Water Isolation and Sand Control: Breaking Barriers with Expandable Steel Patch Technology

View through CrossRef
Abstract This paper describes the design, planning, and successful installation of a fit-for-purpose casing patch to isolate a water producing zone, the subsequent perforation of an adjacent zone, and a gravel pack completion in the same well for the first time worldwide. The proximity of the zones and the sand control requirements made the design and planning of this job a challenging task that is detailed in this manuscript. The main producing zone in the SW-21 well watered out after few years of production. A second target was identified located just four feet below the main zone. To extend the life of the well and to add reserves from the secondary target, the upper 100% water zone had to be isolated. A fit-for-purpose, thin wall casing patch solution was designed to: allow perforation of the secondary target while maintaining patch integrity, allowing for the installation of sand control screens; and resist following gravel pack completion, by keeping the minimum recommended clearance between casing and screens, inside the minimal patch-reduced diameter. The re-completions program consisted of: 1. Successful recovery of existing gravel pack from the main producing zone and thorough wellbore cleanup. 2. Casing patch installation consisting of a 23-ft long patch to isolate the water-producing zone. In this case, a specific engineering design analysis was required to ensure that, because of the very close distances between zones, the patch would still maintain integrity during perforation of the secondary target and the resulting patch overlap. 3. Successful integrity test to confirm upper interval isolation before perforating the lower interval. 4. A precise perforating operation carried out to perforate the secondary zone. Based on engineering recommendations, some length of the installed patch was perforated to guarantee a minimum unperforated distance of casing patch between zones to guarantee patch sealing features. 5. Once perforation was successfully accomplished, a gravel pack completion—inside the casing patch reduced diameter—was executed along the new zone for sand control purposes, and the well was put into production. This paper presents the different interactions between a multidisciplinary research and development team, and completions and reservoir engineers to come up with a full solution for water isolation and sand control under such challenging conditions. For the first time in the world, a casing patch was used to isolate a water zone, and at the same time, perform a gravel pack completion inside the patch reduced diameter. Well performance, without any mechanical issues, confirms the success of the provided solution.
Title: Water Isolation and Sand Control: Breaking Barriers with Expandable Steel Patch Technology
Description:
Abstract This paper describes the design, planning, and successful installation of a fit-for-purpose casing patch to isolate a water producing zone, the subsequent perforation of an adjacent zone, and a gravel pack completion in the same well for the first time worldwide.
The proximity of the zones and the sand control requirements made the design and planning of this job a challenging task that is detailed in this manuscript.
The main producing zone in the SW-21 well watered out after few years of production.
A second target was identified located just four feet below the main zone.
To extend the life of the well and to add reserves from the secondary target, the upper 100% water zone had to be isolated.
A fit-for-purpose, thin wall casing patch solution was designed to: allow perforation of the secondary target while maintaining patch integrity, allowing for the installation of sand control screens; and resist following gravel pack completion, by keeping the minimum recommended clearance between casing and screens, inside the minimal patch-reduced diameter.
The re-completions program consisted of: 1.
Successful recovery of existing gravel pack from the main producing zone and thorough wellbore cleanup.
2.
Casing patch installation consisting of a 23-ft long patch to isolate the water-producing zone.
In this case, a specific engineering design analysis was required to ensure that, because of the very close distances between zones, the patch would still maintain integrity during perforation of the secondary target and the resulting patch overlap.
3.
Successful integrity test to confirm upper interval isolation before perforating the lower interval.
4.
A precise perforating operation carried out to perforate the secondary zone.
Based on engineering recommendations, some length of the installed patch was perforated to guarantee a minimum unperforated distance of casing patch between zones to guarantee patch sealing features.
5.
Once perforation was successfully accomplished, a gravel pack completion—inside the casing patch reduced diameter—was executed along the new zone for sand control purposes, and the well was put into production.
This paper presents the different interactions between a multidisciplinary research and development team, and completions and reservoir engineers to come up with a full solution for water isolation and sand control under such challenging conditions.
For the first time in the world, a casing patch was used to isolate a water zone, and at the same time, perform a gravel pack completion inside the patch reduced diameter.
Well performance, without any mechanical issues, confirms the success of the provided solution.

Related Results

Sand Production Management
Sand Production Management
Abstract Sand production may be inevitable in many fields that have a relatively lower formation strength. Sand erosion and settling predictions and sand monitori...
Evolution law of wind-sand flow field of multi-row reed sand barriers and optimal spacing
Evolution law of wind-sand flow field of multi-row reed sand barriers and optimal spacing
Abstract The multi-row sand barriers have been widely concerned about their high efficiency wind and sand prevention effect in the sand blown prevention and control for roa...
A comprehensive review of cased hole sand control optimization techniques: Theoretical and practical perspectives
A comprehensive review of cased hole sand control optimization techniques: Theoretical and practical perspectives
Cased hole sand control is a critical aspect of oil and gas well management, ensuring efficient production by mitigating sand production issues. This review presents a comprehensiv...
A Sand Failure Test Can Cut Both Completion Costs And The Number Of Developement Wells
A Sand Failure Test Can Cut Both Completion Costs And The Number Of Developement Wells
Abstract The objective of this Sand Failure Test was to determine whether initial sand control is necessary on a poorly consolidated gas field, or whether it can ...
Sand Consolidation Preflush Dynamics
Sand Consolidation Preflush Dynamics
Penberthy Jr., W.L., SPE-AIME, Penberthy Jr., W.L., SPE-AIME, Exxon Production Research Co. Shaughnessy, C.M., SPE-AIME, Exxon Production Research Co. Gruesbeck, C., SPE-AIME, Exxo...
Sand Control Techniques in Shengli Oilfield
Sand Control Techniques in Shengli Oilfield
ABSTRACT Shengli Oilfield has been developed for more than twenty years. The problem of sand production has existed since its development. About one third of the tot...
Refining intra-patch connectivity measures in landscape fragmentation and connectivity indices
Refining intra-patch connectivity measures in landscape fragmentation and connectivity indices
Abstract Context. Measuring intra-patch connectivity, i.e. the connectivity within a habitat patch, is important to evaluate landscape fragmentation and connectivity. Howev...

Back to Top