Post Mortem of a Feedwater Heater With Drains Cooler Failures

View through CrossRef
The Paradise Generation Station Unit 3 is a supercritical fossil plant with a 1,078 MW rated capacity. The #3B feedwater heater (FWH) is a two-zone (condensing and subcooling) horizontal FWH and is the second of four high pressure (HP) FWHs after the boiler feed pump in the “B” string, one of two HP FWH strings (See Figure A2 at the end of this paper for an outline drawing of the heater. The heater has 1447 SA-556-C2 Carbon Steel tubes, 3/4” OD × 0.085 min wall. The heater was built in late 2006/early 2007 and was installed in summer 2007. After just a few years of operation, the #3B FWH experienced several failures at the entrance to the drain cooler (DC) zone. The #3A FWH, of identical construction and built and installed at the same time, did not show the same level of damage. In order to determine the failure mechanisms involved, a post-mortem of the heater was performed. This paper shall discuss the post-mortem inspection conducted as well as the suspected and confirmed causes of failure in the heater.
American Society of Mechanical Engineers
Title: Post Mortem of a Feedwater Heater With Drains Cooler Failures
Description:
The Paradise Generation Station Unit 3 is a supercritical fossil plant with a 1,078 MW rated capacity.
The #3B feedwater heater (FWH) is a two-zone (condensing and subcooling) horizontal FWH and is the second of four high pressure (HP) FWHs after the boiler feed pump in the “B” string, one of two HP FWH strings (See Figure A2 at the end of this paper for an outline drawing of the heater.
The heater has 1447 SA-556-C2 Carbon Steel tubes, 3/4” OD × 0.
085 min wall.
The heater was built in late 2006/early 2007 and was installed in summer 2007.
After just a few years of operation, the #3B FWH experienced several failures at the entrance to the drain cooler (DC) zone.
The #3A FWH, of identical construction and built and installed at the same time, did not show the same level of damage.
In order to determine the failure mechanisms involved, a post-mortem of the heater was performed.
This paper shall discuss the post-mortem inspection conducted as well as the suspected and confirmed causes of failure in the heater.

Related Results

[RETRACTED] Keanu Reeves CBD Gummies v1
[RETRACTED] Keanu Reeves CBD Gummies v1
[RETRACTED]Keanu Reeves CBD Gummies ==❱❱ Huge Discounts:[HURRY UP ] Absolute Keanu Reeves CBD Gummies (Available)Order Online Only!! ❰❰= https://www.facebook.com/Keanu-Reeves-CBD-G...
PRELIMINARY DESIGN OF RDE FEEDWATER PUMP IMPELLER
PRELIMINARY DESIGN OF RDE FEEDWATER PUMP IMPELLER
Nowadays, pumps are being widely used in the thermal power generation including nuclear power plants. Reaktor Daya Eksperimental (RDE) is a proposed nuclear reactor concept for the...
Application of Self-Disturbance-Robust Generalized Predictive Control in Feedwater Temperature Control
Application of Self-Disturbance-Robust Generalized Predictive Control in Feedwater Temperature Control
To address the issue of energy conservation of high-pressure heater systems in feedwater temperature elevating, this paper proposes an advanced control strategy based on a self-dis...
TEMPERATURE DISTRIBUTION SIMULATION AND OPTIMIZATION DESIGN OF ELECTRIC HEATER FOR IN-SITU OIL SHALE HEATING; pp. 105–120
TEMPERATURE DISTRIBUTION SIMULATION AND OPTIMIZATION DESIGN OF ELECTRIC HEATER FOR IN-SITU OIL SHALE HEATING; pp. 105–120
Electric heating is the main method of exploiting oil shale and electric heater is the key part of the heating element. In this paper, the tem­perature distribution of the electri...
ANALISIS PERBAIKAN KINERJA HEATER PADA SISTEM KILN DRY DI PT. SEJIN LESTARI FURNITURE
ANALISIS PERBAIKAN KINERJA HEATER PADA SISTEM KILN DRY DI PT. SEJIN LESTARI FURNITURE
Penelitian ini menuliskan tentang proses perbaikan sistem heater pada kiln dry dengan fokus pada industri pengeringan kayu di PT. Sejin Lestari Furniture Rangkasbitung. Penelitian ...
Chemical Cleaning of Feedwater Heaters
Chemical Cleaning of Feedwater Heaters
In a paper delivered before the 1960 meeting of the American Society of Mechanical Engineers(1), the need of preoperational cleaning of the preboiler system of utility boilers was ...
Dynamic Response of Vertical Sand Drains in a Zone with Seismic Amplification
Dynamic Response of Vertical Sand Drains in a Zone with Seismic Amplification