Operational Experiences With The Offshore Loading Units Auk-ELSBM And Brent-SPAR
View through CrossRef
Buyzen, J.P.M., Shell Expro UK Ltd. Scotland
Introduction
Shell Expro operates in the British sector of the North Sea on behalf of Shell and Exxon. The company has three operating locations: London, (Head Office), Lowesoft (Southern Gas fields) and Aberdeen (Middle and Northern North Sea). This paper deals with the operation of the Auk-ELSBM (Middle North Sea) and Brent-SPAR (Northern North Sea), activities which are controlled from Aberdeen (Fig. 1).
DESCRIPTION OF THE INSTALLATIONS
General
The hostile environment of the North Sea demands a major effort with respect to the design and effective operation of the offshore loading facilities. Although designs show significant differences, each of these installations is a variation of the Single Point Mooring theme, in that they all incorporate some form of mooring turntable and fluid swivel, which permits the tanker, while remaining moored, to weathervane around the SPM in response to the prevailing weather and sea conditions.
THE AUK-ELSBM (Exposed Location Single Buoy Mooring)
Location
The ELSBM is located 2,000 m from the Auk platform and moored to the seabed by 8 anchors, each weighing 15 tons, which are set around the buoy in a circle with a 460 m radius. Each anchor is attached to the ELSBM by a 3 in. diameter stud link chain and is pretensioned (Fig. 2). The water depth in the Auk field is 84 m.
Title: Operational Experiences With The Offshore Loading Units Auk-ELSBM And Brent-SPAR
Description:
Buyzen, J.
P.
M.
, Shell Expro UK Ltd.
Scotland
Introduction
Shell Expro operates in the British sector of the North Sea on behalf of Shell and Exxon.
The company has three operating locations: London, (Head Office), Lowesoft (Southern Gas fields) and Aberdeen (Middle and Northern North Sea).
This paper deals with the operation of the Auk-ELSBM (Middle North Sea) and Brent-SPAR (Northern North Sea), activities which are controlled from Aberdeen (Fig.
1).
DESCRIPTION OF THE INSTALLATIONS
General
The hostile environment of the North Sea demands a major effort with respect to the design and effective operation of the offshore loading facilities.
Although designs show significant differences, each of these installations is a variation of the Single Point Mooring theme, in that they all incorporate some form of mooring turntable and fluid swivel, which permits the tanker, while remaining moored, to weathervane around the SPM in response to the prevailing weather and sea conditions.
THE AUK-ELSBM (Exposed Location Single Buoy Mooring)
Location
The ELSBM is located 2,000 m from the Auk platform and moored to the seabed by 8 anchors, each weighing 15 tons, which are set around the buoy in a circle with a 460 m radius.
Each anchor is attached to the ELSBM by a 3 in.
diameter stud link chain and is pretensioned (Fig.
2).
The water depth in the Auk field is 84 m.
Related Results
Exposed Location Single Buoy Mooring
Exposed Location Single Buoy Mooring
ABSTRACT
Since 1961 Single Point Moorings (SPM's) have been used successfully in nearly all parts of the world.
Nevertheless the feasibility of ...
The Neptune Spar - Performance Over the First Two Years of Production
The Neptune Spar - Performance Over the First Two Years of Production
Abstract
This paper reviews the performance of the Neptune Spar for the fwst two years of its producing history. Equipment operation and required modifications to...
SS: Spar Technology- Developments in Deepwater spar installation
SS: Spar Technology- Developments in Deepwater spar installation
Abstract
During the last seven years Heerema Marine Contractors (HMC) has installed more than half of all Spars in the deep waters of the Gulf of Mexico. The dual...
The Belly Spar - Design and Verification of an Ultradeepwater Solution
The Belly Spar - Design and Verification of an Ultradeepwater Solution
Abstract
The Spar platform has developed into a well functioning solution for Gulf ofMexico environment. Considering use of this solution in the North Atlantic, t...
Red Hawk Project: Overview and Project Management
Red Hawk Project: Overview and Project Management
Abstract
The Red Hawk Project involved the use of the world's first production cell spar and has achieved first production within 24 months of project sanction. I...
Advancement of Spar VIV Prediction
Advancement of Spar VIV Prediction
Abstract
Vortex Induced Vibration (VIV) of spar hulls is an essential operational issue in high current environments and an important consideration for mooring an...
Neptune Project: Spar Hull, Mooring and Topsides Installation
Neptune Project: Spar Hull, Mooring and Topsides Installation
Abstract
This paper describes the installation of the Neptune Spar at Viosca Knoll Block 826, approximately 90 miles south of Mobile, Alabama in the Gulf of Mexic...
Aquifer Behaviour During Brent Depressurisation and the Impact on Neighbouring Fields
Aquifer Behaviour During Brent Depressurisation and the Impact on Neighbouring Fields
Abstract
The extent of the aquifer in communication with the Brent Field was determined by reviewing the geological and geophysical interpretation and analysing a...