The Key Reconstruction Technology of the Changjiang Yihua Standingpile Wharf

View through CrossRef
According to the need of production and development, the coal unloading wharves of yihua harbor in the lower changjiang river need to be expanded and reconstructed. In the reconstruction, the main body can only be reinforced, not be dismounted, and the reconstruction project can not affect the unloading, so it is with great difficulty. The available plan of the reconstruction is researched and adopted. The inner force of crane girder and bridging beam is calculated by using the theory of elasticity support continuous beam. The piles are assigned with reason, the differential settlement between the new and the old building is nearly eliminated, and the bearing condition of the main structure is improved. So it is needless to carry through driving pile over water or subbottom reinforcing pile foundation under the cross frame of the former wharf . The key technology is boring a pile driving hole in added pile position on the wharf deck of the crane girder side, then to drive the precast piles through the hole on the deck of the wharf with the land vibrating pile driver. The strict restrict of driving piles on the water avoided, at the same time, the coal unloading is not affected. Pile driving on the wharf deck less difficult condition than that one on the water. The practice indicated that this methods is reliable. So it has great guidance meaning to the similar wharf reconstruction project, especially as some ones in which the bearing capacity of the piles can not meet the need under the cross bend frame.
Trans Tech Publications, Ltd.
Title: The Key Reconstruction Technology of the Changjiang Yihua Standingpile Wharf
Description:
According to the need of production and development, the coal unloading wharves of yihua harbor in the lower changjiang river need to be expanded and reconstructed.
In the reconstruction, the main body can only be reinforced, not be dismounted, and the reconstruction project can not affect the unloading, so it is with great difficulty.
The available plan of the reconstruction is researched and adopted.
The inner force of crane girder and bridging beam is calculated by using the theory of elasticity support continuous beam.
The piles are assigned with reason, the differential settlement between the new and the old building is nearly eliminated, and the bearing condition of the main structure is improved.
So it is needless to carry through driving pile over water or subbottom reinforcing pile foundation under the cross frame of the former wharf .
The key technology is boring a pile driving hole in added pile position on the wharf deck of the crane girder side, then to drive the precast piles through the hole on the deck of the wharf with the land vibrating pile driver.
The strict restrict of driving piles on the water avoided, at the same time, the coal unloading is not affected.
Pile driving on the wharf deck less difficult condition than that one on the water.
The practice indicated that this methods is reliable.
So it has great guidance meaning to the similar wharf reconstruction project, especially as some ones in which the bearing capacity of the piles can not meet the need under the cross bend frame.

Related Results

Sedimentation in the Three Gorges Dam and the future trend of Changjiang (Yangtze River) sediment flux to the sea
Sedimentation in the Three Gorges Dam and the future trend of Changjiang (Yangtze River) sediment flux to the sea
Abstract. The Three Gorges Dam (TGD) on the upper Changjiang (Yangtze River), China, disrupts the continuity of Changjiang sediment delivery to downstream and coastal areas. In thi...
PLANNING ANALYSIS OF KALEDUPA PORT WHARF BY USING SAP2000 SOFTWARE
PLANNING ANALYSIS OF KALEDUPA PORT WHARF BY USING SAP2000 SOFTWARE
Kaledupa Port is a public port that serves a limited number of domestic sea transportation activities. With the growth of the tourism sector in Wakatobi Regency, especially at Kale...
Patient informational needs about breast reconstruction post-mastectomy.
Patient informational needs about breast reconstruction post-mastectomy.
88 Background: For many women, receiving a breast cancer diagnosis is further complicated by decisions they will face about breast reconstruction post-mastectomy. While women are ...
Transient Hypoxia Extent Off Changjiang River Estuary due to Mobile Changjiang River Plume
Transient Hypoxia Extent Off Changjiang River Estuary due to Mobile Changjiang River Plume
AbstractObserved oxygen concentrations collected at discrete locations during research cruises were conventionally used to estimate spatial extents of bottom low‐oxygen/hypoxia. Ye...
Biomechanical comparison of tenodesis reconstruction for subtalar instability: a finite element analysis
Biomechanical comparison of tenodesis reconstruction for subtalar instability: a finite element analysis
AbstractBackgroundThere are several types of tenodesis reconstruction designed for subtalar instability. However, no comprehensive comparison has been conducted among these procedu...
Superresolution fluorescence microscopy with structured illumination
Superresolution fluorescence microscopy with structured illumination
The resolution of a conventional fluorescence microscope image is diffraction limited which achieves a spatial resolution of 200nm lateral and 500nm axial. Recently, many superreso...
Inter-scanner Aβ-amyloid PET harmonization using barrel phantom spatial resolution matching
Inter-scanner Aβ-amyloid PET harmonization using barrel phantom spatial resolution matching
AbstractThe standardized uptake value ratio (SUVR) is used to measure Aβ uptake in PET images of the brain. Variations in PET scanner technologies and image reconstruction techniqu...

Back to Top