Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Critical Success Factors for Post Occupancy Evaluation of Hospital Building Performance

View through CrossRef
This paper discusses the importance of critical success factors (CSFs) for post occupancy evaluation (POE) of hospital building performance. Recent failures of hospital buildings in delivering the expected service have raised the need for POE of their actual performance. However, POE of hospital building performance is a difficult undertaking and requires a vast amount of resources. Management, competencies, culture and awareness have been recognised as the factors that impede the success of POE projects. This demands the identification of the critical success factors (CSFs) that will enable POE projects to be undertaken without the success-impeding factors aforementioned, hence leading to successful POE projects. Despite the numerous studies on POE, the CSFs for POE have not been investigated. This leads to a knowledge gap of what are the actual CSFs that need to be considered in ensuring the success rate of hospital POE projects. By reviewing various related literatures, this paper attempts to generally look at the possibility of conducting a study on CSFs to ensure the success of hospital POE projects. This paper will eventually review the need for CSFs for POE of hospital building performance.
Title: Critical Success Factors for Post Occupancy Evaluation of Hospital Building Performance
Description:
This paper discusses the importance of critical success factors (CSFs) for post occupancy evaluation (POE) of hospital building performance.
Recent failures of hospital buildings in delivering the expected service have raised the need for POE of their actual performance.
However, POE of hospital building performance is a difficult undertaking and requires a vast amount of resources.
Management, competencies, culture and awareness have been recognised as the factors that impede the success of POE projects.
This demands the identification of the critical success factors (CSFs) that will enable POE projects to be undertaken without the success-impeding factors aforementioned, hence leading to successful POE projects.
Despite the numerous studies on POE, the CSFs for POE have not been investigated.
This leads to a knowledge gap of what are the actual CSFs that need to be considered in ensuring the success rate of hospital POE projects.
By reviewing various related literatures, this paper attempts to generally look at the possibility of conducting a study on CSFs to ensure the success of hospital POE projects.
This paper will eventually review the need for CSFs for POE of hospital building performance.

Related Results

Evolution of Antimicrobial Resistance in Community vs. Hospital-Acquired Infections
Evolution of Antimicrobial Resistance in Community vs. Hospital-Acquired Infections
Abstract Introduction Hospitals are high-risk environments for infections. Despite the global recognition of these pathogens, few studies compare microorganisms from community-acqu...
Detecting occupancy behaviour of buildings through environment monitoring sensing
Detecting occupancy behaviour of buildings through environment monitoring sensing
The goal of this research is to produce a realistic occupancy forecast as well as an ideal occupancy-based controller for increasing the performance of Heating Ventilation and Air-...
Mt or not Mt: Temporal variation in detection probability in spatial capture-recapture and occupancy models
Mt or not Mt: Temporal variation in detection probability in spatial capture-recapture and occupancy models
State variables such as abundance and occurrence of species are central to many questions in ecology and conservation, but our ability to detect and enumerate species is imperfect ...
EXPERTS’ IDENTIFICATION OF POST-OCCUPANCY EVALUATION CONCEPTS RELEVANT TO BUILDING PERFORMANCE
EXPERTS’ IDENTIFICATION OF POST-OCCUPANCY EVALUATION CONCEPTS RELEVANT TO BUILDING PERFORMANCE
Post occupancy evaluation is an approach in determining building performance based primarily on users' views. These views are sorted and evaluated by experts in the building indust...
Der skal ikke lades sten på sten tilbage
Der skal ikke lades sten på sten tilbage
The Building by the Barbar TempleClose by the large temple at Barbar 1) lies a little tell, which was investigated in the spring of 1956. The tell was shown to cover a building of ...
Occupancy Comfort Evaluation in Green Building Rating Tools in Malaysia: A Comparative Review
Occupancy Comfort Evaluation in Green Building Rating Tools in Malaysia: A Comparative Review
Passive design strategy is the approach that maximizing utilization of natural resources to achieve occupancy comfort which covers the thermal comfort, visual comfort and acoustic ...
The Contribution of Online and Offline Travel Agent Reservations to Increase Room Occupancy at The Westin Resort Nusa Dua, Bali
The Contribution of Online and Offline Travel Agent Reservations to Increase Room Occupancy at The Westin Resort Nusa Dua, Bali
Purpose: This research focuses on the contribution of room reservations and occupancy. The problem under investigation is to compare the contributions of online and offline travel ...
Critical Success Factors for Post Occupancy Evaluation of Building Performance: A Literature Analysis
Critical Success Factors for Post Occupancy Evaluation of Building Performance: A Literature Analysis
This paper aims to identify the critical success factors (CSFs) for post occupancy evaluation (POE) of building performance based on literature review. Failures in carrying out POE...

Back to Top