Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Drilling Without Conductors Piper Field Development

View through CrossRef
Trendall, T., Occidental Petroleum (Caledonia) Ltd. UK Abstract Occidental discovered the Piper field in the UK of the North Sea, 100 miles east of Wick on block 15/17 in January 1973. After the discovery well, another six wells were drilled to delineate the field. Early on in the appraisal drilling programme, it was decided a single steel platform with twin drilling rigs would effectively develop the field. The size of the platform (one of the largest steel platforms set in the deepest water at the time of setting) caused Occidental to develop a unique concept to help decrease the live loading on the platform construction and development drilling and helping speed initial production start-up. Experience gained from the exploration programme helped Occidental decide that it would be possible to develop Piper, utilizing a redesigned 20 in. string as conductor and doing away with the 30 in. string altogether. This concept was then incorporated into the final design of the platform. PIPER DEVELOPMENT HISTORY PIPER DEVELOPMENT HISTORY The Occidental consortium's interest in the British sector of the North Sea shifted to activate exploration in 1970 following the Ekofish discovery in the Norwegian sector. On the basis of 20,000 miles of seismic data. Occidental placed application for British North Sea blocks with the government in 19712. In March 1972, the government awarded Occidental a petroleum licence for six blocks covering approximately 316,000 acres. Two months after the award. Occidental spudded its first well block 15/11. It was dry. The second well was drilled on 14/19 (Claymore) this was also a failure although shows were encountered. The third well was spudded on 15/17 (Piper). This well had to be abandoned at 750 ft due to weather conditions getting the better of the drill ship used. A new semi-submersible rig. The Ocean Victory, was acquired and this rig spudded 15/17-la in November 1972. This well flowed at a combined rate of about 90,000 bopd and the field was designated Piper field.
Title: Drilling Without Conductors Piper Field Development
Description:
Trendall, T.
, Occidental Petroleum (Caledonia) Ltd.
UK Abstract Occidental discovered the Piper field in the UK of the North Sea, 100 miles east of Wick on block 15/17 in January 1973.
After the discovery well, another six wells were drilled to delineate the field.
Early on in the appraisal drilling programme, it was decided a single steel platform with twin drilling rigs would effectively develop the field.
The size of the platform (one of the largest steel platforms set in the deepest water at the time of setting) caused Occidental to develop a unique concept to help decrease the live loading on the platform construction and development drilling and helping speed initial production start-up.
Experience gained from the exploration programme helped Occidental decide that it would be possible to develop Piper, utilizing a redesigned 20 in.
string as conductor and doing away with the 30 in.
string altogether.
This concept was then incorporated into the final design of the platform.
PIPER DEVELOPMENT HISTORY PIPER DEVELOPMENT HISTORY The Occidental consortium's interest in the British sector of the North Sea shifted to activate exploration in 1970 following the Ekofish discovery in the Norwegian sector.
On the basis of 20,000 miles of seismic data.
Occidental placed application for British North Sea blocks with the government in 19712.
In March 1972, the government awarded Occidental a petroleum licence for six blocks covering approximately 316,000 acres.
Two months after the award.
Occidental spudded its first well block 15/11.
It was dry.
The second well was drilled on 14/19 (Claymore) this was also a failure although shows were encountered.
The third well was spudded on 15/17 (Piper).
This well had to be abandoned at 750 ft due to weather conditions getting the better of the drill ship used.
A new semi-submersible rig.
The Ocean Victory, was acquired and this rig spudded 15/17-la in November 1972.
This well flowed at a combined rate of about 90,000 bopd and the field was designated Piper field.

Related Results

Inspection of Subsea Conductors Using an Innovative Drop-Down Camera
Inspection of Subsea Conductors Using an Innovative Drop-Down Camera
Abstract Subsea conductors are the foundational elements of offshore drilling operations, serving a dual purpose as both the structural framework and the main condui...
Drilling Variables At Technical Limit Of Drilling Rate
Drilling Variables At Technical Limit Of Drilling Rate
Abstract Recorded drilling times may show significant variations from well to well even for the same total depth in the same field. Apart from the formation chara...
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Drilling in deeper formations and in high pressure and high temperature (HPHT) environments is a new frontier for the oil industry. Fifty years ago, no one would have imagined dril...
Planning Drilling Fluid Programs in Southeast Asia
Planning Drilling Fluid Programs in Southeast Asia
Planning the drilling fluids program is one of the most important steps in Planning the drilling fluids program is one of the most important steps in preparation for the drilling o...
Kajian Potensi Aktivitas Antibakteri Tanaman Genus Piper terhadap Bakteri Patogen Penyebab Infeksi Periodontal
Kajian Potensi Aktivitas Antibakteri Tanaman Genus Piper terhadap Bakteri Patogen Penyebab Infeksi Periodontal
Abstract. Oral pathogenic bacteria collectively play a role in the formation of infections in the oral cavity through the accumulation of bacterial colonization. One way to control...
Casing Drilling with Retrievable Drilling Assemblies
Casing Drilling with Retrievable Drilling Assemblies
Abstract Retrievable Casing Drilling* tools have been used to drill more than 600,000 ft of hole in over 120 wells encompassing six casing sizes ranging from 4-1/...
Pit Less Drilling Significantly Reduces Wells Environmental Footprint
Pit Less Drilling Significantly Reduces Wells Environmental Footprint
Abstract Pit less Drilling technology is a technology that eliminates the requirement for earthen pits or sumps to capture waste fluid. In this paper we will examine...
Numerical Modelling of Cuttings Transport With Foam in Inclined Wells
Numerical Modelling of Cuttings Transport With Foam in Inclined Wells
Abstract In this study, a 1-D transient state mechanistic model of cuttings transport with foam in inclined wells has been developed. The model is solved numerica...

Back to Top