Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Analisis Pemecahan Beban Penyulang Kalipare 20 kV

View through CrossRef
The Kalipare feeder is a feeder located at PT PLN (Persero) ULP Sumberpucung where the feeder has a feeder length of 232.9 kms and a load of 161.8 A, with a voltage drop of 17.981 kV, the energy loss that is not channeled in 40.82 minutes is IDR 5,333,734.00. So with that the feeder is carried out there is a splitting of the load into two, namely 86.6 A and 74.4 A, with the end voltage being 19.27 kV, with the energy loss that is not channeled in 40.82 minutes is Rp. 2,454.510.8. This load solving is carried out based on the existing conditions of the Kalipare Feeder in 2019, as well as modeling in the form of simulations using ETAP 12.6 and analyzing the simulation results with the existing load breaking conditions in 2020. Load splitting locations are carried out at 7 points taking into account the value of the investment to be made used to do the job. The locations where the load splitting will be carried out are GI Karangkates, Perempatan Peteng, Tumpakmiri, Kalipare, and Banduarjo with an investment cost of Rp. 21,124,247,696 with the construction of 527 gates. After breaking the load, which resulted in the Kalipare feeder and the Donomulyo feeder, the value of the voltage drop on the Kalipare feeder decreased to 18.25 kV; 8.70%, while the Donomulyo Feeder is 19.241 kV; 3.84%. The solution to the load of the Kalipare feeder will minimize losses due to blackouts and increase customer satisfaction.
Title: Analisis Pemecahan Beban Penyulang Kalipare 20 kV
Description:
The Kalipare feeder is a feeder located at PT PLN (Persero) ULP Sumberpucung where the feeder has a feeder length of 232.
9 kms and a load of 161.
8 A, with a voltage drop of 17.
981 kV, the energy loss that is not channeled in 40.
82 minutes is IDR 5,333,734.
00.
So with that the feeder is carried out there is a splitting of the load into two, namely 86.
6 A and 74.
4 A, with the end voltage being 19.
27 kV, with the energy loss that is not channeled in 40.
82 minutes is Rp.
2,454.
510.
8.
This load solving is carried out based on the existing conditions of the Kalipare Feeder in 2019, as well as modeling in the form of simulations using ETAP 12.
6 and analyzing the simulation results with the existing load breaking conditions in 2020.
Load splitting locations are carried out at 7 points taking into account the value of the investment to be made used to do the job.
The locations where the load splitting will be carried out are GI Karangkates, Perempatan Peteng, Tumpakmiri, Kalipare, and Banduarjo with an investment cost of Rp.
21,124,247,696 with the construction of 527 gates.
After breaking the load, which resulted in the Kalipare feeder and the Donomulyo feeder, the value of the voltage drop on the Kalipare feeder decreased to 18.
25 kV; 8.
70%, while the Donomulyo Feeder is 19.
241 kV; 3.
84%.
The solution to the load of the Kalipare feeder will minimize losses due to blackouts and increase customer satisfaction.

Related Results

Analisis Perencanaan Pemasangan Recloser pada Penyulang untuk Meminamilisr Pemadaman
Analisis Perencanaan Pemasangan Recloser pada Penyulang untuk Meminamilisr Pemadaman
Salah satu penyulang yang ada di PT. PLN (Persero) ULP adalah Penyulang Selecta. Bedasarkan data Penyulang Selecta mengalami gangguan sebanyak 34 kali gangguan dari Januari 2018 - ...
Umjetničko djelo Brede Beban u kontekstu feminističke i postkolonijalne teorije
Umjetničko djelo Brede Beban u kontekstu feminističke i postkolonijalne teorije
I find the key reason in studying this artistic oeuvre in the fact that Breda Beban’s overall oeuvre is less known to the Croatian expert public, and that she has mostly been viewe...
Analisis Kebutuhan Modul Matematika untuk Meningkatkan Kemampuan Pemecahan Masalah Siswa SMP N 4 Batang
Analisis Kebutuhan Modul Matematika untuk Meningkatkan Kemampuan Pemecahan Masalah Siswa SMP N 4 Batang
Pemecahan masalah merupakan suatu usaha untuk menyelesaikan masalah matematika menggunakan pemahaman yang telah dimilikinya. Siswa yang mempunyai kemampuan pemecahan masalah rendah...
Optimisasi Penjadwalan Pembangkit pada Microgrid dengan Mempertimbangkan Respons Beban
Optimisasi Penjadwalan Pembangkit pada Microgrid dengan Mempertimbangkan Respons Beban
Abstract – In a smart grid, the adequacy of electricity supply is not only determined by generation, but the electrical demand can also be involved. Demand response is one way to m...
Analisis Keandalan Jaringan Tegangan Menengah 20 kV Wilayah Tenggarong Sistem Mahakam
Analisis Keandalan Jaringan Tegangan Menengah 20 kV Wilayah Tenggarong Sistem Mahakam
Analisis keandalan penyaluran energi listrik pada JTM 20 KV melalui penyulang R-1, R-3 dan R-5 ke konsumen di wilayah Tenggarong pada tahun 2018 sangat dipengaruhi jumlah gangguan ...
Pengaruh Pembelajaran Think Pair Share dengan Media Monusra terhadap Kemampuan Pemecahan Masalah Siswa SD
Pengaruh Pembelajaran Think Pair Share dengan Media Monusra terhadap Kemampuan Pemecahan Masalah Siswa SD
Abstract This research is motivated by the results of the initial test of student's problem-solving abilities that have not been as expected, student's problem-solving abilitie...
EVALUASI FAKTOR BEBAN TENAGA LISTRIK PADA FEEDER TRAFO 2 PANAKKUKANG MAKASSAR
EVALUASI FAKTOR BEBAN TENAGA LISTRIK PADA FEEDER TRAFO 2 PANAKKUKANG MAKASSAR
Penelitian ini bertujuan untuk mengetahui besar perubahan faktor beban sektor pelanggan listrik pada saluran distribusi feeder trafo 2 panakkukang untuk mengetahui besar faktor rug...
Analisis Kemampuan Pemecahan Masalah Siswa Pada Pembelajaran SPLDV Berbasis STEM
Analisis Kemampuan Pemecahan Masalah Siswa Pada Pembelajaran SPLDV Berbasis STEM
Salah satu dari tujuan dalam proses pembelajaran adalah pemecahan masalah. Namun berbagai penelitian menunjukkan bahwa kemampuan pemecahan masalah matematis siswa belum sesuai deng...

Back to Top