Javascript must be enabled to continue!
Analysis of project delivery systems in Chinese construction industry with data envelopment analysis (DEA)
View through CrossRef
PurposeSelecting a proper project delivery system is one of the critical issues for the success of a project. This paper discusses the application of project delivery systems in China and the existing project delivery system selection methods, analyzes project objectives and indicators influencing the selection of project delivery systems, and aims at finding an appropriate method to select project delivery systems.Design/methodology/approachA survey was conducted by postal questionnaire and Multivariate Statistical Analysis was applied to analyze the project data. A robust model was developed to analyze the selection of project delivery systems.FindingsThe results of survey and analysis show that design‐bid‐build (DBB)/project management (DBB+PM), design‐build (DB)/engineering, procurement and construction (EPC)/Turnkey, multi‐stage DB/EPC and EP+C are commonly used in China. The differences between DBB and DBB+PM, and differences between DB/EPC and Turnkey in China are not significant. Weights of project objectives in each project delivery system and the ranking of indicators influencing the selection of project delivery systems are acquired.Originality/valueAnalysis was conducted with a robust model instead of traditional model in consideration of efficiency. This research may assist owners in Mainland China in selecting project delivery systems, improve project performance, and encourage efficiency in project delivery process.
Title: Analysis of project delivery systems in Chinese construction industry with data envelopment analysis (DEA)
Description:
PurposeSelecting a proper project delivery system is one of the critical issues for the success of a project.
This paper discusses the application of project delivery systems in China and the existing project delivery system selection methods, analyzes project objectives and indicators influencing the selection of project delivery systems, and aims at finding an appropriate method to select project delivery systems.
Design/methodology/approachA survey was conducted by postal questionnaire and Multivariate Statistical Analysis was applied to analyze the project data.
A robust model was developed to analyze the selection of project delivery systems.
FindingsThe results of survey and analysis show that design‐bid‐build (DBB)/project management (DBB+PM), design‐build (DB)/engineering, procurement and construction (EPC)/Turnkey, multi‐stage DB/EPC and EP+C are commonly used in China.
The differences between DBB and DBB+PM, and differences between DB/EPC and Turnkey in China are not significant.
Weights of project objectives in each project delivery system and the ranking of indicators influencing the selection of project delivery systems are acquired.
Originality/valueAnalysis was conducted with a robust model instead of traditional model in consideration of efficiency.
This research may assist owners in Mainland China in selecting project delivery systems, improve project performance, and encourage efficiency in project delivery process.
Related Results
7 Final Report on the Safety Assessment of Cocamide DEA, Lauramide DEA, Linoleamide DEA, and Oleamide DEA
7 Final Report on the Safety Assessment of Cocamide DEA, Lauramide DEA, Linoleamide DEA, and Oleamide DEA
Cocamide DEA, Lauramide DEA, Linoleamide DEA, and Oleamide DEA are fatty acid diethanolamides that may contain 4–33% diethanolamine. These ingredients are used in cosmetics at conc...
Network DEA based on DEA-ratio
Network DEA based on DEA-ratio
AbstractData envelopment analysis (DEA) is a technique to measure the performance of decision-making units (DMUs). Conventional DEA treats DMUs as black boxes and the internal stru...
Architecture between heteronomy and self-generation
Architecture between heteronomy and self-generation
Introduction
«I have never worked in the technocratic exaltation, solving a constructive problem and that’s it. I’ve always tried to interpret the space of human life» (Vitto...
EFFECTS OF TIME MANAGEMENT PRACTICES ON THE PERFORMANCE OF BUILDING PROJECT DELIVERY IN AKURE, ONDO STATE, NIGERIA
EFFECTS OF TIME MANAGEMENT PRACTICES ON THE PERFORMANCE OF BUILDING PROJECT DELIVERY IN AKURE, ONDO STATE, NIGERIA
Effective management of time in construction project accounts for increased project delivery performance in terms of cost, time, and quality. This study aims to assess the effect o...
The benefit of performance indicators in efficiency assessment using data envelopment analysis
The benefit of performance indicators in efficiency assessment using data envelopment analysis
ABSTRACT
Performance indicators (PIs) are important parameters in the management of water services. Regulators have developed empirical analysis utilising PIs to ran...
Supply chain performance measurement system using DEA modeling
Supply chain performance measurement system using DEA modeling
PurposeThis paper aims to illustrate the use of data envelopment analysis (DEA) in measuring internal supply chain performance.Design/methodology/approachTwo DEA models were develo...
Open-Loop Control for Displacement of Balloon-Type Dielectric Elastomer Actuator Pre-Stretched with Water Pressure
Open-Loop Control for Displacement of Balloon-Type Dielectric Elastomer Actuator Pre-Stretched with Water Pressure
Abstract
Soft actuators have attracted significant attention owing to their unique characteristics and potential for various applications.
A dielectric elastomer actuator ...
Data Envelopment Analysis (DEA) in the Educational Sciences
Data Envelopment Analysis (DEA) in the Educational Sciences
Using methods like linear regression or latent variable models, researchers are often interested in maximizing explained variance and identifying the importance of specific variabl...

