Development of a new simplified algorithm facilitating GIS-based preliminary planning of small hydropower plants

View through CrossRef
With the increasing promotion of renewable energy sources, hydropower is expected to play a crucial role in energy storage and grid balancing, supplementing intermittent solar and wind power. However, the complex topography and variability of design parameters often lead to underutilization of small hydropower potential or sub-optimal designs. This study presents a new simplified algorithm for GIS-based positioning optimization and preliminary planning of small hydropower plants.The practical problem addressed with this algorithm is that during the preliminary design phase of a small run-of-river hydropower plant, the designers are required to preselect, along a given river, the water intake point, the location of the power generation station, and the tailrace discharge point back to the river, as well as the conduit route between the intake and the station. The latter is quite complex, as it may consist of a section of open channel and the remaining section of closed conduit (penstock). The open channel is significantly cheaper than the penstock, but it needs to practically follow the contour line of the intake on suitable ground. The penstock does not have problems with steep slopes, but it is generally much more expensive per unit length than the open channel, especially if it is made of steel. At the same time, during the routing process, areas where pipelines are not allowed to pass must be excluded, e.g., natural reserve areas, or residential areas, or areas with intense geological phenomena. Simultaneously, the expected electricity production and the cost for each candidate design should be considered, in order to examine the technical and economic viability of the project.Developed in Python within the QGIS environment, which is an open but well-established geographical information system software package, the algorithm operates in raster format and uses as input the digital terrain model, the flow direction and flow accumulation grids, the examined river reaches in raster format, characteristic discharge rate for each cell of the examined river, the open channel and the penstock cost per unit length in raster format. Areas where pipelines are not allowed to pass are designated with a very high unit length cost.After reading the input data and initializing the required output raster data objects, the algorithm creates the lefthand and righthand contour lines for each upstream cell. Then it iterates between all the possible downstream cells for this upstream cell. For each upstream-downstream positions couple it iterates through all the possible combinations of open channel and penstock and creates a list with the combinations having the lower cost. For each optimal solution it stores all the characteristics in a list. After finalizing all the searches the algorithm sorts the list with the optimal solutions considering the produced energy/cost ratio.While such algorithms typically exhibit O(n³) complexity, meaning that as the size of the area increases the computation time will become prohibiting, a key characteristic of the proposed algorithm is that includes novel search functions minimising the searched cells and required repetitions making the execution time reasonable in larger areas.
Title: Development of a new simplified algorithm facilitating GIS-based preliminary planning of small hydropower plants
Description:
With the increasing promotion of renewable energy sources, hydropower is expected to play a crucial role in energy storage and grid balancing, supplementing intermittent solar and wind power.
However, the complex topography and variability of design parameters often lead to underutilization of small hydropower potential or sub-optimal designs.
This study presents a new simplified algorithm for GIS-based positioning optimization and preliminary planning of small hydropower plants.
The practical problem addressed with this algorithm is that during the preliminary design phase of a small run-of-river hydropower plant, the designers are required to preselect, along a given river, the water intake point, the location of the power generation station, and the tailrace discharge point back to the river, as well as the conduit route between the intake and the station.
The latter is quite complex, as it may consist of a section of open channel and the remaining section of closed conduit (penstock).
The open channel is significantly cheaper than the penstock, but it needs to practically follow the contour line of the intake on suitable ground.
The penstock does not have problems with steep slopes, but it is generally much more expensive per unit length than the open channel, especially if it is made of steel.
At the same time, during the routing process, areas where pipelines are not allowed to pass must be excluded, e.
g.
, natural reserve areas, or residential areas, or areas with intense geological phenomena.
Simultaneously, the expected electricity production and the cost for each candidate design should be considered, in order to examine the technical and economic viability of the project.
Developed in Python within the QGIS environment, which is an open but well-established geographical information system software package, the algorithm operates in raster format and uses as input the digital terrain model, the flow direction and flow accumulation grids, the examined river reaches in raster format, characteristic discharge rate for each cell of the examined river, the open channel and the penstock cost per unit length in raster format.
Areas where pipelines are not allowed to pass are designated with a very high unit length cost.
After reading the input data and initializing the required output raster data objects, the algorithm creates the lefthand and righthand contour lines for each upstream cell.
Then it iterates between all the possible downstream cells for this upstream cell.
For each upstream-downstream positions couple it iterates through all the possible combinations of open channel and penstock and creates a list with the combinations having the lower cost.
For each optimal solution it stores all the characteristics in a list.
After finalizing all the searches the algorithm sorts the list with the optimal solutions considering the produced energy/cost ratio.
While such algorithms typically exhibit O(n³) complexity, meaning that as the size of the area increases the computation time will become prohibiting, a key characteristic of the proposed algorithm is that includes novel search functions minimising the searched cells and required repetitions making the execution time reasonable in larger areas.

Related Results

Hydropower Dams, Environment and Politics
Hydropower Dams, Environment and Politics
Renewable energy sources are vital to fulfill the high demands of energy in the present world. The common renewable energy sources are wind, hydropower, nuclear and biomass. Howeve...
Hydroelectric Power Plants and Their Sustainability
Hydroelectric Power Plants and Their Sustainability
Hydropower is the oldest source of renewable mechanical power and largest source of renewable electricity globally accounting for close to 17% of global electricity generation alth...
Pumped Storage Hydropower for Sustainable and Low-Carbon Electricity Grids in Pacific Rim Economies
Pumped Storage Hydropower for Sustainable and Low-Carbon Electricity Grids in Pacific Rim Economies
Because generating electricity significantly contributes to global greenhouse gas emissions, meeting the 2015 Paris Agreement and 2021 Glasgow Climate Pact requires rapidly transit...
Principles for Locating Small Hydropower Plants in Accordance with Sustainability: A Case Study from Slovakia
Principles for Locating Small Hydropower Plants in Accordance with Sustainability: A Case Study from Slovakia
The present study examines the possibilities for developing the use of small hydropower plants (SHP) in Slovakia, focusing on the principles of sustainability and compliance with E...
Optimization of Hydropower Generation potential of Arjo Dedessa Dam
Optimization of Hydropower Generation potential of Arjo Dedessa Dam
Abstract Hydropower has been developed to have a positive impact on the quality of life for rural residents in many ways. It offers a wide range of facilities, such as impr...
Risk assessment for total dissolved gas supersaturation in the Nepali hydropower sector
Risk assessment for total dissolved gas supersaturation in the Nepali hydropower sector
Abstract The hydropower sector in Nepal is experiencing rapid growth, even though only a small part of Nepal’s economically feasible hydropower potential has been de...
Pre-feasibility Study and Design of a Multipurpose Reservoir
Pre-feasibility Study and Design of a Multipurpose Reservoir
In order to achieve the target, several activities are being undertaken, including the development of multipurpose reservoir planning for the water supply and sanitation infrastruc...
Applying GeoPlanner for ArcGIS in Urban planning
Applying GeoPlanner for ArcGIS in Urban planning
The science of urban planning emerged clearly after World War II, in the wake of the massive destruction of European cities. Because Iraq suffered from the results of more than thr...

Back to Top