Un-Locking Subsea Reserves Through a System-Based Approach for Tie-Back Solutions
View through CrossRef
Abstract
Offshore developments must evolve if the industry is to unlock subsea reserves and increase recovery. A novel method of achieving these goals is through use of a systematic approach to subsea tiebacks that combines new technologies with minor modifications to the existing topsides equipment.
The tieback strategy is a system-based approach with a combination of qualified disruptive technologies and field-proven solutions that will improve costs, reduce the number of interfaces, minimize the modifications needed on the topsides, critical for platforms with space and weight limitations, and maximize the use of existing assets. Significant investment was made to qualify disruptive and groundbreaking technologies to make this possible. The following summarizes the main components of the subsea system: –Seabox subsea water treatment and injection provides higher quality water for reservoir injection and increased recovery–Subsea chemical storage that allows longer subsea tiebacks and mitigates weight and space limitations on topside structures; only power and communication are needed from the topside–Subsea treatment of produced water subsea for either discharge directly to sea or to re-inject–Subsea automatic pig launcher combined with a single pipeline that ensures continuous flow at a lower capex–All-electric controls and valves eliminate the need for utility pipelines and expensive umbilicals–Applying field-proven tie-in systems integrated with flexible pipe solutions and customized subsea structures
In addition to exploring the above components, this paper also explores combining the components into a comprehensive system. The system-based approach will unlock previously uneconomical reservoirs.
Title: Un-Locking Subsea Reserves Through a System-Based Approach for Tie-Back Solutions
Description:
Abstract
Offshore developments must evolve if the industry is to unlock subsea reserves and increase recovery.
A novel method of achieving these goals is through use of a systematic approach to subsea tiebacks that combines new technologies with minor modifications to the existing topsides equipment.
The tieback strategy is a system-based approach with a combination of qualified disruptive technologies and field-proven solutions that will improve costs, reduce the number of interfaces, minimize the modifications needed on the topsides, critical for platforms with space and weight limitations, and maximize the use of existing assets.
Significant investment was made to qualify disruptive and groundbreaking technologies to make this possible.
The following summarizes the main components of the subsea system: –Seabox subsea water treatment and injection provides higher quality water for reservoir injection and increased recovery–Subsea chemical storage that allows longer subsea tiebacks and mitigates weight and space limitations on topside structures; only power and communication are needed from the topside–Subsea treatment of produced water subsea for either discharge directly to sea or to re-inject–Subsea automatic pig launcher combined with a single pipeline that ensures continuous flow at a lower capex–All-electric controls and valves eliminate the need for utility pipelines and expensive umbilicals–Applying field-proven tie-in systems integrated with flexible pipe solutions and customized subsea structures
In addition to exploring the above components, this paper also explores combining the components into a comprehensive system.
The system-based approach will unlock previously uneconomical reservoirs.
Related Results
Subsea Factory–Standardization of the Brownfield Factory
Subsea Factory–Standardization of the Brownfield Factory
Abstract
As part of the corporate technology strategy Statoil has launched a technology plan for the Subsea Factory concept. The plan describes how to combine subsea...
Ormen Lange Subsea Production System
Ormen Lange Subsea Production System
Abstract
This paper presents the concept and the technical solutions developed and applied to the Ormen Lange subsea production system. First, the key technical c...
Subsea Facilities
Subsea Facilities
Abstract
This paper presents the system design and concept solutions selected for the Ormen Lange subsea facilities.
The field is located in a r...
Probabilistic Reserves Estimation of Mara West Field, Maracaibo Basin, Venezuela: Case Study
Probabilistic Reserves Estimation of Mara West Field, Maracaibo Basin, Venezuela: Case Study
Abstract
Mara west field located onshore Lake Maracaibo in Western Venezuela, was discovered in 1951 by well DM-115. Other wells drilled afterwards showed rather ...
Subsea Separation and Reinjection of Produced Water
Subsea Separation and Reinjection of Produced Water
Abstract
Some of the most significant recent development in subsea design has been within subsea processing, in particular the removal of produced water from the ...
Design, Installation, And Connection Of Subsea Lines On East Frigg Field
Design, Installation, And Connection Of Subsea Lines On East Frigg Field
ABSTRACT
This paper describes the subsea network which interconnects the three subsea templates at EAST FRIGG field, and connects this field to the FRIGG field, 1...
A New Approach to Subsea Intervention
A New Approach to Subsea Intervention
ABSTRACT
In March 1987 representatives of Statoil and the Asea Brown Boveri Group could witness the completion of a successful sea test of a new subsea interventi...
Subsea Production Controls-The Trend Toward Simplification
Subsea Production Controls-The Trend Toward Simplification
Abstract
Control of subsea wellheads has evolved from the earliest diver operated wellheads to systems involving sophisticated electro-hydraulic techniques. With ...