Javascript must be enabled to continue!
Evaluation method of rain–flood resource utilization availability and its application in the Hanjiang River Basin
View through CrossRef
Abstract
Rain–flood utilization refers to transforming some amount of rain or floodwater into ordinary water resources without decreasing flood control standards or damaging the ecological environment of rivers, which has gained widespread attention as it can alleviate water shortages and gain benefits. This paper put forward the evaluation method of rain–flood utilization availability at the distributed watershed scale. Based on the water node, some indices of rain–flood utilization availability were defined. Then the evaluation method and calculation process were unified. Finally, the status and potential of the rain–flood utilization of Hanjiang River Basin were analyzed. The results indicated that the rain–flood resource in the whole basin is 48.9 billion m3, the outflow is 29.9 billion m3, and the actual utilization is about 19.0 billion m3. The current available rain–flood amount and rain–flood utilization potential are 27.7 billion m3 and 11.0 billion m3, and the rain–flood utilization rate is 49.4%. Limited by regulation ability and the rain–flood resources, current rain–flood utilization has a clear threshold range. The potential utilization objects are mainly for a rainfall process of about two to ten years return period. The application in Hanjiang River Basin offers some practical information for assessing rain–flood utilization scientifically, and the premise for effectively guiding and formulating adaptive countermeasures for water resources management.
Title: Evaluation method of rain–flood resource utilization availability and its application in the Hanjiang River Basin
Description:
Abstract
Rain–flood utilization refers to transforming some amount of rain or floodwater into ordinary water resources without decreasing flood control standards or damaging the ecological environment of rivers, which has gained widespread attention as it can alleviate water shortages and gain benefits.
This paper put forward the evaluation method of rain–flood utilization availability at the distributed watershed scale.
Based on the water node, some indices of rain–flood utilization availability were defined.
Then the evaluation method and calculation process were unified.
Finally, the status and potential of the rain–flood utilization of Hanjiang River Basin were analyzed.
The results indicated that the rain–flood resource in the whole basin is 48.
9 billion m3, the outflow is 29.
9 billion m3, and the actual utilization is about 19.
0 billion m3.
The current available rain–flood amount and rain–flood utilization potential are 27.
7 billion m3 and 11.
0 billion m3, and the rain–flood utilization rate is 49.
4%.
Limited by regulation ability and the rain–flood resources, current rain–flood utilization has a clear threshold range.
The potential utilization objects are mainly for a rainfall process of about two to ten years return period.
The application in Hanjiang River Basin offers some practical information for assessing rain–flood utilization scientifically, and the premise for effectively guiding and formulating adaptive countermeasures for water resources management.
Related Results
Analyzing the Evolution of Droughts and Floods During the Flood Season in the Yangtze River Basin and the Three Gorges Reservoir Area from 1470 to 2022
Analyzing the Evolution of Droughts and Floods During the Flood Season in the Yangtze River Basin and the Three Gorges Reservoir Area from 1470 to 2022
Abstract
As an important economic region in China, The Yangtze River economic belt encountered a historically rare successive drought in 2022. Here even appeared a phenomen...
ASP Flood After a Polymer Flood vs. ASP Flood After a Water Flood
ASP Flood After a Polymer Flood vs. ASP Flood After a Water Flood
Abstract
Alkaline-surfactant-polymer (ASP) flooding is an effective technique to improve oil recovery. It has been applied typically after a water flood. Recently, t...
Sustaining the Pearl River: Problems, Chanllenges, and Opportunities
Sustaining the Pearl River: Problems, Chanllenges, and Opportunities
The Pearl River is a large water system, which is the second largest river (in terms of mean annual water discharge) in China. The Pearl River Basin consists of three major rivers,...
On the Rock-basins in the Granite of the Dartmoor District, Devonshire
On the Rock-basins in the Granite of the Dartmoor District, Devonshire
In this Memoir the origin of Rock-basins in the Granite of Dartmoor and its vicinity is alone considered; and it is not attempted to draw therefrom any law as to the manner of the ...
Numerical Simulation of Flood Propagation in the Kelara River Flood Early Warning System
Numerical Simulation of Flood Propagation in the Kelara River Flood Early Warning System
Flood historical data from the Kelara River in the last 10 years shows that the river has often overflowed, and the worst floods happened on January 22, 2019. One of the efforts to...
Study on hazard assessment of mountainous flood in riverside country- a case study in Xinshan, Hubei, China
Study on hazard assessment of mountainous flood in riverside country- a case study in Xinshan, Hubei, China
Abstract
Mountainous riverside countries have already become the weaknesses of flood disaster control infrastructure in China, so flood calculation based on hydrauli...
Assessment of Flood Risk Analysis in Selangor
Assessment of Flood Risk Analysis in Selangor
Flood events occur every year especially during the monsoon season. Although its consequences are not as disastrous as other natural disasters such as earthquakes and tornado storm...
Real-Time Flood Classification Forecasting Based on k-Means++ Clustering and Neural Network
Real-Time Flood Classification Forecasting Based on k-Means++ Clustering and Neural Network
Abstract
Floods are one of the most dangerous disasters that affect human beings. Timely and accurate flood forecasting can effectively reduce losses to human life and prop...

