Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Research on the Design Scheme of the Mainline-to-Ramp Widened Bridge Node for the Expressway Upgrade Project of Beichen Avenue (North Second Ring Road - Qinhan Avenue)

View through CrossRef
The width of the prestressed concrete beam is integrated with the width-split width. The existing prestressed concrete beam and the width-split beam are connected by cantilevers. The horizontal steel bars are implanted in the existing bridge cantilevers and the horizontal steel bars are connected with the cantilevers of the wide beam cantilevers. The longitudinal steel bars are arranged. The cast-in-place wet joints are UHPC (ultra-high performance concrete). In the study of the design plan for the main line connection ramp wide-split bridge of Beichen Avenue (North Second Ring Road - Qinhan Avenue) rapid transformation project, the wide-split bridge was mainly studied and analyzed from two plans. Plan 1, the bridge deck was not widened, and the superstructure was hinged. The plan focused on the impact on the current bridge traffic during the construction period. The bridge deck was widened. The bridge deck was built on the outside of the current bridge. The new and old bridge deck was connected with wet joints; Plan 2, the bridge deck was widened, and the superstructure was semi-rigid. The plan focused on the impact on the current bridge traffic during the construction period. The bridge deck was widened, and the new and old bridge decks were connected with wet joints.
Title: Research on the Design Scheme of the Mainline-to-Ramp Widened Bridge Node for the Expressway Upgrade Project of Beichen Avenue (North Second Ring Road - Qinhan Avenue)
Description:
The width of the prestressed concrete beam is integrated with the width-split width.
The existing prestressed concrete beam and the width-split beam are connected by cantilevers.
The horizontal steel bars are implanted in the existing bridge cantilevers and the horizontal steel bars are connected with the cantilevers of the wide beam cantilevers.
The longitudinal steel bars are arranged.
The cast-in-place wet joints are UHPC (ultra-high performance concrete).
In the study of the design plan for the main line connection ramp wide-split bridge of Beichen Avenue (North Second Ring Road - Qinhan Avenue) rapid transformation project, the wide-split bridge was mainly studied and analyzed from two plans.
Plan 1, the bridge deck was not widened, and the superstructure was hinged.
The plan focused on the impact on the current bridge traffic during the construction period.
The bridge deck was widened.
The bridge deck was built on the outside of the current bridge.
The new and old bridge deck was connected with wet joints; Plan 2, the bridge deck was widened, and the superstructure was semi-rigid.
The plan focused on the impact on the current bridge traffic during the construction period.
The bridge deck was widened, and the new and old bridge decks were connected with wet joints.

Related Results

The Burden of Road Traffic Injuries: A Global Perspective
The Burden of Road Traffic Injuries: A Global Perspective
Introduction     Road Traffic Injury (RTI) pose a significant health challenge. It represents the eighth leading cause of death globally, prompting the UN to designate 2011-2020 as...
Inside-Out Repair of Medial Meniscal Ramp Lesions in Patients Undergoing Anterior Cruciate Ligament Reconstruction
Inside-Out Repair of Medial Meniscal Ramp Lesions in Patients Undergoing Anterior Cruciate Ligament Reconstruction
Background: Medial meniscal ramp lesions are disruptions at the meniscocapsular junction and/or meniscotibial attachment of the posterior horn of the medial meniscus, a...
Research on optimization of traffic management and control measures for expressway emergency based on VISSIM simulation
Research on optimization of traffic management and control measures for expressway emergency based on VISSIM simulation
Abstract With the continuous enhancement of China’s economic strength, the scale and quantity of expressway construction are constantly improving, and the expressway...
Evaluation Of Road Channel As A Drainage Function For Agricultural Land Remediation
Evaluation Of Road Channel As A Drainage Function For Agricultural Land Remediation
The Ring Road section on the West Ring Road - Madiun City is an alternative road which connecting the outside of Madiun city to the Madiun city. That road is a road with both side ...
The fate of unrepaired stable ramp lesions: a systematic review
The fate of unrepaired stable ramp lesions: a systematic review
This study was performed according to the PRISMA (Preferred Reporting Items for Systematic Reviews and Meta- Analyses) guidelines. PubMed and Medline databases were searched in Oct...
Cooperative Lane Changing Strategies for Connected and Automated Vehicles in Weaving Areas
Cooperative Lane Changing Strategies for Connected and Automated Vehicles in Weaving Areas
<div class="section abstract"><div class="htmlview paragraph">Weaving area is one of the typical traffic bottlenecks of urban expressway and its traffic dynamics are ve...

Back to Top