Heavy Lift Dynamics, Sewol Ferry Offshore Salvage
View through CrossRef
Abstract
The Sewol Ferry sank off Korea in 2014 with the loss of 304 lives. The remains of 9 victims remain within wreck and cannot be reached by divers. This paper describes some of the heavy lift engineering involved in the salvage of the 146-meter long ferry, in one piece, from a depth of 44 meters in the ocean, resting on its port side.
A method for calculating the interaction of the vessel stern with the seabed (ground reaction) is described as the bow of the 8,000-ton vessel is raised to place lifting beams to be used in the side lift.
Significant difficulties, associated with geotechnical issues, resulting in project delays are descried.
Calculation methods are presented for determining the large trapped water mass and the large frequency and depth dependent added mass of the submerged vessel (greater than 120,000 tons). Coupled dynamic time domain simulations of the initial bow lift, followed by the side lift onto a floating vessel are presented. A total of 34 HMPE synthetic slings are used to attach a 1,200-ton purpose-built lifting frame to the ZPMC 12,000-ton revolving crane.
Wave forecast data from three sources are compared with continuously measured data from a directional wave buoy at the site. The difficulties in predicting and controlling the heel of the vessel with a combination of added buoyancy, slings and geotechnical forces are described for the failed attempt at the first bow lift and for the final bow lift. Dynamic sling tensions are shown calculated for the upper HMPE slings and the lower steel rope vertical and balance slings from the lifting frame to the lifting beams. Detailed static and quasi-dynamic FEA results are described for the Sewol hull, together with buckling checks.
Title: Heavy Lift Dynamics, Sewol Ferry Offshore Salvage
Description:
Abstract
The Sewol Ferry sank off Korea in 2014 with the loss of 304 lives.
The remains of 9 victims remain within wreck and cannot be reached by divers.
This paper describes some of the heavy lift engineering involved in the salvage of the 146-meter long ferry, in one piece, from a depth of 44 meters in the ocean, resting on its port side.
A method for calculating the interaction of the vessel stern with the seabed (ground reaction) is described as the bow of the 8,000-ton vessel is raised to place lifting beams to be used in the side lift.
Significant difficulties, associated with geotechnical issues, resulting in project delays are descried.
Calculation methods are presented for determining the large trapped water mass and the large frequency and depth dependent added mass of the submerged vessel (greater than 120,000 tons).
Coupled dynamic time domain simulations of the initial bow lift, followed by the side lift onto a floating vessel are presented.
A total of 34 HMPE synthetic slings are used to attach a 1,200-ton purpose-built lifting frame to the ZPMC 12,000-ton revolving crane.
Wave forecast data from three sources are compared with continuously measured data from a directional wave buoy at the site.
The difficulties in predicting and controlling the heel of the vessel with a combination of added buoyancy, slings and geotechnical forces are described for the failed attempt at the first bow lift and for the final bow lift.
Dynamic sling tensions are shown calculated for the upper HMPE slings and the lower steel rope vertical and balance slings from the lifting frame to the lifting beams.
Detailed static and quasi-dynamic FEA results are described for the Sewol hull, together with buckling checks.
Related Results
Fundamental study on rope vibration suppression by middle transfer floor using risk information
Fundamental study on rope vibration suppression by middle transfer floor using risk information
Lifts are essential for means of vertical transportation. Recently, the lifts installed in the high-rise buildings are long travel, thus the lift ropes are becoming longer. The nat...
Monitoring Offshore Lift Dynamics
Monitoring Offshore Lift Dynamics
ABSTRACT
This paper illustrates the significance of lift dynamic aspects observed during two major offshore heavy lift operations performed in 1991. Extensive off...
High Seas 0il Spill Control of the Supervisor of Salvage, USN
High Seas 0il Spill Control of the Supervisor of Salvage, USN
ABSTRACT
The Supervisor of Salvage, U.S. Navy, recognized since World War II as the Government's focal point for ship salvage matters, has taken on a new responsi...
Gas Lift - Past & Future
Gas Lift - Past & Future
Abstract
This paper will describe the evolution of gas lift systems over the past few decades, making parallels with other artificial lift technologies (ESP, SRP, an...
Pig Lift: A New Artificial Lift Method
Pig Lift: A New Artificial Lift Method
Abstract
Artificial lift of oil wells is a fairly broad subject. There are many different methods available but in a few cases none of them turns out to be a fit ...
Investigation of multiple lift-tube air-lift pumps: Experimental evaluation and predictive modelling
Investigation of multiple lift-tube air-lift pumps: Experimental evaluation and predictive modelling
Due to limited pumping capability the commercial use of the single lift-tube air-lift pump has been confined to very little applications. To overcome the limited pumping capability...
A Multicenter Retrospective Analysis on Pentostatin As Salvage Therapy of Severe Steroid Refractory Intestinal Acute Graft Versus Host Disease
A Multicenter Retrospective Analysis on Pentostatin As Salvage Therapy of Severe Steroid Refractory Intestinal Acute Graft Versus Host Disease
Abstract
Abstract 3048
Acute graft-versus-host disease (aGvHD) of the gastrointestinal (GI) tract is still a major clinical challenge after allogeneic...
Artificial Lift Selection Strategy to Maximize Unconventional Oil and Gas Assets Value
Artificial Lift Selection Strategy to Maximize Unconventional Oil and Gas Assets Value
Abstract
The challenges of producing and lifting unconventional oil and gas economically is no doubt the most daunting phase of unconventional oil and gas developmen...