Analysis of Workshop Production Scheduling Considering Risk Factors
View through CrossRef
In the process of workshop production scheduling, many risk factors can affect the reliability of production. The factors influencing the production scheduling include time, quality, equipment failure and so on. The stability is critical in the flow shop, so the risk factors related to the production scheduling should be considered in the workshop production. Workshop scheduling is taken as the research object in this paper. Along with the rapid development of database technology, the process of workshop production scheduling also involves the record and statistics of many historical production data. So data analysis technology will be used to analyze the risk factors in the process of workshop scheduling firstly inthis paper. Secondly, the simulation model for production scheduling integrated with the risk factors will be built. The aim of the model is to balance the flow shop plan and improve the production efficiency. Finally, an example is given to show that the risk factors selected in this paper and the model are effective for solving the risk problem of workshop production scheduling.
Title: Analysis of Workshop Production Scheduling Considering Risk Factors
Description:
In the process of workshop production scheduling, many risk factors can affect the reliability of production.
The factors influencing the production scheduling include time, quality, equipment failure and so on.
The stability is critical in the flow shop, so the risk factors related to the production scheduling should be considered in the workshop production.
Workshop scheduling is taken as the research object in this paper.
Along with the rapid development of database technology, the process of workshop production scheduling also involves the record and statistics of many historical production data.
So data analysis technology will be used to analyze the risk factors in the process of workshop scheduling firstly inthis paper.
Secondly, the simulation model for production scheduling integrated with the risk factors will be built.
The aim of the model is to balance the flow shop plan and improve the production efficiency.
Finally, an example is given to show that the risk factors selected in this paper and the model are effective for solving the risk problem of workshop production scheduling.
Related Results
DPTM: An Adaptive Scheduler Design Utilizing Timeslot Matching and Release Methods for Concurrent and Multi-task Interleaved Pipelining-oriented CGRA
DPTM: An Adaptive Scheduler Design Utilizing Timeslot Matching and Release Methods for Concurrent and Multi-task Interleaved Pipelining-oriented CGRA
Coarse-grained reconfigurable architectures (CGRAs) are increasingly employed as domain-specific accelerators due to their efficiency and flexibility. However, the existing CGRA ar...
Visual versus Tabular Scheduling Programs
Visual versus Tabular Scheduling Programs
Effective scheduling in construction is crucial for ensuring timely project completion and maintaining budget control. Scheduling programs play an important role in this process by...
Proizvodnja željeza u kasnoj antici i ranome srednjem vijeku u Podravini – tehnološki aspekti i društveni kontekst
Proizvodnja željeza u kasnoj antici i ranome srednjem vijeku u Podravini – tehnološki aspekti i društveni kontekst
Previous archaeological investigations in present-day Gornja Podravina have created prerequisites for the study of the wider context of iron production in the period of Late Antiqu...
Adaptive Scheduling of Mixing Trucks in Construction Sites with an Improved Deep Q-Network
Adaptive Scheduling of Mixing Trucks in Construction Sites with an Improved Deep Q-Network
The management of concrete mixing station distribution is evolving toward more intelligent and efficient methods. Additionally, in the context of the group operations of commodity ...
Advanced Scheduling Schemes in 4G Systems
Advanced Scheduling Schemes in 4G Systems
The deterministic factor for 4G wireless technologies is to successfully deliver high value services such as voice, video, real-time data with well defined Quality of Service (QoS)...
A Pricing Approach For Grid Resource Scheduling With QoS Guarantees
A Pricing Approach For Grid Resource Scheduling With QoS Guarantees
The paper is targeted at concerning pricing approach for grid resource scheduling with QoS guarantees. The two major parties in Grid, namely, resource consumers who submit various ...
A Pipeline Virtual Service Pre-Scheduling Pattern and its Application in Astronomy Data Processing
A Pipeline Virtual Service Pre-Scheduling Pattern and its Application in Astronomy Data Processing
Based on Open Grid Services Architecture (OGSA), the concept and the formal model of Pipeline Virtual Service (PVS) are proposed and presented in this paper. PVS is used to model a...
Food Production Scheduling: A Thorough Comparative Study Between Optimization and Rule-Based Approaches
Food Production Scheduling: A Thorough Comparative Study Between Optimization and Rule-Based Approaches
This work addresses the lot-sizing and production scheduling problem of multi-stage multi-product food industrial facilities. More specifically, the production scheduling problem o...