Optimal operation of cascaded hydropower plants in hydro-solar complementary systems considering the risk of unit vibration zone crossing
View through CrossRef
With the undergoing adjustment of the national energy structure of China, developing cascaded hydropower plants in hydro-solar complementary systems becomes an important way to optimize the energy structure. This study focuses on the risk that solar energy disturbances induce large load transfers between hydropower units that can cause hydropower units to frequently cross their vibration zones. Vibration zone crossing can further cause wear of mechanical components of hydropower units. To this end, considering the requirement of avoiding vibration zone crossing, the concept of the vibration zone crossing risk coefficient is introduced and a cascaded hydropower plant optimal operation model considering the risk of vibration zone crossing is proposed. Moreover, this is two-layer algorithm. This layer of algorithms includes improved migration model and migration operator is proposed to solve this mean a cascaded hydropower plant optimal operation model considering the risk of vibration zone crossing. Numerical simulation results based on the data of an actual hydropower plant are used to validate the proposed model and (IBBO-DP) algorithm.
Frontiers Media SA
Title: Optimal operation of cascaded hydropower plants in hydro-solar complementary systems considering the risk of unit vibration zone crossing
Description:
With the undergoing adjustment of the national energy structure of China, developing cascaded hydropower plants in hydro-solar complementary systems becomes an important way to optimize the energy structure.
This study focuses on the risk that solar energy disturbances induce large load transfers between hydropower units that can cause hydropower units to frequently cross their vibration zones.
Vibration zone crossing can further cause wear of mechanical components of hydropower units.
To this end, considering the requirement of avoiding vibration zone crossing, the concept of the vibration zone crossing risk coefficient is introduced and a cascaded hydropower plant optimal operation model considering the risk of vibration zone crossing is proposed.
Moreover, this is two-layer algorithm.
This layer of algorithms includes improved migration model and migration operator is proposed to solve this mean a cascaded hydropower plant optimal operation model considering the risk of vibration zone crossing.
Numerical simulation results based on the data of an actual hydropower plant are used to validate the proposed model and (IBBO-DP) algorithm.
Related Results
Solar Trackers Using Six-Bar Linkages
Solar Trackers Using Six-Bar Linkages
Abstract
A solar panel faces the sun or has the solar ray normal to its face to enhance power reaping. A fixed solar panel can only meet this condition at one moment...
Hydroelectric Power Plants and Their Sustainability
Hydroelectric Power Plants and Their Sustainability
Hydropower is the oldest source of renewable mechanical power and largest source of renewable electricity globally accounting for close to 17% of global electricity generation alth...
Hydropower Dams, Environment and Politics
Hydropower Dams, Environment and Politics
Renewable energy sources are vital to fulfill the high demands of energy in the present world. The common renewable energy sources are wind, hydropower, nuclear and biomass. Howeve...
Research on hydro-photovoltaic complementary analysis of Yangfanggou hydropower station on Yalong River
Research on hydro-photovoltaic complementary analysis of Yangfanggou hydropower station on Yalong River
Hydropower and photovoltaic power are widely used as clean energy sources around the world. Hydro-Photovoltaic complementary is precisely the use of the regulation performance of h...
ANALYSIS OF THE OPERATION MODE OF THE SOLAR POWER PLANT
ANALYSIS OF THE OPERATION MODE OF THE SOLAR POWER PLANT
The article examines the load change schedule of the solar power plant in the Ukraine-Moldova energy union. The analysis of data averaged at minute and 15-minute intervals in the p...
Risk assessment for total dissolved gas supersaturation in the Nepali hydropower sector
Risk assessment for total dissolved gas supersaturation in the Nepali hydropower sector
Abstract
The hydropower sector in Nepal is experiencing rapid growth, even though only a small part of Nepal’s economically feasible hydropower potential has been de...
Short-Term Optimal Operation of a Wind-PV-Hydro Complementary Installation: Yalong River, Sichuan Province, China
Short-Term Optimal Operation of a Wind-PV-Hydro Complementary Installation: Yalong River, Sichuan Province, China
How to effectively use clean renewable energy to improve the capacity of the power grid to absorb new energy and optimize the power grid structure has become one of China’s current...
Short-term optimal coordinated operation of a wind-solar-hydro hybrid system based on deep learning and double-layer nesting solution algorithm
Short-term optimal coordinated operation of a wind-solar-hydro hybrid system based on deep learning and double-layer nesting solution algorithm
Abstract
Due to its randomness, intermittence, and volatility, the high-proportional integration of wind and solar power presents considerable challenges for the traditiona...