Offshore Heavy Oil Polymer Flooding Test in JZW Area

View through CrossRef
Abstract JZW oilfield, which was considered as one of the best candidates for polymer flooding with low water salinity and temperature, is one of offshore heavy oilfields in Bohai bay. Based on a lot of the laboratory and numerical simulation studies, the polymer flooding test was initialed in 2007 while the area comprehensive water cut was 80%. By 2008, all injection wells in the area were transferred to polymer injection wells. For the effect of polymer flooding test, lots of measure adjustment was taken to optimize the injection and production structure, control the produced polymer concentration. At present, the obvious response to increasing oil and decreasing water cut is seen in the test area, 0.18PV polymer solution has been injected in the area, and the response was seen in almost all 21 producers. The average daily oil production rate of 10 typical producers increased from 190 bbl to 310 bbl, and the average water cut decreases from 85.2% to 63.1%. It can be observed from the production history of the target block of the similar rule as the typical well which the water cut increased after polymer flooding and reached the maximum value of 80%. With the polymer injected, the water cut decreased by a maximum of about 10% to 70% while oil production rate increased by about 30%. Now, the performance of the oilfield is basically in agreement with the results predicted by numerical simulation, expecting that the polymer flooding oil recover can be 6.2%(OOIP) higher than the water flooding. For the higher recovery, the surfactant-polymer flooding test has been run in one of the well groups of the area since last year.
Title: Offshore Heavy Oil Polymer Flooding Test in JZW Area
Description:
Abstract JZW oilfield, which was considered as one of the best candidates for polymer flooding with low water salinity and temperature, is one of offshore heavy oilfields in Bohai bay.
Based on a lot of the laboratory and numerical simulation studies, the polymer flooding test was initialed in 2007 while the area comprehensive water cut was 80%.
By 2008, all injection wells in the area were transferred to polymer injection wells.
For the effect of polymer flooding test, lots of measure adjustment was taken to optimize the injection and production structure, control the produced polymer concentration.
At present, the obvious response to increasing oil and decreasing water cut is seen in the test area, 0.
18PV polymer solution has been injected in the area, and the response was seen in almost all 21 producers.
The average daily oil production rate of 10 typical producers increased from 190 bbl to 310 bbl, and the average water cut decreases from 85.
2% to 63.
1%.
It can be observed from the production history of the target block of the similar rule as the typical well which the water cut increased after polymer flooding and reached the maximum value of 80%.
With the polymer injected, the water cut decreased by a maximum of about 10% to 70% while oil production rate increased by about 30%.
Now, the performance of the oilfield is basically in agreement with the results predicted by numerical simulation, expecting that the polymer flooding oil recover can be 6.
2%(OOIP) higher than the water flooding.
For the higher recovery, the surfactant-polymer flooding test has been run in one of the well groups of the area since last year.

Related Results

Mechanism Study on Foam Flooding for Daqing Reservoirs After Polymer Flooding
Mechanism Study on Foam Flooding for Daqing Reservoirs After Polymer Flooding
Abstract Polymer flooding has been carried out widely in Daqing oilfield. The average oil recovery was 53% and the water cut was more than 90% after polymer flooding...
Practice of the Early Stage Polymer Flooding on LD Offshore Oilfield in Bohai Bay of China
Practice of the Early Stage Polymer Flooding on LD Offshore Oilfield in Bohai Bay of China
Abstract Literature survey shows that polymer flooding was generally conducted during high water-cut stage (WCT>80%-90%). Even the first China Offshore polyme...
Study on the Profile Control Pilot Test by Microbial after Polymer Floods in Daqing Oilfields
Study on the Profile Control Pilot Test by Microbial after Polymer Floods in Daqing Oilfields
Abstract In order to further enhance oil recovery of the reservoirs after polymer flooding, two strains of bacterium that could be used on microbial profile modif...
Studies On Foam Flooding EOR Technique For Daqing Reservoirs After Polymer Flooding
Studies On Foam Flooding EOR Technique For Daqing Reservoirs After Polymer Flooding
Abstract Most of the high permeability reservoirs in Daqing oil field have been conducted by water flooding and polymer flooding. The average oil reco...
Recent Progress and Evaluation of ASP Flooding for EOR in Daqing Oil Field
Recent Progress and Evaluation of ASP Flooding for EOR in Daqing Oil Field
Abstract Many ASP flooding method have been tested in Daqing oil field. After the success of polymer flooding in Daqing oil field, four alkaline- surfactant-polymer ...
Commercial Test of Polymer Flooding in Daqing Oil Field Daqing petroleum Administrative Bureau
Commercial Test of Polymer Flooding in Daqing Oil Field Daqing petroleum Administrative Bureau
Wang Demin, SPE Member, Zhang Jingcun, Meng Fanru, Liu Heng, Li Lin, Han Bohui, Qi Lianqing Abstract Commercial pilot test of po...
Offshore Large Scale Polymer Flood Implementation at Chengdao Field
Offshore Large Scale Polymer Flood Implementation at Chengdao Field
Abstract The number of polymer injection projects has greatly increased worldwide in the past decade, with more and more full-field implementations. More recently, t...
A Pilot Test of High-Concentration Polymer Flooding To Further Enhance Oil Recovery
A Pilot Test of High-Concentration Polymer Flooding To Further Enhance Oil Recovery
Abstract The results of lab tests show that an incremental recovery over water flooding of more than 20% OOIP (original oil in place) can be obtained by early time i...