Javascript must be enabled to continue!
Maintaining Well Integrity in Underground Gas Storage Wells in China Using a Novel Cementing Technology
View through CrossRef
Abstract
Underground gas storage (UGS) wells have become the natonal strategy for natural gas storage and supply throughout China. PetroChina is building UGS facilities throughout the country, with planned construction extending from 2011 to 2015. The Chongqing gas storage well project in Central China is one of the constructed facilities. Because the life expectancy of gas storage wells is at least 50 years, long-term maintenance of well integrity is one of the major challenges faced during the construction and operations phases of UGS wells. The wells must bear the injection pressures, temperature changes, and frequent cycling of injection during production. With conventional cement, the pressure and temperature change during the injection and production phases can result in cement traction, compression, or microannulus failure. This leads to gas migration through the damaged cement sheath, which means the well will fail its mission as a UGS well.
To maintain well integrity, a novel engineered flexible and expanding cement system has been introduced for UGS cementing in the Chongqing project, whereas past service companies have failed to deliver the fit-for-purpose solution. The optimized mechanical properties of this novel cement allow the cement to remain intact under extreme pressure and temperature changes.
To prove the ability of the selected flexible and expanding cement to withstand the pressure change, logging was conducted at various times during the construction and after the casing pressure test cycle. The logs show excellent results.
Since its implementation, the flexible and expanding cementing system has become the standard solution for China's UGS wells, in which long-term well integrity and sustained casing pressure are required. This paper discusses the challenges for cementing UGS wells, which case histories describe the successful implementation of the FEC solutions.
Title: Maintaining Well Integrity in Underground Gas Storage Wells in China Using a Novel Cementing Technology
Description:
Abstract
Underground gas storage (UGS) wells have become the natonal strategy for natural gas storage and supply throughout China.
PetroChina is building UGS facilities throughout the country, with planned construction extending from 2011 to 2015.
The Chongqing gas storage well project in Central China is one of the constructed facilities.
Because the life expectancy of gas storage wells is at least 50 years, long-term maintenance of well integrity is one of the major challenges faced during the construction and operations phases of UGS wells.
The wells must bear the injection pressures, temperature changes, and frequent cycling of injection during production.
With conventional cement, the pressure and temperature change during the injection and production phases can result in cement traction, compression, or microannulus failure.
This leads to gas migration through the damaged cement sheath, which means the well will fail its mission as a UGS well.
To maintain well integrity, a novel engineered flexible and expanding cement system has been introduced for UGS cementing in the Chongqing project, whereas past service companies have failed to deliver the fit-for-purpose solution.
The optimized mechanical properties of this novel cement allow the cement to remain intact under extreme pressure and temperature changes.
To prove the ability of the selected flexible and expanding cement to withstand the pressure change, logging was conducted at various times during the construction and after the casing pressure test cycle.
The logs show excellent results.
Since its implementation, the flexible and expanding cementing system has become the standard solution for China's UGS wells, in which long-term well integrity and sustained casing pressure are required.
This paper discusses the challenges for cementing UGS wells, which case histories describe the successful implementation of the FEC solutions.
Related Results
Horizontal Drilling and Cementing Technology of The Gas Storage in LiaoHe Oil Region
Horizontal Drilling and Cementing Technology of The Gas Storage in LiaoHe Oil Region
Abstract
According to the requirements of Group Corporation, a gas storage will be built in LiaoHe oilfield. There are two technical challenges for converting underg...
Survey Of Horizontal Gas Well Activity
Survey Of Horizontal Gas Well Activity
Abstract
This paper presents the results of a survey on horizontal gas well activity throughout the world. The survey was conducted for the Gas Research Institute...
Full Offline Well Cementing Implementation Resulting in Significant Time Savings and Improvement in Operational Efficiency
Full Offline Well Cementing Implementation Resulting in Significant Time Savings and Improvement in Operational Efficiency
Abstract
The current global low oil price environment has driven many operators to consider having a quicker and more efficient operations and reduction of the well ...
Performance Experiment of Ultra high Temperature Cementing Slurry System
Performance Experiment of Ultra high Temperature Cementing Slurry System
Abstract
The continuous development of oil and gas exploration and development to deep and ultra deep wells in China, the formation temperature is also getting higher and h...
A Deep Dive on Stage Cementing Operations in Sub-Saharan Africa: A Case Study
A Deep Dive on Stage Cementing Operations in Sub-Saharan Africa: A Case Study
Abstract
Cementing through weak sand and unconsolidated formations are a common occurrence in today's drilling operations. Main challenges include well control, poor...
The Challenges of Underground Hydrogen Gas Storage
The Challenges of Underground Hydrogen Gas Storage
ABSTRACT:
While hydrogen as a gas (H2) has been stored in salt caverns on the American Gulf Coast for the last 40 years, it’s attributes are a challenge for under...
New Integral Neutron-Neutron Logging for Cement Integrity Analysis of any Backfilling
New Integral Neutron-Neutron Logging for Cement Integrity Analysis of any Backfilling
Background: The article presents a new technology of integral neutron-neutron logging technology for cement integrity analysis (hereinafter – NNL-C) of wells in hydrocarbon fields,...
Alternative Entrances: Phillip Noyce and Sydney’s Counterculture
Alternative Entrances: Phillip Noyce and Sydney’s Counterculture
Phillip Noyce is one of Australia’s most prominent film makers—a successful feature film director with both iconic Australian narratives and many a Hollywood blockbuster under his ...

