Life Cycle Cost Analysis and Optimization of Modular Substation
View through CrossRef
Due to the lack of high standardization and specialization, the production scale of modular substation is difficult to meet the established requirements. Compared with traditional substation construction, there are still practical problems such as high production costs. Therefore, it is still difficult to promote modular substation. Considering the life cycle of modular substation project, Cost Breakdown Structure (CBS) and Engineering Breakdown Structure (EBS) of the modular substation were defined through literature reading and data analysis. Then use the life cycle cost mapping model to further determine the mapping relationship between CBS and EBS. Finally, the connotation and goal of the life cycle cost optimization of modular substation were proposed, which can effectively promote the cost management of modular substation projects and optimization.
Title: Life Cycle Cost Analysis and Optimization of Modular Substation
Description:
Due to the lack of high standardization and specialization, the production scale of modular substation is difficult to meet the established requirements.
Compared with traditional substation construction, there are still practical problems such as high production costs.
Therefore, it is still difficult to promote modular substation.
Considering the life cycle of modular substation project, Cost Breakdown Structure (CBS) and Engineering Breakdown Structure (EBS) of the modular substation were defined through literature reading and data analysis.
Then use the life cycle cost mapping model to further determine the mapping relationship between CBS and EBS.
Finally, the connotation and goal of the life cycle cost optimization of modular substation were proposed, which can effectively promote the cost management of modular substation projects and optimization.
Related Results
Life Cycle Cost Prediction of Substation Based on Advanced PSO and Least Squares Support Vector Machine
Life Cycle Cost Prediction of Substation Based on Advanced PSO and Least Squares Support Vector Machine
Abstract
The rapid prediction of the full life cycle cost of substation has guiding significance for the construction of substation. In this paper, a substation full...
Research on Cost Pre-control Technology for Prefabricated Substation Projects Based on Small Samples
Research on Cost Pre-control Technology for Prefabricated Substation Projects Based on Small Samples
Abstract
To accurately predict and control the engineering costs of prefabricated substations under small-sample conditions, in order to accurately forecast and control the...
A research based on testing method for the whole substation cascaded in digital substation
A research based on testing method for the whole substation cascaded in digital substation
Substation as an important component of the power grid, its safe and steady operation is crucial to the power grid. After building new substation or renovating the old ones, they n...
Design features of modular buildings
Design features of modular buildings
The paper is devoted to modular buildings as а current topic of modern construction. A significant number of studies on this topic have appeared both in Russia and abroad in last y...
The Absence of Smart Technology as One of The Key Factors of Transportation in Modular Construction: A Case Study in Malaysia
The Absence of Smart Technology as One of The Key Factors of Transportation in Modular Construction: A Case Study in Malaysia
Modular construction is a new method introduced to meet the modernisation agenda in the Malaysian construction industry. It provides various benefits to the construction industry, ...
Modular Construction: A Comprehensive Review
Modular Construction: A Comprehensive Review
Modular construction has the potential to transform the construction industry, as most (80–95%) of the modules, which are considered prefabricated buildings, are manufactured off-s...
Process scheduling analysis and dynamic optimization maintaining the operation margin for acetylene fixed-bed hydrogenation reactor
Process scheduling analysis and dynamic optimization maintaining the operation margin for acetylene fixed-bed hydrogenation reactor
AbstractThe full cycle operation optimization of acetylene hydrogenation reactor should be carried out rigidly according to the operation optimization scheme within the operation c...
Research on Key Technology and Technical and Economic Indicators of 220kV Prefabricated Cabin Substation
Research on Key Technology and Technical and Economic Indicators of 220kV Prefabricated Cabin Substation
The prefabricated cabin substation is a new type of intelligent substation integrating environmental protection, energy saving, high efficiency and economy. In view of the characte...