QUAD Lift: Enabling Lifting of Larger Integrated Topsides
View through CrossRef
Abstract
Over the past years Heerema Marine Contractors (HMC) has developed the QUAD lift method enabling the lift of single piece objects up to 30,000mT. This development is driven by the demand from our clients to install or remove larger topsides, both in size and weight. Lifting with two (or more) vessels simultaneously has been done before. Unique is that the QUAD lift operation is performed on DP. Two vessels lifting the topsides from opposite sides, instead of lifting the topsides from one side, creates the possibility for increasing dimensions and layouts of the topsides.
The connection of the two crane vessels to the lifted object means that all actions taken on one ship influences not only the lifted object but also the second crane vessel. This requires a clear communication plan and full understanding of the complete system such as the DP behaviour, stability, ballast operations and crane operations. During a QUAD lift operation the Dynamic Positioning (DP) system plays an important role. Therefore in the development process the DP-system was modified to ensure stability of the DP system throughout the entire operation. A systematic series of tests was performed to gain insight in the DP behaviour of both vessels with the goal to ensure a synchronous move with two vessels connected in a QUAD lift configuration.
In 2018 a demonstration QUAD lift is performed using Balder and Thialf to show HMCs commitment to perform this kind of operations in the future. The QUAD lift demonstration lift was prepared and executed in the Heerema Simulation Center (HSC) with the offshore crew in preparation of the actual offshore execution.
This paper will address the steps followed to prepare for the offshore execution, describing DP behaviour, vessel coupled dynamics and human factor aspects. Based on the offshore experience validation was performed on the numerical tools used in the preparation.
American Society of Mechanical Engineers
Title: QUAD Lift: Enabling Lifting of Larger Integrated Topsides
Description:
Abstract
Over the past years Heerema Marine Contractors (HMC) has developed the QUAD lift method enabling the lift of single piece objects up to 30,000mT.
This development is driven by the demand from our clients to install or remove larger topsides, both in size and weight.
Lifting with two (or more) vessels simultaneously has been done before.
Unique is that the QUAD lift operation is performed on DP.
Two vessels lifting the topsides from opposite sides, instead of lifting the topsides from one side, creates the possibility for increasing dimensions and layouts of the topsides.
The connection of the two crane vessels to the lifted object means that all actions taken on one ship influences not only the lifted object but also the second crane vessel.
This requires a clear communication plan and full understanding of the complete system such as the DP behaviour, stability, ballast operations and crane operations.
During a QUAD lift operation the Dynamic Positioning (DP) system plays an important role.
Therefore in the development process the DP-system was modified to ensure stability of the DP system throughout the entire operation.
A systematic series of tests was performed to gain insight in the DP behaviour of both vessels with the goal to ensure a synchronous move with two vessels connected in a QUAD lift configuration.
In 2018 a demonstration QUAD lift is performed using Balder and Thialf to show HMCs commitment to perform this kind of operations in the future.
The QUAD lift demonstration lift was prepared and executed in the Heerema Simulation Center (HSC) with the offshore crew in preparation of the actual offshore execution.
This paper will address the steps followed to prepare for the offshore execution, describing DP behaviour, vessel coupled dynamics and human factor aspects.
Based on the offshore experience validation was performed on the numerical tools used in the preparation.
Related Results
Fundamental study on rope vibration suppression by middle transfer floor using risk information
Fundamental study on rope vibration suppression by middle transfer floor using risk information
Lifts are essential for means of vertical transportation. Recently, the lifts installed in the high-rise buildings are long travel, thus the lift ropes are becoming longer. The nat...
Modal and stress behavioral for CFRP composite lifting lug
Modal and stress behavioral for CFRP composite lifting lug
Purpose
In the present study, a steel lifting lug is replaced with a composite (carbon fiber-reinforced epoxy [CFRP]) lifting lug made of a carbon/epoxy composite. The purpose of t...
Modular Topsides for Large Floating Production Platforms
Modular Topsides for Large Floating Production Platforms
1. ABSTRACT
Topsides for floating production systems are traditionally built as integrated decks. This paper describes the results of study work, conducted to det...
Pig Lift: A New Artificial Lift Method
Pig Lift: A New Artificial Lift Method
Abstract
Artificial lift of oil wells is a fairly broad subject. There are many different methods available but in a few cases none of them turns out to be a fit ...
Gas Lift - Past & Future
Gas Lift - Past & Future
Abstract
This paper will describe the evolution of gas lift systems over the past few decades, making parallels with other artificial lift technologies (ESP, SRP, an...
The Future of Plunger Lift Control Using Artificial Intelligence
The Future of Plunger Lift Control Using Artificial Intelligence
Abstract
Plunger lift is a form of artificial lift popular due to its low installation and operating costs. Historically plunger lift was reserved for low producing ...
Artificial Lift Selection Strategy to Maximize Unconventional Oil and Gas Assets Value
Artificial Lift Selection Strategy to Maximize Unconventional Oil and Gas Assets Value
Abstract
The challenges of producing and lifting unconventional oil and gas economically is no doubt the most daunting phase of unconventional oil and gas developmen...
A Conceptual Study of Dual Lift Design in Ultradeep Wells
A Conceptual Study of Dual Lift Design in Ultradeep Wells
Abstract
For many years rod pumping has been a desirable artificial lift method for on-shore oil wells. Today, in addition to rod pumps, other artificial lift method...