Sand Production Management
View through CrossRef
Abstract
Sand production may be inevitable in many fields that have a relatively lower formation strength. Sand erosion and settling predictions and sand monitoring are important elements of any effective sand production management strategy. Sand erosion predictions are used to establish tolerable sand production rates and (thus) well productivity, and to develop cost-effective inspection frequency for critical components. Prediction of critical flow rate to prevent sand settling is important for flowlines that are not designed for pigging. Quantitative sand monitoring is essential in verifying the effectiveness of sand control procedures and in generating an important input parameter for erosion and sand settling predictions. This paper presents equations for predicting sand erosion rate and sand settling flow rate, and assesses the accuracy of these equations. In addition, the paper presents an assessment of the sensitivity of commercially available non-intrusive acoustic and intrusive electrical resistance sand monitors.
Introduction
Sand production may be inevitable in many fields that have a relatively lower formation strength (< I000 psi). If sand production is expected at the early life of the field, it will be prevented by installation of downhole sand exclusion systems such as gravel packs and screens. However, as would be the case for many reservoirs, wells will not produce sand when they are first brought to production, but they will produce sand at some later point in their lives. In such a case, the operator has three options: I) complete the wells with downhole sand exclusion systems from day one, 2) re-complete the well by installing sand exclusion systems at a later date when sand production begins, or 3) do not install downhole sand exclusion systems and manage sand production by designing the facilities to handle sand if sand is produced. The last option, sand production management, is preferred in many cases because downhole sand exclusion systems can increase the risk of loss of production or even the complete well by plugging and mechanical damage.
There are three technical issues that are critical to sand production management that need to be addressed in order to maximize reservoir production while maintaining the integrity of the production facility. These are: sand erosion, sand settling, and sand monitoring. Sand erosion prediction models are necessary to establish tolerable sand production rates and to determine inspection strategy for the production facility. This will allow establishing the optimum production rate while maintaining acceptable equipment integrity and safety levels. The second technical issue which is of paramount importance in sizing and operations of infield flowlines and pipelines is sand settling. In situations where sand settling cannot be avoided and routine pigging is not feasible, which may be the case for flowlines connecting subsea wells and unmanned platforms, assessing corrosion under sand beds is an important consideration. All analyses addressing the effect of sand on reservoir management and equipment integrity require quantifying sand production rates which may be feasible using sand monitors. This paper will review sand erosion and settling prediction models and present an assessment of the quantitative accuracy of commercially available sand monitors.
Title: Sand Production Management
Description:
Abstract
Sand production may be inevitable in many fields that have a relatively lower formation strength.
Sand erosion and settling predictions and sand monitoring are important elements of any effective sand production management strategy.
Sand erosion predictions are used to establish tolerable sand production rates and (thus) well productivity, and to develop cost-effective inspection frequency for critical components.
Prediction of critical flow rate to prevent sand settling is important for flowlines that are not designed for pigging.
Quantitative sand monitoring is essential in verifying the effectiveness of sand control procedures and in generating an important input parameter for erosion and sand settling predictions.
This paper presents equations for predicting sand erosion rate and sand settling flow rate, and assesses the accuracy of these equations.
In addition, the paper presents an assessment of the sensitivity of commercially available non-intrusive acoustic and intrusive electrical resistance sand monitors.
Introduction
Sand production may be inevitable in many fields that have a relatively lower formation strength (< I000 psi).
If sand production is expected at the early life of the field, it will be prevented by installation of downhole sand exclusion systems such as gravel packs and screens.
However, as would be the case for many reservoirs, wells will not produce sand when they are first brought to production, but they will produce sand at some later point in their lives.
In such a case, the operator has three options: I) complete the wells with downhole sand exclusion systems from day one, 2) re-complete the well by installing sand exclusion systems at a later date when sand production begins, or 3) do not install downhole sand exclusion systems and manage sand production by designing the facilities to handle sand if sand is produced.
The last option, sand production management, is preferred in many cases because downhole sand exclusion systems can increase the risk of loss of production or even the complete well by plugging and mechanical damage.
There are three technical issues that are critical to sand production management that need to be addressed in order to maximize reservoir production while maintaining the integrity of the production facility.
These are: sand erosion, sand settling, and sand monitoring.
Sand erosion prediction models are necessary to establish tolerable sand production rates and to determine inspection strategy for the production facility.
This will allow establishing the optimum production rate while maintaining acceptable equipment integrity and safety levels.
The second technical issue which is of paramount importance in sizing and operations of infield flowlines and pipelines is sand settling.
In situations where sand settling cannot be avoided and routine pigging is not feasible, which may be the case for flowlines connecting subsea wells and unmanned platforms, assessing corrosion under sand beds is an important consideration.
All analyses addressing the effect of sand on reservoir management and equipment integrity require quantifying sand production rates which may be feasible using sand monitors.
This paper will review sand erosion and settling prediction models and present an assessment of the quantitative accuracy of commercially available sand monitors.
Related Results
A Sand Failure Test Can Cut Both Completion Costs And The Number Of Developement Wells
A Sand Failure Test Can Cut Both Completion Costs And The Number Of Developement Wells
Abstract
The objective of this Sand Failure Test was to determine whether initial sand control is necessary on a poorly consolidated gas field, or whether it can ...
Evaluating the Sand-Trapping Efficiency of Sand Fences Using a Combination of Wind-Blown Sand Measurements and UAV Photogrammetry at Tottori Sand Dunes, Japan
Evaluating the Sand-Trapping Efficiency of Sand Fences Using a Combination of Wind-Blown Sand Measurements and UAV Photogrammetry at Tottori Sand Dunes, Japan
Fences are commonly used in coastal regions to control wind-blown sand. Sand-trapping fences and sand-stabilizing fences have been installed at the Tottori Sand Dunes, Tottori Pref...
Chemical Sand Consolidation and Through-Tubing Gravel Pack, the Effective Alternative Sand Control Methods in Zawtika Field
Chemical Sand Consolidation and Through-Tubing Gravel Pack, the Effective Alternative Sand Control Methods in Zawtika Field
Abstract
Sand production has been highlighted as one of the critical challenges for Zawtika Project. Throughout the years of field experiences, sand production manag...
Sand Monitoring in Gas Wells: Enhanced Methodology of Sand Sampling via Combination of Online Sand Sampler and Acoustic Sand Monitors to Determine Max Sand Free Rates for Identification of Quick Gain Opportunities and to Quantify Sand Production
Sand Monitoring in Gas Wells: Enhanced Methodology of Sand Sampling via Combination of Online Sand Sampler and Acoustic Sand Monitors to Determine Max Sand Free Rates for Identification of Quick Gain Opportunities and to Quantify Sand Production
Abstract
Sand production from wells are one of the operators’ biggest nightmare as the cascading effect can cause some major harm to the surface equipment as well as...
Sand Control Techniques in Shengli Oilfield
Sand Control Techniques in Shengli Oilfield
ABSTRACT
Shengli Oilfield has been developed for more than twenty years. The problem of sand production has existed since its development. About one third of the tot...
A comprehensive review of cased hole sand control optimization techniques: Theoretical and practical perspectives
A comprehensive review of cased hole sand control optimization techniques: Theoretical and practical perspectives
Cased hole sand control is a critical aspect of oil and gas well management, ensuring efficient production by mitigating sand production issues. This review presents a comprehensiv...
Flow Assurance Aspects of Intrusive Erosion Probes
Flow Assurance Aspects of Intrusive Erosion Probes
Abstract
Sand erosion in subsea components and pipelines can cause serious design and production problems. Erosion is a complex process that is affected by numero...
Field Implications from Full-Scale Sand Production Experiments
Field Implications from Full-Scale Sand Production Experiments
Abstract
During 1992 and 1993, Shell (SIEP), British Petroleum (Sunbury), Elf Aquitaine and Schlumberger Perforating & Testing performed multiple-shot experim...