Successful Float Over Installation by Portable DP Vessel

View through CrossRef
ABSTRACT Float over topside installation has become a cost effective alternative for offshore construction over the past 25-30 years, as ever-increasing integrated topside weight constantly exceeds the lifting capacity of installation vessel cranes. The basic concept of float over installation is to transport the topside on a vessel in one piece, position the vessel over the substructure, and lower the topside onto the substructure while maintaining the position of the vessel. While this basic principle of loadout and transportation remains the same, methods and systems used to execute the concept vary significantly, and pose numerous technical and operational challenges. PETRONAS Carigali Sdn. Bhd. (PCSB) undertook the development of BARDEGG-2 and Baronia EOR project located offshore Sarawak, Malaysia within South China Sea. Baronia B Central Processing Platform (BNCPP-B) was installed in May 2017 and was the first PCSB's float over installation by a portable Dynamic Positioning 2 (DP2) vessel. A Deck Transportation Vessel (DTV) was upgraded with DP2 capability by adding two portable azimuth thrusters to allow safe and efficient installation of the topside. Sea trials and annual DP trials were conducted in ensuring DP functionality and performance in compliance to Class requirement. Float over engineering was performed including float over design criteria, hydrodynamic analysis and mating analysis. All outfitting, secondary steel works and grillage structures were installed on the vessel before mobilization for transportation and installation of BNCPP-B Topside. The operation required high precision engineering and execution considering the close proximity between BNCPP-B Topside and existing BNQ-B platform during the vessel approach towards BNCPP-B Jacket. Additional control measures were taken for safe execution. DP checks were conducted at certain intervals while approaching the jacket. BNCPP-B Topside installation commenced at first daylight on 22 May 2017 and successfully completed by noon. It has again proven that float over installation by portable DP2 vessel was technically feasible and would be an example for future projects undertaking the same approach. Having a vessel with portable DP2 system will help to optimize the vessel utilization and improve overall project cost. This paper aims to highlight the float over methodology for BNCPP-B topside using portable DP2 vessel and the technical challenges for offshore execution. The activities during the float over operation, analysis and simulation methods are also presented in this document. This paper should be an interest to those who will perform the offshore installation via float over method utilizing Portable DP Vessel.
Title: Successful Float Over Installation by Portable DP Vessel
Description:
ABSTRACT Float over topside installation has become a cost effective alternative for offshore construction over the past 25-30 years, as ever-increasing integrated topside weight constantly exceeds the lifting capacity of installation vessel cranes.
The basic concept of float over installation is to transport the topside on a vessel in one piece, position the vessel over the substructure, and lower the topside onto the substructure while maintaining the position of the vessel.
While this basic principle of loadout and transportation remains the same, methods and systems used to execute the concept vary significantly, and pose numerous technical and operational challenges.
PETRONAS Carigali Sdn.
Bhd.
(PCSB) undertook the development of BARDEGG-2 and Baronia EOR project located offshore Sarawak, Malaysia within South China Sea.
Baronia B Central Processing Platform (BNCPP-B) was installed in May 2017 and was the first PCSB's float over installation by a portable Dynamic Positioning 2 (DP2) vessel.
A Deck Transportation Vessel (DTV) was upgraded with DP2 capability by adding two portable azimuth thrusters to allow safe and efficient installation of the topside.
Sea trials and annual DP trials were conducted in ensuring DP functionality and performance in compliance to Class requirement.
Float over engineering was performed including float over design criteria, hydrodynamic analysis and mating analysis.
All outfitting, secondary steel works and grillage structures were installed on the vessel before mobilization for transportation and installation of BNCPP-B Topside.
The operation required high precision engineering and execution considering the close proximity between BNCPP-B Topside and existing BNQ-B platform during the vessel approach towards BNCPP-B Jacket.
Additional control measures were taken for safe execution.
DP checks were conducted at certain intervals while approaching the jacket.
BNCPP-B Topside installation commenced at first daylight on 22 May 2017 and successfully completed by noon.
It has again proven that float over installation by portable DP2 vessel was technically feasible and would be an example for future projects undertaking the same approach.
Having a vessel with portable DP2 system will help to optimize the vessel utilization and improve overall project cost.
This paper aims to highlight the float over methodology for BNCPP-B topside using portable DP2 vessel and the technical challenges for offshore execution.
The activities during the float over operation, analysis and simulation methods are also presented in this document.
This paper should be an interest to those who will perform the offshore installation via float over method utilizing Portable DP Vessel.

Related Results

SS: Spar Technology- Developments in Deepwater spar installation
SS: Spar Technology- Developments in Deepwater spar installation
Abstract During the last seven years Heerema Marine Contractors (HMC) has installed more than half of all Spars in the deep waters of the Gulf of Mexico. The dual...
DESAIN STRUKTUR FLOAT PESAWAT AMFIBI
DESAIN STRUKTUR FLOAT PESAWAT AMFIBI
Lembaga Penerbangan dan Antariksa Nasional (LAPAN) berkerja sama dengan PT Dirgantara Indonesia (PT DI) berupaya mengembangkan pesawat N219 menjadi pesawat amfibi. Pengembangan ter...
Anteo : the Float-over giant
Anteo : the Float-over giant
Abstract Anteo is a "giant" hydraulic system providing one of the most reliable and cost-effective solution to the market demand of Integrated Deck installation b...
Offshore WTG Monopile Installation – Crane Vessel Preparation
Offshore WTG Monopile Installation – Crane Vessel Preparation
Abstract Oil and Gas EPC contractors in the Middle East are gradually transitioning into the Wind farm development projects in Far East Asia and Europe. NPCC, one of...
Debottlenecking of The Machar Slug Catcher
Debottlenecking of The Machar Slug Catcher
Abstract The BP Machar slug catcher is a combined three phase separator and slug catcher located at the ETAP platform in the British sector of the North Sea. With...
Float-Over Installation Analysis of Semisubmersible Production Platform Topside
Float-Over Installation Analysis of Semisubmersible Production Platform Topside
Compared with split lifting by floating crane, the float-over is less time-consuming and has larger lifting capacity, especially suitable for large and medium sized offshore platfo...
Comparing weight method and float method for pressurised metered dose inhaler as dose counting method.
Comparing weight method and float method for pressurised metered dose inhaler as dose counting method.
Abstract INTRODUCTION Pressurised metered-dose inhalers (pMDIs) are not equipped with dose counters, so estimating the actuation remaining is difficult. We compared weight...
[RETRACTED] ChilWell Portable AC “Portable AC Cooler” Reviews v1
[RETRACTED] ChilWell Portable AC “Portable AC Cooler” Reviews v1
[RETRACTED]Is it safe to say that you are searching for inexpensively compact air cooling arrangement? Indeed, the late spring season is at its pinnacle and there is tremendous int...

Back to Top