Benguela-Belize Project Overview

View through CrossRef
Abstract The Benguela-Belize Project, an oil and gas production development located in the northern part of Block 14, offshore Angola, West Africa, is the first application of compliant piled tower (CPT) technology for a drilling and production platform outside the Gulf of Mexico. The drilling and production platform (DPP) serves as a production hub for the Benguela, Belize, Lobito and Tomboco (BBLT) oil fields and is located in 390 m (1,280 feet) of water 70 km (45 miles) offshore Cabinda, Angola. Cabinda Gulf Oil Company (CABGOC), a wholly owned subsidiary of Chevron Corporation, is the block operator on behalf of the partner group consisting of CABGOC, Sonangol P&P, TOTAL, ENI and GALP. This paper presents the alternative analysis process, challenges and lessons learned in selecting the optimum development concept where a wide range of feasible technical solutions were applicable. Key factors included: 300-600 m (1,000 to 2,000-foot) water depth, surface or subsea wellheads could be used, shallow reservoir depths, proximity of existing infrastructure for oil storage and export and additional prospects identified within subsea tieback distance to the production hub. Other factors that influenced the development alternatives included: low reservoir pressure requiring 1 to 1 water injection to withdrawal ratio; shallow reservoir depths spread over a large area; crude oil gravity variations requiring the assessment of processing 24 ° API and 38 ° API crude oils; crude oil storage and export options via floating systems or via pipelines and produced gas management. A deliberate strategy to use existing oil and gas facilities in both Block 14 and Block 0 for the BBLT hub production export was pursued to minimize the overall capital invested and future operating costs. The final development solution, the compliant piled tower, was an outcome of the development concept selection process and provided the opportunity to apply innovative technology to West Africa. Introduction Since the mid-1990s the deepwater region offshore Angola has proved to be a world-class oil province. Exploration success has been followed rapidly by the development of a number of new fields. The growth in production from the deepwater is forecast to take Angola,s production over 1.5 million barrels of oil per day (MMBOPD) by 2006 and 2.5MMBOPD by 2010. Deepwater Block 14 is located offshore from the Cabinda Province west of the Chevron operated Block 0 (Figure 1). Block 14 is 4,025 km2 (1,554 mi2) in size and has water depths ranging from 200 m (660 ft) in the northeast to 2,000 m (6,600 ft) in the Congo Canyon that traverses the southern portion of the Block. So far, Chevron and the Block 14 Contractor Group (Sonangol P&P, TOTAL, ENI and GALP) have made ten discoveries in the highly prospective Block 14 on behalf of the Block Concessionaire, Sonangol E&P, including: Kuito (1997), Benguela and Belize (1998), and Tomboco and Lobito (2000)(Figure 2).
Title: Benguela-Belize Project Overview
Description:
Abstract The Benguela-Belize Project, an oil and gas production development located in the northern part of Block 14, offshore Angola, West Africa, is the first application of compliant piled tower (CPT) technology for a drilling and production platform outside the Gulf of Mexico.
The drilling and production platform (DPP) serves as a production hub for the Benguela, Belize, Lobito and Tomboco (BBLT) oil fields and is located in 390 m (1,280 feet) of water 70 km (45 miles) offshore Cabinda, Angola.
Cabinda Gulf Oil Company (CABGOC), a wholly owned subsidiary of Chevron Corporation, is the block operator on behalf of the partner group consisting of CABGOC, Sonangol P&P, TOTAL, ENI and GALP.
This paper presents the alternative analysis process, challenges and lessons learned in selecting the optimum development concept where a wide range of feasible technical solutions were applicable.
Key factors included: 300-600 m (1,000 to 2,000-foot) water depth, surface or subsea wellheads could be used, shallow reservoir depths, proximity of existing infrastructure for oil storage and export and additional prospects identified within subsea tieback distance to the production hub.
Other factors that influenced the development alternatives included: low reservoir pressure requiring 1 to 1 water injection to withdrawal ratio; shallow reservoir depths spread over a large area; crude oil gravity variations requiring the assessment of processing 24 ° API and 38 ° API crude oils; crude oil storage and export options via floating systems or via pipelines and produced gas management.
A deliberate strategy to use existing oil and gas facilities in both Block 14 and Block 0 for the BBLT hub production export was pursued to minimize the overall capital invested and future operating costs.
The final development solution, the compliant piled tower, was an outcome of the development concept selection process and provided the opportunity to apply innovative technology to West Africa.
Introduction Since the mid-1990s the deepwater region offshore Angola has proved to be a world-class oil province.
Exploration success has been followed rapidly by the development of a number of new fields.
The growth in production from the deepwater is forecast to take Angola,s production over 1.
5 million barrels of oil per day (MMBOPD) by 2006 and 2.
5MMBOPD by 2010.
Deepwater Block 14 is located offshore from the Cabinda Province west of the Chevron operated Block 0 (Figure 1).
Block 14 is 4,025 km2 (1,554 mi2) in size and has water depths ranging from 200 m (660 ft) in the northeast to 2,000 m (6,600 ft) in the Congo Canyon that traverses the southern portion of the Block.
So far, Chevron and the Block 14 Contractor Group (Sonangol P&P, TOTAL, ENI and GALP) have made ten discoveries in the highly prospective Block 14 on behalf of the Block Concessionaire, Sonangol E&P, including: Kuito (1997), Benguela and Belize (1998), and Tomboco and Lobito (2000)(Figure 2).

Related Results

Benguela-Belize Compliant Piled Tower: Tower Design
Benguela-Belize Compliant Piled Tower: Tower Design
Abstract The compliant tower is a proven bottom-founded platform which has been used successfully for three developments in the Gulf of Mexico. The compliant towe...
Project-Focused Approach Facilitates Benguela-Belize Success
Project-Focused Approach Facilitates Benguela-Belize Success
Abstract From the outset of the Benguela-Belize Compliant Piled Tower project, the Gulf Marine Fabricators (GMF) management team established a target of finding a...
Geochemical sourcing of granite ground stone tools from Belize
Geochemical sourcing of granite ground stone tools from Belize
<p>Portable X-ray fluorescence (pXRF) provides a new alternative to destructive methods of raw material characterization, such as X-ray fluorescence (XRF), neutron activation...
Belize Pension System
Belize Pension System
The primary goal of a pension system should be to provide adequate, affordable, sustainable, and robust retirement income. Belize, like many other countries in the Caribbean, faces...
Assessing the Viability of Arundo donax as a Potential Source of Green Energy for Electricity Cogeneration in Belize
Assessing the Viability of Arundo donax as a Potential Source of Green Energy for Electricity Cogeneration in Belize
Wild Cane (Arundo donax) is a perennial rhizomatous grass that is native to tropical and sub-tropical zones. This C3 crop is known to have significant potential to produce commerci...
Response of the Benguela upwelling system to four decades of global warming
Response of the Benguela upwelling system to four decades of global warming
The Benguela upwelling system (BUS) is one of the most productive marine systems in the world oceans, with about 50 times the productivity per unit area compared to the global ocea...
Gaspar, Dona Florinda Josefa
Gaspar, Dona Florinda Josefa
Abstract Dona Florinda Josefa Gaspar (c. 1791–1862) was a prosperous trader born in Benguela, Angola in the late eighteenth century. The daughter of a local ruler...