APIA PORT BREAKWATER RECONSTRUCTION

View through CrossRef
Samoa is located in the South Pacific Ocean, about halfway between Hawaii and New Zealand. The first wharf at Apia (185m long) was constructed in 1966 and a 100m long breakwater with 8t Dolos armor units was constructed in 1988-89 to provide shelter. Following large cyclones in the early 1990s, the breakwater was rehabilitated in 1996 with larger 20t Dolos armor units. In 2003 a solid concrete crown wall added to the breakwater to mitigate wave transmission into the harbor. There is limited toe and scour protection and multiple units have broken legs, cracks and rust stains from corroding steel reinforcement. The design intent of the breakwater upgrading project is to improve resilience to extreme climatic and natural disaster events. Reconstructing the breakwater with a higher crest, larger roundhead, new concrete armor units, toe support and a scour apron was selected as the most appropriate option to meet the design criteria. Physical modelling was undertaken to verify and optimize the design. Wave calibration indicated good correlation with numerical modelling and showed that for offshore wave heights of ~11.5m and greater the near structure wave height is depth limited (Hs ~9.1m). The physical model testing indicated that the existing 20t Dolos units on the rear slope are unstable under the 1percent AEP event as the base units have limited rock toe support. Further model testing was undertaken using 16m3 Xblocs on the leeside which was successful and detailed design was completed accordingly.
Title: APIA PORT BREAKWATER RECONSTRUCTION
Description:
Samoa is located in the South Pacific Ocean, about halfway between Hawaii and New Zealand.
The first wharf at Apia (185m long) was constructed in 1966 and a 100m long breakwater with 8t Dolos armor units was constructed in 1988-89 to provide shelter.
Following large cyclones in the early 1990s, the breakwater was rehabilitated in 1996 with larger 20t Dolos armor units.
In 2003 a solid concrete crown wall added to the breakwater to mitigate wave transmission into the harbor.
There is limited toe and scour protection and multiple units have broken legs, cracks and rust stains from corroding steel reinforcement.
The design intent of the breakwater upgrading project is to improve resilience to extreme climatic and natural disaster events.
Reconstructing the breakwater with a higher crest, larger roundhead, new concrete armor units, toe support and a scour apron was selected as the most appropriate option to meet the design criteria.
Physical modelling was undertaken to verify and optimize the design.
Wave calibration indicated good correlation with numerical modelling and showed that for offshore wave heights of ~11.
5m and greater the near structure wave height is depth limited (Hs ~9.
1m).
The physical model testing indicated that the existing 20t Dolos units on the rear slope are unstable under the 1percent AEP event as the base units have limited rock toe support.
Further model testing was undertaken using 16m3 Xblocs on the leeside which was successful and detailed design was completed accordingly.

Related Results

Study of Port Tariff Structure and Port Pricing Approach
Study of Port Tariff Structure and Port Pricing Approach
In order to support National Logistics System continuity there are at least three (3) main components that should synergize well, namely the sea side (sea transport), the land side...
DETECTION OF BREAKWATER FAILURE MODES FROM PHOTOGRAMMETRIC DERIVED POINT CLOUDS – A CASE STUDY FOR BUNBURY PORT, WESTERN AUSTRALIA
DETECTION OF BREAKWATER FAILURE MODES FROM PHOTOGRAMMETRIC DERIVED POINT CLOUDS – A CASE STUDY FOR BUNBURY PORT, WESTERN AUSTRALIA
The concept of a digital twin is increasingly applied to a wide range of physical assets as it offers spatial contextualisation, temporal contextualisation, simulation, and optimis...
Evaluation of Compulsory Regulatory Port Services and Revenue Generation of Onne Port Nigeria
Evaluation of Compulsory Regulatory Port Services and Revenue Generation of Onne Port Nigeria
Compulsory regulatory services are those port services which are required by Port Authority to provide to port users and/or vessels that call to the port. These services are by por...
FORCES INDUCED ON A VERTICAL BREAKWATER BY INCIDENT OBLIQUE WAVES
FORCES INDUCED ON A VERTICAL BREAKWATER BY INCIDENT OBLIQUE WAVES
Over the last years Navier-Stokes numerical models have been developed to accurately simulate wave interaction with all kinds of coastal structures, focusing on both functionality ...
Wave Transformation Pattern in Submerged Breakwater Planning with 2D Wave Model at Mengening Beach, Badung Regency, Bali, Indonesia
Wave Transformation Pattern in Submerged Breakwater Planning with 2D Wave Model at Mengening Beach, Badung Regency, Bali, Indonesia
Mengening Beach is located in Badung Regency, Bali, Indonesia. The average erosion rate in Badung Regency is 1.96 m/year, so the right plan is a submerged breakwater to reduce wave...
CONSTRUCTION OF NAGOYA STORM-TIDE-PREVENTING BREAKWATER
CONSTRUCTION OF NAGOYA STORM-TIDE-PREVENTING BREAKWATER
The Nagoya Storm-Tide-Preventing Breakwater is a large-scale Breakwater built as a link in the general Ise Bay Storm-Tide-Prevention Project. The entire length of this breakwater i...
Smooth Redemption Policy of Port Facilities in Case of Ocean Space Utilization
Smooth Redemption Policy of Port Facilities in Case of Ocean Space Utilization
The ports of the world are operated by port authorities. The systems for establishing port facilities are roughly classified into two types depending on their sources of revenue. I...
A Study on the Shipping Accessibility between Yangpu Port and Haikou Port in China
A Study on the Shipping Accessibility between Yangpu Port and Haikou Port in China
Yangpu Port and Haikou Port, as important components of the Hainan Free Trade Port, play a critical role in the regional economic development through their port layout and shipping...