Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

The Analysis of Global RMB Exchange Rate Forecasting and Risk Early Warning Using ARIMA and CNN Model

View through CrossRef
The purposes are to predict exchange rate fluctuations more accurately and enhance Chinese enterprises’ ability to avoid exchange rate risks. Renminbi (RMB) exchange rate fluctuation’s prediction methods are studied based on data mining technology. The Auto-Regressive Integrated Moving Average (ARIMA) model is introduced first using a modeling method that combines linear and nonlinear models. The linear prediction is obtained by the ARIMA model’s application in the RMB exchange rate’s dynamic fluctuation analysis. The nonlinear residual prediction is obtained by integrating the ARIMA model with the convolutional neural network (CNN) algorithm. The RMB exchange rate fluctuations’ influence mechanism on China’s economic growth is explored by theoretical analysis and empirical research. The US dollar’s daily central parity rate (USD) data against the RMB from September 2015 to March 2019 are selected for model verification, obtaining the exchange rate’s logarithmic return sequence (RUSD).
Title: The Analysis of Global RMB Exchange Rate Forecasting and Risk Early Warning Using ARIMA and CNN Model
Description:
The purposes are to predict exchange rate fluctuations more accurately and enhance Chinese enterprises’ ability to avoid exchange rate risks.
Renminbi (RMB) exchange rate fluctuation’s prediction methods are studied based on data mining technology.
The Auto-Regressive Integrated Moving Average (ARIMA) model is introduced first using a modeling method that combines linear and nonlinear models.
The linear prediction is obtained by the ARIMA model’s application in the RMB exchange rate’s dynamic fluctuation analysis.
The nonlinear residual prediction is obtained by integrating the ARIMA model with the convolutional neural network (CNN) algorithm.
The RMB exchange rate fluctuations’ influence mechanism on China’s economic growth is explored by theoretical analysis and empirical research.
The US dollar’s daily central parity rate (USD) data against the RMB from September 2015 to March 2019 are selected for model verification, obtaining the exchange rate’s logarithmic return sequence (RUSD).

Related Results

Peramalan Harga Saham BBRI Menggunakan Metode Hybrid ARIMA-SVR
Peramalan Harga Saham BBRI Menggunakan Metode Hybrid ARIMA-SVR
Abstract. PT Bank Rakyat Indonesia (BBRI) is one of the most popular investment instruments, but it has high stock price volatility due to global and domestic economic factors. Thi...
Prediction of COVID-19 Data Using an ARIMA-LSTM Hybrid Forecast Model
Prediction of COVID-19 Data Using an ARIMA-LSTM Hybrid Forecast Model
The purpose of this study is to study the spread of COVID-19, establish a predictive model, and provide guidance for its prevention and control. Considering the high complexity of ...
Establishment and Application of the Multi-Peak Forecasting Model
Establishment and Application of the Multi-Peak Forecasting Model
Abstract After the development of the oil field, it is an important task to predict the production and the recoverable reserve opportunely by the production data....
Perbandingan Kinerja Peramalan Kurs di Indonesia
Perbandingan Kinerja Peramalan Kurs di Indonesia
Fluctuations in the exchange rate on the money market, both appreciating and depreciating, indicate the volatility that occurs in a country's currency with the currencies of other ...
Modelling and Forecasting the COVID-19 Mortality Rates in Malaysia by using ARIMA Model
Modelling and Forecasting the COVID-19 Mortality Rates in Malaysia by using ARIMA Model
Over the last year, the COVID-19 epidemic has afflicted over 150 million individuals and killed over three million people globally. Various forecasting models attempted to estimate...
Forecasting
Forecasting
The history of forecasting goes back at least as far as the Oracle at Delphi in Greece. Stripped of its mystique, this was what we now refer to as “unaided judgment,” the only fore...
Modelling of non-scheduled air transportation time series based on ARIMA
Modelling of non-scheduled air transportation time series based on ARIMA
Forecasting non-scheduled air transportation demand is essential for effective resource allocation, operational planning, and decision-making. In this paper, the use of the ARIMA (...
Forecasting Non-Gaussian Time Series with TB Data
Forecasting Non-Gaussian Time Series with TB Data
AbstractConventional forecasting models require time series that are stationary over time in terms of mean andvariance. However, we often encounter data that rarely meet this condi...

Back to Top