Javascript must be enabled to continue!
Fast and operational building damage estimation tool for urban pluvial flooding
View through CrossRef
Estimating flood damage is crucial for both disaster risk reduction in the prevention phase and crisis management during flood events. While models for predicting damage from riverine floods are well-developed, tools for estimating damage from urban pluvial flooding are less advanced. This is an important gap, as heavy rainfall can lead to flooding in a wide range of locations, not just along rivers.Here, we present a new machine learning-based tool to quickly estimate building-level damage from urban pluvial flooding caused by heavy rainfall. Three key improvements are incorporated into this tool, compared to the traditional use of stage-damage models developed for riverine floods in dismissal of the flood pathway or the use of newer, overly complex models. First, it was trained on data specifically from known urban pluvial flood events, rather than relying on models developed for riverine floods, which can lead to more accurate damage estimates for this type of flooding. Second, the tool utilizes the XGBoost algorithm, a powerful machine learning technique capable of capturing complex non-linear relationships in the data. Third, the tool's modular design allows users to efficiently utilize available geographical information when making damage estimates by fixing the area of interest and reducing one step of the data preprocessing, towards providing results quickly enough for real-time forecasting applications. To address the common challenge of missing data, the tool uses smart random sampling techniques to impute required building-level features that are representative to known buildings affected by this flood pathway, reducing exposure bias.The performance of the new tool was evaluated in two case studies in Germany, involving approximately 2,400 and 17,500 buildings, respectively. The tool was able to provide damage estimates in 1.1 and 6.0 minutes on a standard laptop, representing a 2-3 fold improvement in speed compared to a baseline approach. Furthermore, to validate the tool, estimates were compared to a fully independent dataset. The new tool reduced the estimate error by a factor of 4.3 compared to employing a riverine flood damage model, demonstrating its improved accuracy for heavy rainfall flooding events, although generally showing overestimation.The new tool, named FlooDEsT – Flood Damage Estimation Tool, comprising the damage function and its application strategy, has shown improvements in computation time and performance at the first pilot studies. Its expansion to other flooding events and comparison with other damage datasets shall clarify its generalization power towards an improved estimation of building damage at urban pluvial floods. 
Title: Fast and operational building damage estimation tool for urban pluvial flooding
Description:
Estimating flood damage is crucial for both disaster risk reduction in the prevention phase and crisis management during flood events.
While models for predicting damage from riverine floods are well-developed, tools for estimating damage from urban pluvial flooding are less advanced.
This is an important gap, as heavy rainfall can lead to flooding in a wide range of locations, not just along rivers.
Here, we present a new machine learning-based tool to quickly estimate building-level damage from urban pluvial flooding caused by heavy rainfall.
Three key improvements are incorporated into this tool, compared to the traditional use of stage-damage models developed for riverine floods in dismissal of the flood pathway or the use of newer, overly complex models.
First, it was trained on data specifically from known urban pluvial flood events, rather than relying on models developed for riverine floods, which can lead to more accurate damage estimates for this type of flooding.
Second, the tool utilizes the XGBoost algorithm, a powerful machine learning technique capable of capturing complex non-linear relationships in the data.
Third, the tool's modular design allows users to efficiently utilize available geographical information when making damage estimates by fixing the area of interest and reducing one step of the data preprocessing, towards providing results quickly enough for real-time forecasting applications.
To address the common challenge of missing data, the tool uses smart random sampling techniques to impute required building-level features that are representative to known buildings affected by this flood pathway, reducing exposure bias.
The performance of the new tool was evaluated in two case studies in Germany, involving approximately 2,400 and 17,500 buildings, respectively.
The tool was able to provide damage estimates in 1.
1 and 6.
0 minutes on a standard laptop, representing a 2-3 fold improvement in speed compared to a baseline approach.
Furthermore, to validate the tool, estimates were compared to a fully independent dataset.
The new tool reduced the estimate error by a factor of 4.
3 compared to employing a riverine flood damage model, demonstrating its improved accuracy for heavy rainfall flooding events, although generally showing overestimation.
The new tool, named FlooDEsT – Flood Damage Estimation Tool, comprising the damage function and its application strategy, has shown improvements in computation time and performance at the first pilot studies.
Its expansion to other flooding events and comparison with other damage datasets shall clarify its generalization power towards an improved estimation of building damage at urban pluvial floods.
 .
Related Results
Mechanism Study on Foam Flooding for Daqing Reservoirs After Polymer Flooding
Mechanism Study on Foam Flooding for Daqing Reservoirs After Polymer Flooding
Abstract
Polymer flooding has been carried out widely in Daqing oilfield. The average oil recovery was 53% and the water cut was more than 90% after polymer flooding...
Studies On Foam Flooding EOR Technique For Daqing Reservoirs After Polymer Flooding
Studies On Foam Flooding EOR Technique For Daqing Reservoirs After Polymer Flooding
Abstract
Most of the high permeability reservoirs in Daqing oil field have been conducted by water flooding and polymer flooding.
The average oil reco...
Optimising tool wear and workpiece condition monitoring via cyber-physical systems for smart manufacturing
Optimising tool wear and workpiece condition monitoring via cyber-physical systems for smart manufacturing
Smart manufacturing has been developed since the introduction of Industry 4.0. It consists of resource sharing and networking, predictive engineering, and material and data analyti...
Practice of the Early Stage Polymer Flooding on LD Offshore Oilfield in Bohai Bay of China
Practice of the Early Stage Polymer Flooding on LD Offshore Oilfield in Bohai Bay of China
Abstract
Literature survey shows that polymer flooding was generally conducted during high water-cut stage (WCT>80%-90%). Even the first China Offshore polyme...
De gevel – een intermediair element tussen buiten en binnen
De gevel – een intermediair element tussen buiten en binnen
This study is based on the fact that all people have a basic need for protection from other people (and animals) as well as from the elements (the exterior climate). People need a ...
Recent Progress and Evaluation of ASP Flooding for EOR in Daqing Oil Field
Recent Progress and Evaluation of ASP Flooding for EOR in Daqing Oil Field
Abstract
Many ASP flooding method have been tested in Daqing oil field. After the success of polymer flooding in Daqing oil field, four alkaline- surfactant-polymer ...
Study on the Profile Control Pilot Test by Microbial after Polymer Floods in Daqing Oilfields
Study on the Profile Control Pilot Test by Microbial after Polymer Floods in Daqing Oilfields
Abstract
In order to further enhance oil recovery of the reservoirs after polymer flooding, two strains of bacterium that could be used on microbial profile modif...
Der skal ikke lades sten på sten tilbage
Der skal ikke lades sten på sten tilbage
The Building by the Barbar TempleClose by the large temple at Barbar 1) lies a little tell, which was investigated in the spring of 1956. The tell was shown to cover a building of ...

