Utilizing Chelating Agent System Fluid to Remove Scale Buildup from Stuck ESP Shaft in Offshore Saudi Arabia
View through CrossRef
Abstract
Saudi Aramco’s first offshore field produced by electrical submersible pumps (ESPs) has completed a nine year operating cycle, sustaining the field production rate with an acceptable ESP run life in most cases. Recently, a well in this field has experienced a stuck pump shaft shortly after installation. In the past, similar failures in the same well had led to ESP replacement through workover operations. To avoid the same outcome, an effort was initiated to regain operation of the ESP stuck shaft, and realize the production target without a workover.
After the first failure, a scaling tendency analysis exhibited this well to have tendency for carbonate scaling. The Dismantle Inspection and Failure Analysis (DIFA) and laboratory testing of samples taken from the pump stages confirmed the presence of predominantly calcium carbonate scale. The impellers and diffusers of the ESP pump were discovered to be totally blocked with solid precipitation, which had been the cause of frequent pump trips and decreasing production rate. Using parts from the third failed ESP, a chelating-agent-based treatment fluid was designed to dissolve the scale buildup in the stuck ESP shaft without adversely affecting the tubular and downhole equipment. After the treatment, to avoid the reoccurrence of pump failure, scaling indices and thermodynamics of the scale precipitation tendency of the formation water associated with its crude stream were studied. Results indicated that scale inhibitors, such as polyacrylic acid (PAA) or polyphosphinocarboxylic acid (PPCA), bullheaded into the formation may be used to control scale in this well in the future.
With a stuck pump shaft, this well would normally have been worked over to replace the ESP, thereby consuming 10 days of rig time and sustaining potentially avoidable production losses. The goal of the project was to remove the scale accumulation, regain operation of the stuck ESP shaft, and reestablish the production of 5 MBOD. Consequently, a costly workover was avoided and the life of the ESP was increased without compromising the completion. The successful treatment for this stuck ESP shaft, which was carried out by bullheading the treatment fluid is a reference treatment design for similar cases. The history of the well, laboratory studies, and recommendations to avoid scale precipitation in the future are detailed.
Title: Utilizing Chelating Agent System Fluid to Remove Scale Buildup from Stuck ESP Shaft in Offshore Saudi Arabia
Description:
Abstract
Saudi Aramco’s first offshore field produced by electrical submersible pumps (ESPs) has completed a nine year operating cycle, sustaining the field production rate with an acceptable ESP run life in most cases.
Recently, a well in this field has experienced a stuck pump shaft shortly after installation.
In the past, similar failures in the same well had led to ESP replacement through workover operations.
To avoid the same outcome, an effort was initiated to regain operation of the ESP stuck shaft, and realize the production target without a workover.
After the first failure, a scaling tendency analysis exhibited this well to have tendency for carbonate scaling.
The Dismantle Inspection and Failure Analysis (DIFA) and laboratory testing of samples taken from the pump stages confirmed the presence of predominantly calcium carbonate scale.
The impellers and diffusers of the ESP pump were discovered to be totally blocked with solid precipitation, which had been the cause of frequent pump trips and decreasing production rate.
Using parts from the third failed ESP, a chelating-agent-based treatment fluid was designed to dissolve the scale buildup in the stuck ESP shaft without adversely affecting the tubular and downhole equipment.
After the treatment, to avoid the reoccurrence of pump failure, scaling indices and thermodynamics of the scale precipitation tendency of the formation water associated with its crude stream were studied.
Results indicated that scale inhibitors, such as polyacrylic acid (PAA) or polyphosphinocarboxylic acid (PPCA), bullheaded into the formation may be used to control scale in this well in the future.
With a stuck pump shaft, this well would normally have been worked over to replace the ESP, thereby consuming 10 days of rig time and sustaining potentially avoidable production losses.
The goal of the project was to remove the scale accumulation, regain operation of the stuck ESP shaft, and reestablish the production of 5 MBOD.
Consequently, a costly workover was avoided and the life of the ESP was increased without compromising the completion.
The successful treatment for this stuck ESP shaft, which was carried out by bullheading the treatment fluid is a reference treatment design for similar cases.
The history of the well, laboratory studies, and recommendations to avoid scale precipitation in the future are detailed.
Related Results
Harsh Environment ESP System
Harsh Environment ESP System
Objective/Scope
When operating an Electric Submersible Pump (ESP) in a location with high installation or worker costs, the installation can cost much more than t...
Defining the Optimum Properties of Chelating Agents to be used as EOR Fluid for Sandstone Reservoirs
Defining the Optimum Properties of Chelating Agents to be used as EOR Fluid for Sandstone Reservoirs
AbstractMany laboratory core flood investigations proved the increase in the oil recovery by applying low salinity water. However, till now the main mechanism of the oil recovery i...
The Impact of Adding High pH Fluid to Sea Water on The Sandstone Rock Charge During EOR Process
The Impact of Adding High pH Fluid to Sea Water on The Sandstone Rock Charge During EOR Process
Abstract
Many researchers investigated the effect of the ionic strength and the chemistry of the injected water on the oil recovery from sandstone reservoirs. They c...
Wireline Retrievable ESP Deployment: Observation, Challenges and Intervention
Wireline Retrievable ESP Deployment: Observation, Challenges and Intervention
Abstract
The Offshore Field X Project comprises of greenfield scope to expand the Waterflood scheme towards delivering the peak production levels similar to those ac...
Type Curves For McKinley Analysis Of Drill-Stem Test Data
Type Curves For McKinley Analysis Of Drill-Stem Test Data
Abstract
McKinley-type curves that include the effects of short production times (i.e., less than 120 minutes) have been developed for pressure buildup test analy...
NEW SAUDI IRAN NEXUS: PROSPECTS AND CHALLENGES FOR PAKISTAN
NEW SAUDI IRAN NEXUS: PROSPECTS AND CHALLENGES FOR PAKISTAN
Diplomatic relations between the Kingdom of Saudi Arabia and the Islamic Republic of Iran were severed in 2016. This is the result of the two nations' rapprochement, mediated by Ch...
Alternative Offshore Foundation Installation Methods
Alternative Offshore Foundation Installation Methods
Abstract
According to the European Wind Energy Association (EWEA) in the first six months of 2012, Europe installed and fully grid connected 132 offshore wind tur...
An Analysis of Research Productivity in Saudi Arabia and Iran
An Analysis of Research Productivity in Saudi Arabia and Iran
Aim/Purpose: Education is vital as it is a major investment in human capital. Tertiary education, in particular, contributes to the growth of knowledge and advances skills, which h...