Javascript must be enabled to continue!
An optimization method of horizontal well completion control water and sand
View through CrossRef
Abstract
With the development and maturity of horizontal well drilling and completion technology, horizontal wells are widely used in various reservoirs and have achieved good development results. Due to horizontal wells in the reservoir through a long distance, horizontal section of the reservoir physical property heterogeneity, water avoidance height difference and horizontal wellbore flow with toe effect, leading to production pressure difference and water breakthrough time in all parts of the shaft is different, the level of sand and bottom water cresting is strong heterogeneity, oil well early water breakthrough and local a large amount of sand production, the serious influence of horizontal well production and development of comprehensive benefits. In this paper, based on the prediction model of critical production pressure difference of sand production in horizontal wells and the prediction model of water appearance time of horizontal Wells in bottom water reservoir, the critical production pressure difference and water appearance time of sand production in each micro-element section are quantitatively determined along the horizontal well section, so as to form a design method of horizontal well completion that takes water and sand control into account. And ICD horizontal well completion method as the research object, water breakthrough time, yield as the optimization goal, control sand as constraint conditions, with each section down into the number of ICD string and nozzle sizes as design variables, the ICD horizontal well completion parameters established multi-objective optimization model, obtained the comprehensive consideration of water control sand control effect of the optimal ICD completion program.
Title: An optimization method of horizontal well completion control water and sand
Description:
Abstract
With the development and maturity of horizontal well drilling and completion technology, horizontal wells are widely used in various reservoirs and have achieved good development results.
Due to horizontal wells in the reservoir through a long distance, horizontal section of the reservoir physical property heterogeneity, water avoidance height difference and horizontal wellbore flow with toe effect, leading to production pressure difference and water breakthrough time in all parts of the shaft is different, the level of sand and bottom water cresting is strong heterogeneity, oil well early water breakthrough and local a large amount of sand production, the serious influence of horizontal well production and development of comprehensive benefits.
In this paper, based on the prediction model of critical production pressure difference of sand production in horizontal wells and the prediction model of water appearance time of horizontal Wells in bottom water reservoir, the critical production pressure difference and water appearance time of sand production in each micro-element section are quantitatively determined along the horizontal well section, so as to form a design method of horizontal well completion that takes water and sand control into account.
And ICD horizontal well completion method as the research object, water breakthrough time, yield as the optimization goal, control sand as constraint conditions, with each section down into the number of ICD string and nozzle sizes as design variables, the ICD horizontal well completion parameters established multi-objective optimization model, obtained the comprehensive consideration of water control sand control effect of the optimal ICD completion program.
Related Results
Sand Production Management
Sand Production Management
Abstract
Sand production may be inevitable in many fields that have a relatively lower formation strength. Sand erosion and settling predictions and sand monitori...
A Sand Failure Test Can Cut Both Completion Costs And The Number Of Developement Wells
A Sand Failure Test Can Cut Both Completion Costs And The Number Of Developement Wells
Abstract
The objective of this Sand Failure Test was to determine whether initial sand control is necessary on a poorly consolidated gas field, or whether it can ...
Chemical Sand Consolidation and Through-Tubing Gravel Pack, the Effective Alternative Sand Control Methods in Zawtika Field
Chemical Sand Consolidation and Through-Tubing Gravel Pack, the Effective Alternative Sand Control Methods in Zawtika Field
Abstract
Sand production has been highlighted as one of the critical challenges for Zawtika Project. Throughout the years of field experiences, sand production manag...
A comprehensive review of cased hole sand control optimization techniques: Theoretical and practical perspectives
A comprehensive review of cased hole sand control optimization techniques: Theoretical and practical perspectives
Cased hole sand control is a critical aspect of oil and gas well management, ensuring efficient production by mitigating sand production issues. This review presents a comprehensiv...
Evaluating the Sand-Trapping Efficiency of Sand Fences Using a Combination of Wind-Blown Sand Measurements and UAV Photogrammetry at Tottori Sand Dunes, Japan
Evaluating the Sand-Trapping Efficiency of Sand Fences Using a Combination of Wind-Blown Sand Measurements and UAV Photogrammetry at Tottori Sand Dunes, Japan
Fences are commonly used in coastal regions to control wind-blown sand. Sand-trapping fences and sand-stabilizing fences have been installed at the Tottori Sand Dunes, Tottori Pref...
Sand Control Techniques in Shengli Oilfield
Sand Control Techniques in Shengli Oilfield
ABSTRACT
Shengli Oilfield has been developed for more than twenty years. The problem of sand production has existed since its development. About one third of the tot...
Sand Consolidation Preflush Dynamics
Sand Consolidation Preflush Dynamics
Penberthy Jr., W.L., SPE-AIME, Penberthy Jr., W.L., SPE-AIME, Exxon Production Research Co. Shaughnessy, C.M., SPE-AIME, Exxon Production Research Co. Gruesbeck, C., SPE-AIME, Exxo...
Challenging Well with Sand Production Risk is Economically Developed Using Oriented Perforation
Challenging Well with Sand Production Risk is Economically Developed Using Oriented Perforation
Abstract
The subject field is located south of Ras Shukier area in the Gulf of Suez offshore the northeastern part of Egypt. The field produces from LR Formation whi...

