Research on Cost Pre-control Technology for Prefabricated Substation Projects Based on Small Samples

View through CrossRef
Abstract To accurately predict and control the engineering costs of prefabricated substations under small-sample conditions, in order to accurately forecast and control the cost level of substation project, a combination forecasting model of support vector regression (Referred to as:SVR) based on gray relation analysis (Referred to as:GRA) and particle swarm optimization (Referred to as:PSO) is proposed. The main indexes of project cost, which are input into SVR model optimized by PSO to forecast the substation project cost, are extracted through GRA to avoid the problem of large forecasting error caused by artificial selection of input variables. In addition, SVR model optimized by PSO is used for substation project cost forecasting, which effectively overcomes the blindness of model parameter setting when using a single SVR model to forecast project cost. Through the GRA-PSO-SVR combined optimization model used to predict the cost of the substation project ,we can obtain more accurate investment estimation. A coefficient adjustment method is applied to the predicted values of the cost model for prefabricated substations. This approach ensures the model predictions closely align with actual costs, thereby achieving precise pre-control of initial investment estimates for prefabricated substation projects under construction.
Title: Research on Cost Pre-control Technology for Prefabricated Substation Projects Based on Small Samples
Description:
Abstract To accurately predict and control the engineering costs of prefabricated substations under small-sample conditions, in order to accurately forecast and control the cost level of substation project, a combination forecasting model of support vector regression (Referred to as:SVR) based on gray relation analysis (Referred to as:GRA) and particle swarm optimization (Referred to as:PSO) is proposed.
The main indexes of project cost, which are input into SVR model optimized by PSO to forecast the substation project cost, are extracted through GRA to avoid the problem of large forecasting error caused by artificial selection of input variables.
In addition, SVR model optimized by PSO is used for substation project cost forecasting, which effectively overcomes the blindness of model parameter setting when using a single SVR model to forecast project cost.
Through the GRA-PSO-SVR combined optimization model used to predict the cost of the substation project ,we can obtain more accurate investment estimation.
A coefficient adjustment method is applied to the predicted values of the cost model for prefabricated substations.
This approach ensures the model predictions closely align with actual costs, thereby achieving precise pre-control of initial investment estimates for prefabricated substation projects under construction.

Related Results

Review of Cost Control Research in Prefabricated Construction under EPC Mode
Review of Cost Control Research in Prefabricated Construction under EPC Mode
Aims: Amidst the accelerating global urbanization and growing demand for sustainable development, prefabricated construction emerges as a pivotal transformational force in the cons...
Research on Key Technology and Technical and Economic Indicators of 220kV Prefabricated Cabin Substation
Research on Key Technology and Technical and Economic Indicators of 220kV Prefabricated Cabin Substation
The prefabricated cabin substation is a new type of intelligent substation integrating environmental protection, energy saving, high efficiency and economy. In view of the characte...
Pricing Models under Three-Echelon Prefabricated Construction Supply Chains with Consumer Preferences
Pricing Models under Three-Echelon Prefabricated Construction Supply Chains with Consumer Preferences
With the growing ecological crisis and consumer environmental awareness, there is a general recognition of the urgent need for the reform of the energy-intensive construction indus...
Application of BIM Technology in Prefabricated Green Building Construction Management
Application of BIM Technology in Prefabricated Green Building Construction Management
Increasing the research on BIM Technology of prefabricated energy-saving green building construction can promote the process of prefabricated green construction in the construction...
Life Cycle Cost Analysis and Optimization of Modular Substation
Life Cycle Cost Analysis and Optimization of Modular Substation
Due to the lack of high standardization and specialization, the production scale of modular substation is difficult to meet the established requirements. Compared with traditional ...
Life Cycle Cost Prediction of Substation Based on Advanced PSO and Least Squares Support Vector Machine
Life Cycle Cost Prediction of Substation Based on Advanced PSO and Least Squares Support Vector Machine
Abstract The rapid prediction of the full life cycle cost of substation has guiding significance for the construction of substation. In this paper, a substation full...
A research based on testing method for the whole substation cascaded in digital substation
A research based on testing method for the whole substation cascaded in digital substation
Substation as an important component of the power grid, its safe and steady operation is crucial to the power grid. After building new substation or renovating the old ones, they n...
Echinococcus granulosus in Environmental Samples: A Cross-Sectional Molecular Study
Echinococcus granulosus in Environmental Samples: A Cross-Sectional Molecular Study
Abstract Introduction Echinococcosis, caused by tapeworms of the Echinococcus genus, remains a significant zoonotic disease globally. The disease is particularly prevalent in areas...

Back to Top