Javascript must be enabled to continue!
Operational Experiences With The Offshore Loading Units Auk-ELSBM And Brent-SPAR
View through CrossRef
Buyzen, J.P.M., Shell Expro UK Ltd. Scotland
Introduction
Shell Expro operates in the British sector of the North Sea on behalf of Shell and Exxon. The company has three operating locations: London, (Head Office), Lowesoft (Southern Gas fields) and Aberdeen (Middle and Northern North Sea). This paper deals with the operation of the Auk-ELSBM (Middle North Sea) and Brent-SPAR (Northern North Sea), activities which are controlled from Aberdeen (Fig. 1).
DESCRIPTION OF THE INSTALLATIONS
General
The hostile environment of the North Sea demands a major effort with respect to the design and effective operation of the offshore loading facilities. Although designs show significant differences, each of these installations is a variation of the Single Point Mooring theme, in that they all incorporate some form of mooring turntable and fluid swivel, which permits the tanker, while remaining moored, to weathervane around the SPM in response to the prevailing weather and sea conditions.
THE AUK-ELSBM (Exposed Location Single Buoy Mooring)
Location
The ELSBM is located 2,000 m from the Auk platform and moored to the seabed by 8 anchors, each weighing 15 tons, which are set around the buoy in a circle with a 460 m radius. Each anchor is attached to the ELSBM by a 3 in. diameter stud link chain and is pretensioned (Fig. 2). The water depth in the Auk field is 84 m.
Title: Operational Experiences With The Offshore Loading Units Auk-ELSBM And Brent-SPAR
Description:
Buyzen, J.
P.
M.
, Shell Expro UK Ltd.
Scotland
Introduction
Shell Expro operates in the British sector of the North Sea on behalf of Shell and Exxon.
The company has three operating locations: London, (Head Office), Lowesoft (Southern Gas fields) and Aberdeen (Middle and Northern North Sea).
This paper deals with the operation of the Auk-ELSBM (Middle North Sea) and Brent-SPAR (Northern North Sea), activities which are controlled from Aberdeen (Fig.
1).
DESCRIPTION OF THE INSTALLATIONS
General
The hostile environment of the North Sea demands a major effort with respect to the design and effective operation of the offshore loading facilities.
Although designs show significant differences, each of these installations is a variation of the Single Point Mooring theme, in that they all incorporate some form of mooring turntable and fluid swivel, which permits the tanker, while remaining moored, to weathervane around the SPM in response to the prevailing weather and sea conditions.
THE AUK-ELSBM (Exposed Location Single Buoy Mooring)
Location
The ELSBM is located 2,000 m from the Auk platform and moored to the seabed by 8 anchors, each weighing 15 tons, which are set around the buoy in a circle with a 460 m radius.
Each anchor is attached to the ELSBM by a 3 in.
diameter stud link chain and is pretensioned (Fig.
2).
The water depth in the Auk field is 84 m.
Related Results
Exposed Location Single Buoy Mooring
Exposed Location Single Buoy Mooring
ABSTRACT
Since 1961 Single Point Moorings (SPM's) have been used successfully in nearly all parts of the world.
Nevertheless the feasibility of ...
SS: Spar Technology- Developments in Deepwater spar installation
SS: Spar Technology- Developments in Deepwater spar installation
Abstract
During the last seven years Heerema Marine Contractors (HMC) has installed more than half of all Spars in the deep waters of the Gulf of Mexico. The dual...
Red Hawk Project: Overview and Project Management
Red Hawk Project: Overview and Project Management
Abstract
The Red Hawk Project involved the use of the world's first production cell spar and has achieved first production within 24 months of project sanction. I...
Contemporary Challenges and Solutions for Post-Katrina Gulf of Mexico Spar Design
Contemporary Challenges and Solutions for Post-Katrina Gulf of Mexico Spar Design
Abstract
Deepwater field developments in the Gulf of Mexico typically consider Spar, Tension Leg Platform and Semisubmersible hull forms as potential candidates f...
Floating LNG: New Rule Note for the Classification of LNG FPSO
Floating LNG: New Rule Note for the Classification of LNG FPSO
Abstract
Offshore LNG terminals are today broadly considered by the industry to respond to the world thirst of energy in a rapid and efficient manner. In order to...
Alternative Offshore Foundation Installation Methods
Alternative Offshore Foundation Installation Methods
Abstract
According to the European Wind Energy Association (EWEA) in the first six months of 2012, Europe installed and fully grid connected 132 offshore wind tur...
Offshore LNG Transfer
Offshore LNG Transfer
ABSTRACT
An offshore transfer system for low-temperature liquids, which allows tankers to be loaded with LNG even under extreme weather conditions, has been devel...
Offshore Dry-Docking of FPSOs: A Response to Industry Needs
Offshore Dry-Docking of FPSOs: A Response to Industry Needs
ABSTRACT
The bonanza of floating production, storage and offloading units (FPSOs) that were commissioned over a decade ago have come to an age whereby offshore as...