SIMULATION OF BOILER FEED PUMP USING CONTROLLER PROGRAM: A CASE STUDY OF SAPELE POWER BOILER FEED PUMP

View through CrossRef
The goal of this work is to automate the Sapele Power Plant Boiler Feed Pumps (BFPs) using CODESYS software to simulate BFP controlled by a proposed PLC system that was manually controlled. The boiler pressure, level, feed stream flow, and primary heat transport (PHT) pressure BFP were restored to their optimal levels within a few seconds after trip. This was possible for the standby program used for automation within 14 seconds when compared to the manual process that was in place. During the simulation, the BFP goes into standby mode after 14 seconds. The results obtained under automated condition shows the boiler pressure rises to 40.3 kg/cm-1s-2 and remained stable for 147 seconds as against 55.9 kg/cm-1s-2 in 25 seconds under unautomated conditions. The flow rate of the feed water shows a decrease of -0.172 m at 50 seconds. The boiler pressure rose further to 44 kg/cm-1s-2 at 175 seconds, which corresponds to a specific gravity value of 59.5 kg/cm3 at the same time. At 146 seconds, the feed water hits the trip setting of -2.85m owed to low specific gravity (SG) level when compared to the unautomated condition. Thus, a further increase reached fluctuation level of -10m at 200 seconds. The PHT was 88.5 kg/cm-1s-2 at 146 seconds contrary to the expected pressure of 105.6 kg/cm-1s-2 for unautomated state. This change after 146 seconds results from generator trip. The pressure increases to 90.2 kg/cm3 at approximately 148 seconds and subsequently decreases to 48 kg/cm3 consequently opening of the condenser steam discharge valve (CSDVs) and atmospheric steam discharge valve (ASDVs) during the simulation state.
Title: SIMULATION OF BOILER FEED PUMP USING CONTROLLER PROGRAM: A CASE STUDY OF SAPELE POWER BOILER FEED PUMP
Description:
The goal of this work is to automate the Sapele Power Plant Boiler Feed Pumps (BFPs) using CODESYS software to simulate BFP controlled by a proposed PLC system that was manually controlled.
The boiler pressure, level, feed stream flow, and primary heat transport (PHT) pressure BFP were restored to their optimal levels within a few seconds after trip.
This was possible for the standby program used for automation within 14 seconds when compared to the manual process that was in place.
During the simulation, the BFP goes into standby mode after 14 seconds.
The results obtained under automated condition shows the boiler pressure rises to 40.
3 kg/cm-1s-2 and remained stable for 147 seconds as against 55.
9 kg/cm-1s-2 in 25 seconds under unautomated conditions.
The flow rate of the feed water shows a decrease of -0.
172 m at 50 seconds.
The boiler pressure rose further to 44 kg/cm-1s-2 at 175 seconds, which corresponds to a specific gravity value of 59.
5 kg/cm3 at the same time.
At 146 seconds, the feed water hits the trip setting of -2.
85m owed to low specific gravity (SG) level when compared to the unautomated condition.
Thus, a further increase reached fluctuation level of -10m at 200 seconds.
The PHT was 88.
5 kg/cm-1s-2 at 146 seconds contrary to the expected pressure of 105.
6 kg/cm-1s-2 for unautomated state.
This change after 146 seconds results from generator trip.
The pressure increases to 90.
2 kg/cm3 at approximately 148 seconds and subsequently decreases to 48 kg/cm3 consequently opening of the condenser steam discharge valve (CSDVs) and atmospheric steam discharge valve (ASDVs) during the simulation state.

Related Results

Hydatid Disease of The Brain Parenchyma: A Systematic Review
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Abstarct Introduction Isolated brain hydatid disease (BHD) is an extremely rare form of echinococcosis. A prompt and timely diagnosis is a crucial step in disease management. This ...
Boiler Efficiency Analysis of A 220mw Steam Power Plant Using Direct Method
Boiler Efficiency Analysis of A 220mw Steam Power Plant Using Direct Method
This paper presents a boiler efficiency analysis of a 220MW steam power plant using the direct method. The procedure employed to determine the boiler efficiency was done using the ...
Analisis Kebocoran Boiler Pipe Akibat Korosi pada Recovery Boiler 5 PT. ABC.
Analisis Kebocoran Boiler Pipe Akibat Korosi pada Recovery Boiler 5 PT. ABC.
Boiler is one component that is widely used in the energy generation industry and reactors. One of the main components of the boiler is the boiler pipe. In field activities, there ...
Gas Disposal Aboard A Floating Production Facility
Gas Disposal Aboard A Floating Production Facility
Abstract The Cadlao Floating Production, Storage and Offloading (FPSO) Facility has on board equipment to separate the oil, water and gas produced from two subsea...
Unbalanced Current Sharing Control in Islanded Low Voltage Microgrids
Unbalanced Current Sharing Control in Islanded Low Voltage Microgrids
This paper reports a new control strategy to improve sharing of unbalanced currents in islanded LV microgrids. This technique provides fast and effective sharing of positive-, nega...
Breast Carcinoma within Fibroadenoma: A Systematic Review
Breast Carcinoma within Fibroadenoma: A Systematic Review
Abstract Introduction Fibroadenoma is the most common benign breast lesion; however, it carries a potential risk of malignant transformation. This systematic review provides an ove...
ANALISIS PERFORMANCE POMPA FEED SENTRIFUGAL
ANALISIS PERFORMANCE POMPA FEED SENTRIFUGAL
To support the optimization of operations at a refinery, a tool is urgently needed that can help process crude oil into a product. The centrifugal feed pump P-100/4 is a pump that ...
Design-Based Thermal Efficiency Correction Method for Hot Water Boiler
Design-Based Thermal Efficiency Correction Method for Hot Water Boiler
Abstract In the boiler design process, the thermal efficiency of the boiler operating under specified parameters is given in accordance with the design specification...

Back to Top