Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Agustian, Daden Metode Pelaksanaan Pekerjaan Strauss Pile Proyek Gedung Kejaksaan Negeri Majalengka

View through CrossRef
Construction work is divided into different scopes of work, including structural, architectural, MEP and others. The structure is a means that functions to distribute live loads and dead loads into the ground. One part of the structure is the foundation which is a part of the building construction whose task is to place and transmit the load of the upper part of the building to the subgrade. The selection of the type of foundation structure is carried out by taking into account the condition of the soil, the limitations imposed by the structure above it, the limitations of the surrounding environment, the cost and time of carrying out the work. For example, the Majalengka District Attorney's building construction project uses a Strauss Pile foundation as the lower. Strauss foundation is a type of foundation that is used to carry loads when hard soil that has a strong bearing capacity is located very deep from the ground surface. In this project, the implementation of the Strauss Pile work refers to the provisions that must have the ASTM D 1143-81 standard regarding static compressive loading, using concrete quality K300 and reinforcing steel Ø ≥ 10 BJTD 40 and Ø≤ 10 BJTP 24. The work process starts from a series of works Preparation includes administrative equipment, land clearing and measurements, then carrying out work starting from drilling using a mini crane auger to casting, and finally testing as a technical report.
Title: Agustian, Daden Metode Pelaksanaan Pekerjaan Strauss Pile Proyek Gedung Kejaksaan Negeri Majalengka
Description:
Construction work is divided into different scopes of work, including structural, architectural, MEP and others.
The structure is a means that functions to distribute live loads and dead loads into the ground.
One part of the structure is the foundation which is a part of the building construction whose task is to place and transmit the load of the upper part of the building to the subgrade.
The selection of the type of foundation structure is carried out by taking into account the condition of the soil, the limitations imposed by the structure above it, the limitations of the surrounding environment, the cost and time of carrying out the work.
For example, the Majalengka District Attorney's building construction project uses a Strauss Pile foundation as the lower.
Strauss foundation is a type of foundation that is used to carry loads when hard soil that has a strong bearing capacity is located very deep from the ground surface.
In this project, the implementation of the Strauss Pile work refers to the provisions that must have the ASTM D 1143-81 standard regarding static compressive loading, using concrete quality K300 and reinforcing steel Ø ≥ 10 BJTD 40 and Ø≤ 10 BJTP 24.
The work process starts from a series of works Preparation includes administrative equipment, land clearing and measurements, then carrying out work starting from drilling using a mini crane auger to casting, and finally testing as a technical report.

Related Results

Kedudukan Kejaksaan Dalam Ketatanegaraan Dari Prespektif (Hukum Tata Negara)
Kedudukan Kejaksaan Dalam Ketatanegaraan Dari Prespektif (Hukum Tata Negara)
Kejaksaan merupakan salah satu lembaga negara yang memiliki peran penting dalam sistem ketatanegaraan Indonesia. Kedudukan kejaksaan diatur dalam Undang-Undang Nomor 16 Tahun 2004 ...
Analysis Of Three-Dimensional Pile Groups With Nonlinear Soil Response And Pile-Soil-Pile Interaction
Analysis Of Three-Dimensional Pile Groups With Nonlinear Soil Response And Pile-Soil-Pile Interaction
ABSTRACT Present methods of pile group analysis are either limited to special geometric cases or do not consider pile-soil-pile interaction. An analytical procedu...
Model Test of Jacked Pile Penetration Process Considering Influence of Pile Diameter
Model Test of Jacked Pile Penetration Process Considering Influence of Pile Diameter
In order to investigate the influence of different diameters on pile end resistance, pile side resistance, pile axial force and pile force transmission law of jacked pile penetrati...
Simplified Heat Transfer Model for Spiral‐Coil Energy Pile Groups and the Pile–Pile Thermal Interference
Simplified Heat Transfer Model for Spiral‐Coil Energy Pile Groups and the Pile–Pile Thermal Interference
ABSTRACTThe spiral heat exchanger of the energy pile groups is divided into multiple segments. Each heat exchanger segment is regarded as a three‐dimensional spiral heat source of ...
Pile–Soil Interaction and Group Pile Effect in Composite Foundation Under Different Pile Length Conditions
Pile–Soil Interaction and Group Pile Effect in Composite Foundation Under Different Pile Length Conditions
With the rapid development of urbanization and infrastructure construction, the requirements for the foundation design of high-rise buildings and large bridges are increasing. Pile...
Pile Driving Measurements On The Heather Platform Installation
Pile Driving Measurements On The Heather Platform Installation
Abstract The first leg piles of the Heather Platform were instrumented using strain transducers and accelerometers that were attached to the pile just below its t...
Analisis Estimasi Penyelesaian Proyek Konstruksi terhadap Waktu dan Biaya
Analisis Estimasi Penyelesaian Proyek Konstruksi terhadap Waktu dan Biaya
Proyek konstruksi merupakan kegiatan yang memiliki tingkat kompleksitas tinggi, sehingga sering terjadi keterlambatan penyelesaian proyek maupun pembengkakan biaya akibat sistem ma...
Urgensi Kejaksaan Diatur oleh Konstitusi
Urgensi Kejaksaan Diatur oleh Konstitusi
Eksistensi kejaksaan dalam struktur ketatanegaraan Indonesia memiliki posisi yang dilematis selama ini. Di satu sisi, kejaksaan adalah lembaga penegak hukum yang menjalankan kekuas...

Back to Top