Enhancing Zonal Isolation With Expandable Cement System for Gas Field
View through CrossRef
Abstract
HPHT well subjects zonal isolation and long term cement integrity into critical factor to achieve long term production life. Repeated cycles of high differential pressure and temperature tend to break bonding between cement, casing and formation. Microannulus as consequence of debonding will provide space. At gas wells, it will provide space for gas migration which may lead to sustained casing pressure. Providing zonal isolation is also important to ensure there will be no communication between two different formations or reservoirs
This paper discusses the design, execution and evaluation of cement technology implemented at 9 5/8-in HPHT intermediate liner. Special softwares were used to simulate gas migration risk and stress analysis to cement sheath. High risk gas migration and microannulus were expected based on sofware results. An expandable cement system was identified as a solution and deployed successfully. In order to achieve better understanding of behaviour of cement slurry at field application, laboratory experiments were performed. To achieve long term cement integrity, it is not only about design of cement slurry, mud removal is one of the key factor need to be considered. Best practices were perfomed to achieve the highest mud removal efficiency.
Expansion test was perfomed by using pressure curing chamber at 247°F. Expansion was detected for six days simulation which was considered as enough based on stress analysis simulation of compression, traction and microannulus cement sheath performed. It was indicated that expandable cement managed to eliminate microannulus which was created by pressure and temperature changes. Evaluation was performed by locating pressure sensor at the A annulus of 9 5/8-in liner and 13 3/8-in casing. The sensor indicated zero pressure at the annulus while drilling next two more section and during the production life of the well
Title: Enhancing Zonal Isolation With Expandable Cement System for Gas Field
Description:
Abstract
HPHT well subjects zonal isolation and long term cement integrity into critical factor to achieve long term production life.
Repeated cycles of high differential pressure and temperature tend to break bonding between cement, casing and formation.
Microannulus as consequence of debonding will provide space.
At gas wells, it will provide space for gas migration which may lead to sustained casing pressure.
Providing zonal isolation is also important to ensure there will be no communication between two different formations or reservoirs
This paper discusses the design, execution and evaluation of cement technology implemented at 9 5/8-in HPHT intermediate liner.
Special softwares were used to simulate gas migration risk and stress analysis to cement sheath.
High risk gas migration and microannulus were expected based on sofware results.
An expandable cement system was identified as a solution and deployed successfully.
In order to achieve better understanding of behaviour of cement slurry at field application, laboratory experiments were performed.
To achieve long term cement integrity, it is not only about design of cement slurry, mud removal is one of the key factor need to be considered.
Best practices were perfomed to achieve the highest mud removal efficiency.
Expansion test was perfomed by using pressure curing chamber at 247°F.
Expansion was detected for six days simulation which was considered as enough based on stress analysis simulation of compression, traction and microannulus cement sheath performed.
It was indicated that expandable cement managed to eliminate microannulus which was created by pressure and temperature changes.
Evaluation was performed by locating pressure sensor at the A annulus of 9 5/8-in liner and 13 3/8-in casing.
The sensor indicated zero pressure at the annulus while drilling next two more section and during the production life of the well.
Related Results
First Implementation of Self-Healing Cement Systems in H2S/CO2 Aggressive Environment Across Pay-Zone
First Implementation of Self-Healing Cement Systems in H2S/CO2 Aggressive Environment Across Pay-Zone
Abstract
Carbonate reservoirs are often characterized by high pressure and high content of H2S and CO2. For these reasons, drilling the reservoir is the most challen...
The cement-bone bond is weaker than cement-cement bond in cement-in-cement revision arthroplasty. A comparative biomechanical study
The cement-bone bond is weaker than cement-cement bond in cement-in-cement revision arthroplasty. A comparative biomechanical study
This study compares the strength of the native bone-cement bond and the old-new cement bond under cyclic loading, using third generation cementing technique, rasping and contaminat...
Karakteristik Madden-Julian Oscillation (MJO) Ketika El-Nino Southern Oscillation (ENSO)
Karakteristik Madden-Julian Oscillation (MJO) Ketika El-Nino Southern Oscillation (ENSO)
Perkembangan peristiwa El-Nino Southern Oscillation (ENSO) menunjukkan peran penting bagi Madden-Julian Oscillation (MJO). Variasi angin permukaan (UWND) dan konveksi (OLR) intramu...
First Implementation of Zonal Integrity Recovery Through a Regenerative Hydraulic Seal
First Implementation of Zonal Integrity Recovery Through a Regenerative Hydraulic Seal
Abstract
An effective zonal isolation is the primary objective of well cementing. However, achieving a hydraulic seal capable of withstanding stresses, and loads ...
Addressing Operational Complexities: Successful Zonal Isolation in Deep Production Liners Through Innovative Cementing
Addressing Operational Complexities: Successful Zonal Isolation in Deep Production Liners Through Innovative Cementing
Abstract
This paper explores the complexities involved in achieving zonal isolation within deep production liners with a narrow operational window (pore-fracture pre...
Real-Time Distributed Fiber Optic Sensing for Cement Sheath Integrity Monitoring
Real-Time Distributed Fiber Optic Sensing for Cement Sheath Integrity Monitoring
ABSTRACT:
The integrity of cement sheath is critical to oil and gas effective extraction, in which the cement displacement efficiency and solidify quality are the...
Foamed Cement Solution for Deepwater Tophole Challenges Offshore West Africa
Foamed Cement Solution for Deepwater Tophole Challenges Offshore West Africa
Abstract
One of the biggest challenges with cementing surface casings offshore in a deepwater environment is the requirement to place a cement column in unconsolidat...
Cement Evaluation - A Risky Business
Cement Evaluation - A Risky Business
Abstract
Cement evaluation is commonly thought of as running a cement bond log (CBL) and attempting to interpret the results to determine if there is isolation in th...