Platform Production And Injection Facilities - Mc Arthur River Field

View through CrossRef
Abstract Over the past five years the application of turbomachinery for use in conjunction with the exploration and development of oil and gas has gained increasing popularity within the industry, especially in offshore and isolated or remote locations. The several operational and environmental considerations leading to the selection of turbomachinery for use on Union Oil's Grayling Platform, located In Alaska's Upper Cook Inlet, Platform, located In Alaska's Upper Cook Inlet, will be reviewed. Also included is performance data on specific turbine driven equipment along with recommendations outlining installation, operation and preventive maintenance procedures to promote a successful turbomachinery application. Introduction The Grayling Platform was originally constructed as a typical Cook Inlet "four poster type" self-contained drilling and poster type" self-contained drilling and production facility. It was designed to production facility. It was designed to accommodate simultaneous operation of two DC powered drilling rigs, and was installed with powered drilling rigs, and was installed with mud pumps and tanks, cementing and logging units, mud and cement storage, etc., to perform all normal drilling functions. The platform also contained oil and gas separation equipment, along with associated manifolding and piping, diesel powered AC generator sets, glycol-water boilers powered AC generator sets, glycol-water boilers for platform heating, instrument air compressors, salt water and dry chemical fire protection equipment, two 50 ton pedestal mounted cranes, and a 70 man quarters with an attached heliport. The platform is located in Cook Inlet's Trading Bay, approximately 45 miles southwest of Anchorage, Alaska. It is basically supported by four 17 ft. diameter legs in approximately 140 ft. of water. It has three equipment deck levels: the drilling and production decks, spaced 20 ft. apart, which are both 120 ft. square, and a 47 ft. X 60 ft. sub-deck located between four 17 ft. diameter horizontal beam tanks which comprise the top of the structural jacket (See Fig. 1). The platform is pinned to the Inlet floor by twelve 33 In. diameter piles driven through each of the four legs and grouted in place. These piles also serve as conductors through which as many as 48 wells can be directionally drilled from the platform to measured depths of over 16,000 ft. for the development of subterranean oil producing zones. The platform is subject to the corrosive and erosive effects of oxygen saturated and silt laden Cook Inlet sea water.
Title: Platform Production And Injection Facilities - Mc Arthur River Field
Description:
Abstract Over the past five years the application of turbomachinery for use in conjunction with the exploration and development of oil and gas has gained increasing popularity within the industry, especially in offshore and isolated or remote locations.
The several operational and environmental considerations leading to the selection of turbomachinery for use on Union Oil's Grayling Platform, located In Alaska's Upper Cook Inlet, Platform, located In Alaska's Upper Cook Inlet, will be reviewed.
Also included is performance data on specific turbine driven equipment along with recommendations outlining installation, operation and preventive maintenance procedures to promote a successful turbomachinery application.
Introduction The Grayling Platform was originally constructed as a typical Cook Inlet "four poster type" self-contained drilling and poster type" self-contained drilling and production facility.
It was designed to production facility.
It was designed to accommodate simultaneous operation of two DC powered drilling rigs, and was installed with powered drilling rigs, and was installed with mud pumps and tanks, cementing and logging units, mud and cement storage, etc.
, to perform all normal drilling functions.
The platform also contained oil and gas separation equipment, along with associated manifolding and piping, diesel powered AC generator sets, glycol-water boilers powered AC generator sets, glycol-water boilers for platform heating, instrument air compressors, salt water and dry chemical fire protection equipment, two 50 ton pedestal mounted cranes, and a 70 man quarters with an attached heliport.
The platform is located in Cook Inlet's Trading Bay, approximately 45 miles southwest of Anchorage, Alaska.
It is basically supported by four 17 ft.
diameter legs in approximately 140 ft.
of water.
It has three equipment deck levels: the drilling and production decks, spaced 20 ft.
apart, which are both 120 ft.
square, and a 47 ft.
X 60 ft.
sub-deck located between four 17 ft.
diameter horizontal beam tanks which comprise the top of the structural jacket (See Fig.
1).
The platform is pinned to the Inlet floor by twelve 33 In.
diameter piles driven through each of the four legs and grouted in place.
These piles also serve as conductors through which as many as 48 wells can be directionally drilled from the platform to measured depths of over 16,000 ft.
for the development of subterranean oil producing zones.
The platform is subject to the corrosive and erosive effects of oxygen saturated and silt laden Cook Inlet sea water.

Related Results

Overview of Key Zonal Water Injection Technologies in China
Overview of Key Zonal Water Injection Technologies in China
Abstract Separated layer water injection is the important technology to realize the oilfield long-term high and stable yield. Through continuous researches and te...
Design And Operation Of The Levelland Unit CO2 Injection Facility
Design And Operation Of The Levelland Unit CO2 Injection Facility
Abstract The Levelland CO2 Facility provides CO2 storageand handling capacity for the five CO2 injection pilots located in the Levelland Unit. Facilities pilots l...
Waterflood Optimization in Nahr Umr Sandstone Reservoir in Bahrain Field Using Ensemble of Novel Analytical Techniques
Waterflood Optimization in Nahr Umr Sandstone Reservoir in Bahrain Field Using Ensemble of Novel Analytical Techniques
Abstract The Sandstone reservoir is on production since 1941. Water injection (WI) started since January 2013 and full fledge injection commenced through injectors i...
Application of Novel Techniques to Fractured Injection Diagnostics in Waterflood Developments
Application of Novel Techniques to Fractured Injection Diagnostics in Waterflood Developments
Abstract Controlled injection at high rates predominantly under fracture regime has been identified at the onset of most waterflood field developments as being cruci...
Control of Water Injection into a Layered Formation
Control of Water Injection into a Layered Formation
Abstract In previously published work, we have analyzed transient injection of water from a growing vertical hydrofracture into a low-permeability compressible rock ...
Practices of the Integrated Management System for Injection Water in Brown Field –Case Study
Practices of the Integrated Management System for Injection Water in Brown Field –Case Study
Abstract As the exploration degree and strength are continuously increased, both average water cut and natural decline rate have the tendency for increase. Hence var...
The Removal of the Maureen Steel Gravity Platform
The Removal of the Maureen Steel Gravity Platform
Abstract The Maureen drilling, production and oil storage platform is located in 95.6m of water in block 16/29 of the U.K. Continental Shelf, and consists of a la...