Snorre B Hull: Design, Fabrication, Erection and Transportation.
View through CrossRef
Abstract
This paper gives a summary of the design basis and requirements of the Norwegian Field Development, Snorre B hull. It describes the fabrication of the hull at the Dragados Offshore yard in Spain, and highlights the critical and important features in the design. It describes the method used, the main elements in the hull and the shape of the final product. The paper includes a description of the fabrication sequence, load out, launching and towing to Norway. Experiences gained during fabrication will be discussed and summarised. A full description of the fabricated sections will be performed and this will be visualised with photos and drawings from the yard.
Description of the Floater
The Snorre B platform is a floating drilling and production unit (SSPV) consisting of a steel hull and deck structure. The hull consists of four "square rounded" columns supporting the deck. The columns are connected in the corners at the ring pontoon, which is rectangular in shape.
The deck structure has two main truss-lines in both the transverse and longitudinal directions. In addition to these trusses, there are also two major transverse bulkheads. Each corner of the deck consists of a "rounded square" box. There is a main deck and a cellar deck including a double bottom structure. Fig. 1 shows the floater, hull and deck.
Fig. 1. Snorre B deck and hull
Design
Most of the design work for Snorre B was initiated in 1998. Key factors accounted for in the structural design basis are:Regulatory requirementsEnvironmental CriteriaSafety ConsiderationsFunctional and Operational Requirements
Design criteria
Snorre B is designed for a 100 years storm condition for the location in the North Sea at a water depth of 350 metres. The extreme significant wave height for the area is 15.5 metres ULS, respectively 18 metres PLS. This is combined with a storm wind of 41 m/s. The design has an allowance as shown below:Margins: Mai 1999 August 2001Company: 3,000 tonnes 1,570 tonnesContractor: 1,850 tonnes 1,170 tonnesThe design life is 20 years. Factors are used for the fatigue life calculations.Outside hull below Splash zone: 2Splash zone: 3Above Splash zone: 1Inside hull: 1 and 2Deck general: 1Critical areas not possible to inspect: 10
The deck shall accommodate both drilling (RAM RIG), production equipment and aluminium living quarters.
Snorre B has 16 anchor lines which combine wire and 145 / 137 mm chain. These are connected to suction anchors.
Regulatory Requirements
Based upon experience gained from more recent platform development in the North Sea, design criteria and rules were established for the structural design.
Det Norske Veritas Rules for Mobile Offshore Units (DNV MOU) including supplementary requirements of Norwegian Petroleum Directorate / Norwegian Maritime Directorate and NORSOK, among other, were used as basis for design.
Title: Snorre B Hull: Design, Fabrication, Erection and Transportation.
Description:
Abstract
This paper gives a summary of the design basis and requirements of the Norwegian Field Development, Snorre B hull.
It describes the fabrication of the hull at the Dragados Offshore yard in Spain, and highlights the critical and important features in the design.
It describes the method used, the main elements in the hull and the shape of the final product.
The paper includes a description of the fabrication sequence, load out, launching and towing to Norway.
Experiences gained during fabrication will be discussed and summarised.
A full description of the fabricated sections will be performed and this will be visualised with photos and drawings from the yard.
Description of the Floater
The Snorre B platform is a floating drilling and production unit (SSPV) consisting of a steel hull and deck structure.
The hull consists of four "square rounded" columns supporting the deck.
The columns are connected in the corners at the ring pontoon, which is rectangular in shape.
The deck structure has two main truss-lines in both the transverse and longitudinal directions.
In addition to these trusses, there are also two major transverse bulkheads.
Each corner of the deck consists of a "rounded square" box.
There is a main deck and a cellar deck including a double bottom structure.
Fig.
1 shows the floater, hull and deck.
Fig.
1.
Snorre B deck and hull
Design
Most of the design work for Snorre B was initiated in 1998.
Key factors accounted for in the structural design basis are:Regulatory requirementsEnvironmental CriteriaSafety ConsiderationsFunctional and Operational Requirements
Design criteria
Snorre B is designed for a 100 years storm condition for the location in the North Sea at a water depth of 350 metres.
The extreme significant wave height for the area is 15.
5 metres ULS, respectively 18 metres PLS.
This is combined with a storm wind of 41 m/s.
The design has an allowance as shown below:Margins: Mai 1999 August 2001Company: 3,000 tonnes 1,570 tonnesContractor: 1,850 tonnes 1,170 tonnesThe design life is 20 years.
Factors are used for the fatigue life calculations.
Outside hull below Splash zone: 2Splash zone: 3Above Splash zone: 1Inside hull: 1 and 2Deck general: 1Critical areas not possible to inspect: 10
The deck shall accommodate both drilling (RAM RIG), production equipment and aluminium living quarters.
Snorre B has 16 anchor lines which combine wire and 145 / 137 mm chain.
These are connected to suction anchors.
Regulatory Requirements
Based upon experience gained from more recent platform development in the North Sea, design criteria and rules were established for the structural design.
Det Norske Veritas Rules for Mobile Offshore Units (DNV MOU) including supplementary requirements of Norwegian Petroleum Directorate / Norwegian Maritime Directorate and NORSOK, among other, were used as basis for design.
Related Results
Structural Aspects Of Snorre Mating
Structural Aspects Of Snorre Mating
ABSTRACT
The deck and the hull of the Snorre TLP were successfully connected South of Stord on the Norwegian westcoast in September 1991. The 28.000 tonnes deck w...
Numerical Study on Resistance of Stepped Planing Hull
Numerical Study on Resistance of Stepped Planing Hull
A stepped planing hull, also known as a step hull, is a hull modification that reduces the wetted surface area. Although this type of hull has proven effective in several ships, it...
Snorre Project Strategies and Status
Snorre Project Strategies and Status
ABSTRACT
The Snorre development is one of the most challenging projects carried out in the Norwegian North Sea since the pioneering days of the early and mid 1970...
Snorre Marine Operations
Snorre Marine Operations
ABSTRACT
The Snorre Marine Operations extended over three offshore seasons and comprised about 100 activities.
This paper summarizes the major m...
INTRODUCTION OF NEW SHAPED SHIP HULL “Y-HULL”
INTRODUCTION OF NEW SHAPED SHIP HULL “Y-HULL”
Y-HULL is the hybrid of Mono-hull and Catamaran which generates reduced wave by the hull and results in low resistance while moving forward, compared to Mono-hull & Catamaran s...
Contemporary Challenges and Solutions for Post-Katrina Gulf of Mexico Spar Design
Contemporary Challenges and Solutions for Post-Katrina Gulf of Mexico Spar Design
Abstract
Deepwater field developments in the Gulf of Mexico typically consider Spar, Tension Leg Platform and Semisubmersible hull forms as potential candidates f...
Snorre Subsea Production System
Snorre Subsea Production System
ABSTRACT
Saga Petroleum will make extensive use of subsea systems to develop the Snorre Field. Of the planned 46 wells needed for the field's first phase developm...