Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Multi-Task Simultaneous Supervision

View through CrossRef
This paper focuses on developing a Multi-Task Simultaneous Supervision Dual Resource-Constrained Scheduling (MTSSDRC) system that considers differences in skill between operators, aiming to minimize makespan and balance operator workload. Workload balance is calculated using the Workload Smoothness Index (WSI). The mathematical model developed uses three techniques: Mixed-Integer Linear Programming (MILP), Mixed-Integer Quadratic Programming (MIQP), and Mixed-Integer Quadratically Constrained Programming (MIQCP). These techniques can handle scheduling cases on a small to medium scale. Results from MILP focus on minimizing makespan, with an additional constraint for calculating the WSI. MIQP focuses on workload balance so that the WSI value becomes an objective function. It also adds a constraint for the allowable makespan value. The result from MIQP shows that the WSI value is lower than in MILP, and the makespan values are equal to the MILP makespan value. Next, MIQCP aims to minimize makespan with a constraint for the allowable WSI value. The MIQCP model produces a makespan value adjusted to a WSI value close to zero. Finally, further analysis is presented regarding the influence of differences in operator skills based on the results of the three models. Based on these models, operators with better skills will be assigned more frequently than others.
Title: Multi-Task Simultaneous Supervision
Description:
This paper focuses on developing a Multi-Task Simultaneous Supervision Dual Resource-Constrained Scheduling (MTSSDRC) system that considers differences in skill between operators, aiming to minimize makespan and balance operator workload.
Workload balance is calculated using the Workload Smoothness Index (WSI).
The mathematical model developed uses three techniques: Mixed-Integer Linear Programming (MILP), Mixed-Integer Quadratic Programming (MIQP), and Mixed-Integer Quadratically Constrained Programming (MIQCP).
These techniques can handle scheduling cases on a small to medium scale.
Results from MILP focus on minimizing makespan, with an additional constraint for calculating the WSI.
MIQP focuses on workload balance so that the WSI value becomes an objective function.
It also adds a constraint for the allowable makespan value.
The result from MIQP shows that the WSI value is lower than in MILP, and the makespan values are equal to the MILP makespan value.
Next, MIQCP aims to minimize makespan with a constraint for the allowable WSI value.
The MIQCP model produces a makespan value adjusted to a WSI value close to zero.
Finally, further analysis is presented regarding the influence of differences in operator skills based on the results of the three models.
Based on these models, operators with better skills will be assigned more frequently than others.

Related Results

Limitations of Multicultural Supervision in Clinical Neuropsychology
Limitations of Multicultural Supervision in Clinical Neuropsychology
Abstract Multicultural awareness, competency based clinical supervision, and the clinical neuropsychology subspecialties are ar...
tugas pert 14 sinta
tugas pert 14 sinta
The purpose of making this article are: 1. Can see how the education supervision process; 2. Stages of the education supervision process; 3. The importance of educational supervisi...
Optimalisasi Pelaksanaan Supervisi di Ruang Bedah Rumah Sakit Umum Daerah Pringsewu
Optimalisasi Pelaksanaan Supervisi di Ruang Bedah Rumah Sakit Umum Daerah Pringsewu
Supervision should be scheduled and programmed, and if conducted continuously, it can ensure that nursing care is delivered in accordance with nursing practice standards. According...
Development of Nursing Clinical Supervision Application
Development of Nursing Clinical Supervision Application
ABSTRACT   Nursing services require an effective and efficient nursing management system, so that nursing resources can be directed to produce quality nursing services,...
Key success factors in implementing supervision management in social institutions
Key success factors in implementing supervision management in social institutions
Supervision is a method increasingly used in social work. As an ongoing, structured process involving the social worker and the supervisor and based on openness and trust, it can b...
Social Work Supervision Education: Pennsylvania Social Workers Reflect on education and Supervisory Competence
Social Work Supervision Education: Pennsylvania Social Workers Reflect on education and Supervisory Competence
Supervision is an essential component of social work education and ongoing professional development for those employed at all levels of practice, having been identified as a protec...
Proses dan teknik supervisi
Proses dan teknik supervisi
The purpose of making this article are: 1. Can see how the education supervision process; 2. Stages of the education supervision process; 3. The importance of educational supervisi...

Back to Top