Improving Reliability and Reducing Intervention Costs of Ultradeep Subsea Technology at the Design Stage

View through CrossRef
Abstract The current trend in offshore exploration and production (E&P) is geared towards developments in greater depths and harsher environments. The challenge of realizing fields at depths of greater than 5,000 feet normally requires unproven technology operating in harsh environments. Deferred production is a function of reliability and intervention times. Harsh operating conditions in deep waters will have a negative impact on reliability. Long mobilization times for intervention vessels and availability of spare parts are also drivers of the performance of subsea facilities. High day rates for intervention vessels operating in deep waters represent an additional risk to project economics. Target levels of reliability and production availability can be ensured during early design phases through a systematic and rigid reliability management program. As part of the early design optimization effort, a comparison of alternative intervention philosophies and their impact on project economics should also be evaluated. Alternative subsea intervention philosophies may be on an:On demand basis - which is subject to the availability of resources and costs at the time.Contract basis - where intervention resources are available based on agreed contract agreements. This paper describes the potential risks involved with the reliability of novel subsea solutions required for deep water production, the impact of capital intensive intervention costs and a risk-based approach that can be applied to optimize subsea reliability, design and intervention planning. Det Norske Veritas (DNV) has successfully applied detailed simulation modeling techniques within a risk based approach to optimize subsea developments. DNV has supported operators with the following:Estimates for the reliability of novel ultra deep subsea equipment.Prediction of produced and deferred production volumes.Criticality analysis.Concept evaluation.Evaluation of alternative intervention philosophies.Gains in Net Present Value (NPV) based on optimization of design, reliability and intervention planning. Deepwater hydrocarbon production is expected to grow from 10% to 25% of total offshore production by 2015 as hydrocarbon deposits in shallow waters and in more accessible regions become depleted. More is being invested in subsea technology to face the increasing demand for systems and equipment to recover hydrocarbons in deep and ultra-deep waters (greater than 5,000 ft / 1,500 meters). This shift in industry focus will result in some key challenges in the decade ahead. The overall through-life Net Present Value (NPV) of a subsea project is dependent on three factors:Capital Expenditure (CAPEX).Operational Expenditure (OPEX).Revenue Losses.
Title: Improving Reliability and Reducing Intervention Costs of Ultradeep Subsea Technology at the Design Stage
Description:
Abstract The current trend in offshore exploration and production (E&P) is geared towards developments in greater depths and harsher environments.
The challenge of realizing fields at depths of greater than 5,000 feet normally requires unproven technology operating in harsh environments.
Deferred production is a function of reliability and intervention times.
Harsh operating conditions in deep waters will have a negative impact on reliability.
Long mobilization times for intervention vessels and availability of spare parts are also drivers of the performance of subsea facilities.
High day rates for intervention vessels operating in deep waters represent an additional risk to project economics.
Target levels of reliability and production availability can be ensured during early design phases through a systematic and rigid reliability management program.
As part of the early design optimization effort, a comparison of alternative intervention philosophies and their impact on project economics should also be evaluated.
Alternative subsea intervention philosophies may be on an:On demand basis - which is subject to the availability of resources and costs at the time.
Contract basis - where intervention resources are available based on agreed contract agreements.
This paper describes the potential risks involved with the reliability of novel subsea solutions required for deep water production, the impact of capital intensive intervention costs and a risk-based approach that can be applied to optimize subsea reliability, design and intervention planning.
Det Norske Veritas (DNV) has successfully applied detailed simulation modeling techniques within a risk based approach to optimize subsea developments.
DNV has supported operators with the following:Estimates for the reliability of novel ultra deep subsea equipment.
Prediction of produced and deferred production volumes.
Criticality analysis.
Concept evaluation.
Evaluation of alternative intervention philosophies.
Gains in Net Present Value (NPV) based on optimization of design, reliability and intervention planning.
Deepwater hydrocarbon production is expected to grow from 10% to 25% of total offshore production by 2015 as hydrocarbon deposits in shallow waters and in more accessible regions become depleted.
More is being invested in subsea technology to face the increasing demand for systems and equipment to recover hydrocarbons in deep and ultra-deep waters (greater than 5,000 ft / 1,500 meters).
This shift in industry focus will result in some key challenges in the decade ahead.
The overall through-life Net Present Value (NPV) of a subsea project is dependent on three factors:Capital Expenditure (CAPEX).
Operational Expenditure (OPEX).
Revenue Losses.

Related Results

Subsea Factory–Standardization of the Brownfield Factory
Subsea Factory–Standardization of the Brownfield Factory
Abstract As part of the corporate technology strategy Statoil has launched a technology plan for the Subsea Factory concept. The plan describes how to combine subsea...
Domination of Polynomial with Application
Domination of Polynomial with Application
In this paper, .We .initiate the study of domination. polynomial , consider G=(V,E) be a simple, finite, and directed graph without. isolated. vertex .We present a study of the Ira...
Ormen Lange Subsea Production System
Ormen Lange Subsea Production System
Abstract This paper presents the concept and the technical solutions developed and applied to the Ormen Lange subsea production system. First, the key technical c...
Subsea Facilities
Subsea Facilities
Abstract This paper presents the system design and concept solutions selected for the Ormen Lange subsea facilities. The field is located in a r...
A New Approach to Subsea Intervention
A New Approach to Subsea Intervention
ABSTRACT In March 1987 representatives of Statoil and the Asea Brown Boveri Group could witness the completion of a successful sea test of a new subsea interventi...
Design, Installation, And Connection Of Subsea Lines On East Frigg Field
Design, Installation, And Connection Of Subsea Lines On East Frigg Field
ABSTRACT This paper describes the subsea network which interconnects the three subsea templates at EAST FRIGG field, and connects this field to the FRIGG field, 1...
Subsea process design guideline for reliability
Subsea process design guideline for reliability
Abstract This paper presents a new design guideline, based on a computerized tool for assessment of the reliability and cost of subsea process systems. The guidel...
Design
Design
Conventional definitions of design rarely capture its reach into our everyday lives. The Design Council, for example, estimates that more than 2.5 million people use design-related...