Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

An Acoustic-Mechanical Method Of Re-establishing Communication With Subsea Systems

View through CrossRef
A practical system has been developed for re-establishing guidelines on subsea wells. A commercially available acoustic device is used in conjunction with specifically designed mechanical equipment. Field tests and successful applications are discussed here, as well for using the equipment. Introduction In offshore petroleum operations, it is essential to establish or re-establish physical communication with a subsea system. In relatively shallow water, divers accomplish this task. However, as oil operations move to deeper water and more adverse environments, diving in many instances becomes very difficult. Such conditions have led to the investigation of methods for establishing communication and installing equipment remotely. One typical operation involving the installation of guidelines on suspended exploration wells in the deep waters of the Santa Barbara Channel illustrates the requirements for establishing communication between a vessel and a subsea system. In this paper we shall discuss only the commercially available acoustic instruments and the mechanical equipment designed to install the guidelines. To establish communication between a vessel and a subsea system, whether operation is active or suspended, requires three steps:finding the general area by navigational techniques,finding the exact point of entry, andcompleting the process by point of entry, andcompleting the process by mechanically establishing physical communication. This discussion is limited to the details of Steps 2 and 3; however, an inaccurate navigating system (Step 1) could require long-range acoustic devices (Step 2) that are not commercially available and would have to be built. The design and development of the required mechanical equipment will depend to a certain extent on the acoustic devices available. On the other hand, the job to be done and the hardware needed for the job may indicate a preferable acoustic device. Thus we shall first discuss briefly the over-all system, then describe the available acoustic devices and the mechanical equipment. Finally, we shall discuss in detail the mating of both systems for testing. Re-establishing the Guidelines The guideline re-establishment system consists of a drillstring assembly, lowered from a drilling vessel anchored in the vicinity of the well, and an oceanfloor assembly consisting of a corrosion cap, guide tube, and reflector mounted on the wellhead within the guide structure (Fig. 1). The drillstring assembly contains the acoustic device and all four guidelines to be installed. The vessel is positioned by moving in response to signals from an acoustic device so that the drillstring assembly is directly over the ocean-floor assembly and ready for stabbing. When stabbed, this drillstring assembly will orient mechanically, install all four guidelines, then dog into the ocean-floor assembly so that the reflector, guide tube, and corrosion cap can be removed from the wellhead. Thus, when the string has been pulled and the guideline installation system laid down, the well will be clear and ready for running the blowout preventer and riser. Before any of this can happen, however, the wellhead must be found. JPT P. 1075
Title: An Acoustic-Mechanical Method Of Re-establishing Communication With Subsea Systems
Description:
A practical system has been developed for re-establishing guidelines on subsea wells.
A commercially available acoustic device is used in conjunction with specifically designed mechanical equipment.
Field tests and successful applications are discussed here, as well for using the equipment.
Introduction In offshore petroleum operations, it is essential to establish or re-establish physical communication with a subsea system.
In relatively shallow water, divers accomplish this task.
However, as oil operations move to deeper water and more adverse environments, diving in many instances becomes very difficult.
Such conditions have led to the investigation of methods for establishing communication and installing equipment remotely.
One typical operation involving the installation of guidelines on suspended exploration wells in the deep waters of the Santa Barbara Channel illustrates the requirements for establishing communication between a vessel and a subsea system.
In this paper we shall discuss only the commercially available acoustic instruments and the mechanical equipment designed to install the guidelines.
To establish communication between a vessel and a subsea system, whether operation is active or suspended, requires three steps:finding the general area by navigational techniques,finding the exact point of entry, andcompleting the process by point of entry, andcompleting the process by mechanically establishing physical communication.
This discussion is limited to the details of Steps 2 and 3; however, an inaccurate navigating system (Step 1) could require long-range acoustic devices (Step 2) that are not commercially available and would have to be built.
The design and development of the required mechanical equipment will depend to a certain extent on the acoustic devices available.
On the other hand, the job to be done and the hardware needed for the job may indicate a preferable acoustic device.
Thus we shall first discuss briefly the over-all system, then describe the available acoustic devices and the mechanical equipment.
Finally, we shall discuss in detail the mating of both systems for testing.
Re-establishing the Guidelines The guideline re-establishment system consists of a drillstring assembly, lowered from a drilling vessel anchored in the vicinity of the well, and an oceanfloor assembly consisting of a corrosion cap, guide tube, and reflector mounted on the wellhead within the guide structure (Fig.
1).
The drillstring assembly contains the acoustic device and all four guidelines to be installed.
The vessel is positioned by moving in response to signals from an acoustic device so that the drillstring assembly is directly over the ocean-floor assembly and ready for stabbing.
When stabbed, this drillstring assembly will orient mechanically, install all four guidelines, then dog into the ocean-floor assembly so that the reflector, guide tube, and corrosion cap can be removed from the wellhead.
Thus, when the string has been pulled and the guideline installation system laid down, the well will be clear and ready for running the blowout preventer and riser.
Before any of this can happen, however, the wellhead must be found.
JPT P.
1075.

Related Results

Subsea Factory–Standardization of the Brownfield Factory
Subsea Factory–Standardization of the Brownfield Factory
Abstract As part of the corporate technology strategy Statoil has launched a technology plan for the Subsea Factory concept. The plan describes how to combine subsea...
Ormen Lange Subsea Production System
Ormen Lange Subsea Production System
Abstract This paper presents the concept and the technical solutions developed and applied to the Ormen Lange subsea production system. First, the key technical c...
Persistent Unmanned Surface Vehicles for Subsea Support
Persistent Unmanned Surface Vehicles for Subsea Support
Abstract This paper discusses the role of unmanned systems in subsea support. Recent developments in mobile unmanned vehicle networks are reviewed, demonstrating ...
Subsea Facilities
Subsea Facilities
Abstract This paper presents the system design and concept solutions selected for the Ormen Lange subsea facilities. The field is located in a r...
Subsea Production Controls-The Trend Toward Simplification
Subsea Production Controls-The Trend Toward Simplification
Abstract Control of subsea wellheads has evolved from the earliest diver operated wellheads to systems involving sophisticated electro-hydraulic techniques. With ...
Implementing Deepwater Subsea Reliability Strategy
Implementing Deepwater Subsea Reliability Strategy
Abstract For more than a decade, subsea technology has been perceived as delivering innovative, reliable and cost effective solutions to oil & gas exploitatio...
Design, Installation, And Connection Of Subsea Lines On East Frigg Field
Design, Installation, And Connection Of Subsea Lines On East Frigg Field
ABSTRACT This paper describes the subsea network which interconnects the three subsea templates at EAST FRIGG field, and connects this field to the FRIGG field, 1...
Subsea Separation and Reinjection of Produced Water
Subsea Separation and Reinjection of Produced Water
Abstract Some of the most significant recent development in subsea design has been within subsea processing, in particular the removal of produced water from the ...

Back to Top