Abstract In the past, high-volume water-shutoff treatments have not been applied because of the economic burdens they incur. Today, many operators have reconsidered high-volume water-shutoff treatments because these treatments make oil production from mature reservoirs more economically feasible. Many wells in mature North Sea reservoirs produce a large amount of water. Consequently, these wells often produce less oil than they potentially could. The evolution of diagnostic and interpretation techniques has significantly enhanced the degree of accuracy and completeness of production problem diagnoses. Reservoir models can be used to identify and design effective water-shutoff treatments. This paper describes how a production operation simulator is used with an advanced-processes reservoir simulator to design water-shutoff treatments. The following reservoir simulator options were necessary to design the treatments properly.–thermal options–chemical-injection options–chemical-reaction options–flexible-gridding options The technique was recently used to design water-shutoff treatments and their placement for jobs in the North Sea area. The results of the simulations were used to predict the effects of the following factors.–interval permeability distribution–treatment rate–reaction rates of treatment fluids–resulting gel strength The technique also allows treatments to be designed on the basis of realistic treatment temperatures rather than bottomhole static temperatures. The results of the simulations were used to optimize treatment placement rates, fluid composition, and shut-in times of jobs pumped in the Norwegian sector of the North Sea. One case shows how cooldown inside the reservoir can be used to place a treatment that would have otherwise spontaneously gelled at reservoir temperature. Another case shows how temperature histories for different stages of the treatments were constructed from the simulation results. These temperature histories showed that different activator compositions and/or concentrations were required for early, intermediate and final treatment stages. Introduction Water production can seriously compromise the profitability of oil- or gas-producing wells. The cost of produced-water disposal is becoming a major burden for many operators. Although prevention is usually more effective than treatment, excessive water production is most often treated rather than prevented. The keys to the success of shutting off or preventing excessive water are:–proper identification of the water-production mechanism–appropriate design of the treatment–effective placement of the treatment Steps of Typical Water-Shutoff Treatment Figure 1 illustrates the process of a typical water-shutoff (or conformance) treatment. Each step of the process will now be discussed. P. 611^
Title: Improvements in the Design of Water Shutoff Treatments
Description:
Abstract In the past, high-volume water-shutoff treatments have not been applied because of the economic burdens they incur.
Today, many operators have reconsidered high-volume water-shutoff treatments because these treatments make oil production from mature reservoirs more economically feasible.
Many wells in mature North Sea reservoirs produce a large amount of water.
Consequently, these wells often produce less oil than they potentially could.
The evolution of diagnostic and interpretation techniques has significantly enhanced the degree of accuracy and completeness of production problem diagnoses.
Reservoir models can be used to identify and design effective water-shutoff treatments.
This paper describes how a production operation simulator is used with an advanced-processes reservoir simulator to design water-shutoff treatments.
The following reservoir simulator options were necessary to design the treatments properly.
–thermal options–chemical-injection options–chemical-reaction options–flexible-gridding options The technique was recently used to design water-shutoff treatments and their placement for jobs in the North Sea area.
The results of the simulations were used to predict the effects of the following factors.
–interval permeability distribution–treatment rate–reaction rates of treatment fluids–resulting gel strength The technique also allows treatments to be designed on the basis of realistic treatment temperatures rather than bottomhole static temperatures.
The results of the simulations were used to optimize treatment placement rates, fluid composition, and shut-in times of jobs pumped in the Norwegian sector of the North Sea.
One case shows how cooldown inside the reservoir can be used to place a treatment that would have otherwise spontaneously gelled at reservoir temperature.
Another case shows how temperature histories for different stages of the treatments were constructed from the simulation results.
These temperature histories showed that different activator compositions and/or concentrations were required for early, intermediate and final treatment stages.
Introduction Water production can seriously compromise the profitability of oil- or gas-producing wells.
The cost of produced-water disposal is becoming a major burden for many operators.
Although prevention is usually more effective than treatment, excessive water production is most often treated rather than prevented.
The keys to the success of shutting off or preventing excessive water are:–proper identification of the water-production mechanism–appropriate design of the treatment–effective placement of the treatment Steps of Typical Water-Shutoff Treatment Figure 1 illustrates the process of a typical water-shutoff (or conformance) treatment.
Each step of the process will now be discussed.
P.
611^.

Related Results

Study and Application of Gelled Foam for In-Depth Water Shutoff in a Fractured Oil Reservoir
Study and Application of Gelled Foam for In-Depth Water Shutoff in a Fractured Oil Reservoir
Abstract A gelled foam is comprised of water, a foaming agent (surfactant), a foaming stabilizer (polymer) and a cross-linking agent. This system with gel as the ...
Housing Improvements for Health and Associated Socio‐Economic Outcomes: A Systematic Review
Housing Improvements for Health and Associated Socio‐Economic Outcomes: A Systematic Review
Poor housing is associated with poor health. This suggests that improving housing conditions might lead to improved health for residents. This review searched widely for studies fr...
Performance Prediction of Gel Water Shutoff in Horizontal Wells Using a Newly Coupled Reservoir–Wellbore Model
Performance Prediction of Gel Water Shutoff in Horizontal Wells Using a Newly Coupled Reservoir–Wellbore Model
Water shutoff is a commonly used method to mitigate the early breakthrough in horizontal wells. Gel is frequently used as an effective water shutoff agent in mature fields, especia...
Design
Design
Conventional definitions of design rarely capture its reach into our everyday lives. The Design Council, for example, estimates that more than 2.5 million people use design-related...
Application of a New Integrated Technique for Servo Adjustable Water Detection and Water Shuto ff in Sudan Oilfield
Application of a New Integrated Technique for Servo Adjustable Water Detection and Water Shuto ff in Sudan Oilfield
Abstract The Block 3/7 of Sudan Oilfield has been in the period of high water production. The water cut of many wells is more than 80%, and still rising. Besides, th...
History and Actuality of Separate Layer Oil Production Technologies in Daqing Oilfield
History and Actuality of Separate Layer Oil Production Technologies in Daqing Oilfield
Abstract Separate layer oil production technologies in Daqing Oilfield were developed and improved continually with the course of the oilfield development. The techn...
Overview of Water Shutoff Operations in Oil and Gas Wells; Chemical and Mechanical Solutions
Overview of Water Shutoff Operations in Oil and Gas Wells; Chemical and Mechanical Solutions
This paper provides an integrated overview of the water shutoff operations, starting from the causes to the solutions. The paper begins with explaining the benefits of eliminating ...