atap Baja Ringan Daerah Surabaya
Baja ringan merupakan logam campuran jenis baja yang di dalamnya terdapat beberapa unsur metal, bahan ini setelah dingin dibentuk dengan melakukan proses ulang komposisi atom dan m...